Distributed Energy Resources (DER) Experiences at CenterPoint Energy

Slides:



Advertisements
Similar presentations
Distributed Generation (DG)
Advertisements

March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Planning, optimization and regulatory issues
Sistan & Balouchestan Electric Power Distribution Company
How Technology will make Renewable Energy Competitive 10/17/2013
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Interconnection of Distributed Generation
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
Interconnect Protection of Dispersed Generators
Turkish Power System Overview March 2012
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Distributed Generation SWEDE 2006 CenterPoint Energy Walter R. Bartel, P.E. Supervising Engineer Distribution System Reliability.
Renewable Generation Interconnection Ken Brunkenhoefer Distributed Generation Consultant
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Overview and Status of Distributed Energy Resources Policy Docket Jay Griffin, Chief of Policy and Research Hawaii Public Utilities Commission August 4,
Distributed Generation Registration June 30, 2008.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Solving the Energy Puzzle Understanding the Rules of Energy Delivery Electricity Natural Gas Tariffs Solar Combined Heat and Power Generation Distribution.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Nodal Planning Go Live Austin, TX February 3, 2011
Interconnecting Wind & Solar Energy in Texas
Freeport Area Master Plan Project
SUNRISE Update Presented by: Steve Steffel, Alex Dinkel
Power Quality at Solar Distributed Generation Facilities
Sub Station.
Irvine Ranch Water District Distributed Energy Storage Case Study
Effects of Harmonics on Capacitors Electrical System
Impact of Hurricane Ike on
Hurricane Rita.
Distributed Generation
IG BASED WINDFARMS USING STATCOM
Interconnect Protection of Dispersed Generators
Optimizing Circuit Performance Through Data Collection
Compliance Report to ERCOT TAC February 2007
EE6501 POWER SYSTEM ANALYSIS
Microgrids and Energy Storage for Smart City Planning
Interconnection Practice, Policies, Procedures ComEd Illinois
Methane Capture and Use: Current Practices vs. Future Possibilities
Chapter 7 System Protection
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
Working with Utilities Sean W. Carr, P.E., PMP®
31st USAEE/IAEE North American Conference
The Joint Accounting Conference 2018
HIGH DENSITY (ZERO LOT LINE) CONSTRUCTION
Pacific Power Seismic Preparedness Update
Distributed Generation (DG) Modeling Criteria
Net Metering John McComb: P.E.
Jhonny Di Girolamo P.E CenterPoint Energy
Interconnection of AES With The Grid
Nathan Kassees, P.E. Sr. Engineer Oncor Electric Delivery
Connecting small renewable energy generators to the grid in Thailand: case studies & technical requirements Renewable Energy Forum Thursday, 28 October.
Electrical Distribution System Basics
Net Metering John McComb: P.E.
TxMAG presentation
Ahmed Kulab Moh. Abed Foaad Al-Habeel
NYS Department of Public Service
Solar Energy Commercialization
Electrical Energy Supply System
Presentation transcript:

Distributed Energy Resources (DER) Experiences at CenterPoint Energy 2/23/2015 Distributed Energy Resources (DER) Experiences at CenterPoint Energy by James Koinis & Aman Fatma Distribution Planners Approved by: Ed Briggs, P.E. Manager Distribution Planning Presented at SWEDE: 05/04/2018 CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Legal Disclaimer This presentation is being provided for informational purposes only and does not purport to be comprehensive. Neither CenterPoint Energy, Inc., together with its subsidiaries and affiliates (the "Company"), nor its employees or representatives, make any representation or warranty (express or implied) relating to this information. By reviewing this presentation, you agree that the Company will not have any liability related to this information or any omissions or misstatements contained herein. You are encouraged to perform your own independent evaluation and analysis. CenterPoint Energy Proprietary & Confidential Information

Agenda Safety Share Historical Utility Operation What is a DER? Why are DERs connecting to the Utility Grid? CenterPoint Energy DER Experiences Distribution Planning Customer Interaction Metering and Telemetry Distribution Protection References Questions? CenterPoint Energy Proprietary & Confidential Information

Safety Share 2/23/2015 CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Electricity Distribution Background 2/23/2015 CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

DER- Future of Electric Utility 2/23/2015 What is a DER? Distributed Energy Resource (DER) is an electrical generating facility located at a Customer's point of delivery (point of common coupling), 10 megawatts (MW) or less, and connected at a voltage less than or equal to 60 kilovolts (kV), which may be connected in parallel operation to the utility system. [1] Rate of interconnection. Currently CenterPoint Energy has approximately 261MW of existing DERs connected and expecting 189 MW in the coming year. Types of DERs. Renewable Solar Wind Hydro Landfill Gas Non-Renewable Diesel Natural Gas CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

CenterPoint Energy DER Installations 2/23/2015 CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

CenterPoint Energy Installed DER Types 2/23/2015 Diesel 43.1%, 113.5 MW Solar 9%, 23 MW Landfill Gas 6%, 13 MW Natural Gas 42.9%, 112.8 MW CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Why are DERs connecting? 2/23/2015 ERCOT Emergency Response Service (ERS) Four Coincident Peak (4CP) response Load Zone-level wholesale price response in the Real-Time Energy Market Back up Generation Incentive Programs CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Distribution Planning Customer Interaction Metering and Telemetry Our DER Experiences 2/23/2015 Distribution Planning Customer Interaction Metering and Telemetry Distribution Protection CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Distribution Planning - DER Modeling 2/23/2015 CYME 7.2/8.0 for DER studies Features nested views: Interconnection application with detailed One-Line. CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Distribution Planning - DER Modeling 2/23/2015 CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Distribution Planning – Other Concerns 2/23/2015 Split Service Agreements For example, at the Point of Common Coupling (PCC): 12kV – 4MW 2pts of 2MW 35kV – 6MW 2pts of 3MW (*not an all inclusive list*) Voltage Concerns Load Rejection Overvoltage (LRO) Transient or Temporary Overvoltage (TOV) DER Customers not wanting to take kVARs Substation Capacitor Bank CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Substation Capacitor Banks 2/23/2015 Substation Capacitor Banks Received DER customer complaints of tripping due to high voltage. Substation Cap Bank was turned on to provide VARs to the transmission section. DERs that are close to the substation are more prone to high voltage levels causing them to trip. CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

DER and Telemetry 2/23/2015 Need more telemetry to allow operators better understanding of the system. How do you get telemetry? What is the most economical way to obtain the telemetry? Who will pay for the equipment necessary to obtain the telemetry from the DER site? Although DERs are accounted for during Load Forecasting, our large DERs are modeled off because they have not been consistently running during peak load season each year. CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

 / Y-grounded to Y-grounded/Y-grounded 2/23/2015  / Y-grounded to Y-grounded/Y-grounded Due to potential High Voltage damage to equipment, had to change to Y-grounded/Y-grounded transformer for DERs at customer cost Additional Expense and Time CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Customer Interaction Exporting kW Importing kVAR 2/23/2015 CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Protection Experiences 2/23/2015 Why Transfer Trip (TT)? Unintentional islanding may lead to several problems in utility grid such as power quality, voltage and frequency stability, interference etc. How TT affects DERs Time and Money Reverse Power Trip Conditional TT CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Reverse Power Trip Brought about by Customer Request 2/23/2015 Reverse Power Trip Brought about by Customer Request Goal is to have anti-islanding at a lower cost and faster processing time than Transfer Trip. Other Utilities using it in place of Transfer Trip How do you determine the trip set point? What are the risks to CNP or customer’s equipment? We are still in the evaluation phase. CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Conditional Transfer Trip Operation 2/23/2015 Conditional Transfer Trip Operation Used to not trip critical care facilities unnecessarily. It was decided that an additional Meter CT would be used to determine if the generator was on or off. This information could then be used to determine when to trip breaker “A”. Customer’s Relay Generators Meter CT Main Service G B A Meter CT CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

References 2/23/2015 [1] “Distributed Generation.” ERCOT.com : Web. 18 April. 2018. <http://www.ercot.com/services/rq/re/dgresource>. [2] “Smiley Face Happy Thumbs Up.” Pixabay.com : Web. 18 April. 2018. < https://pixabay.com/en/smiley-face-happy-thumbs-up-thumb-147407/> CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information

Questions? 2/23/2015 CenterPoint Energy Proprietary & Confidential Information CenterPoint Energy Proprietary & Confidential Information