Prepared for Municipal Officials in the Prairie Provinces March 2018

Slides:



Advertisements
Similar presentations
Residential Foundations © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture He who has not first laid his foundations may be able with.
Advertisements

Building Enclosure Moisture Management Institute (BEMMI)
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
PERMITS & INSPECTIONS DEPARTMENT 2003 INTERNATIONAL RESIDENTIAL CODE IRC.
PowerPoint Presentation
Chapter 33 Foundation Systems.
Foundation Systems.
NFPA Chapter 6 Chapter 6 is used to classify the occupancy and the hazard contents Proper classification is used to guide the implementation of.
Chapter 19 Floors.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Floor Systems and Foundation Support
Copyright 2008, International Code Council 2012 IECC ® for SERBCA Based on the 2012 International Energy Conservation Code.
Commercial Foundations
Architectural Design Construction of a Wall Section Upon completion of this assignment, you will be able to accurately and neatly draw, to scale and limits,
Balloon Frame North-American invention, 1833
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 10 Slide 1 Unit 10 Commercial Construction.
DRAWING ON EXPERIENCE … BUILDING ON STRENGTH Six Storey Wood-Framed Buildings Unique Structural Opportunities & Challenges Kurt Ruhland, P.Eng. Director,
State of Virginia’s Adoption Uniform Statewide Building Code –Adopts model codes by reference Family of I Codes 2003 edition NEC 2002 edition –Statewide.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Engineering Analysis of NFPA 285 Tested Assemblies
Chapter 28 Structural Components of Framed Construction.
FRAMING SEMINARS 2012 PRESENTED BY KW ENGINEERING 1.
Sprinkler Loads on Trusses
Building Regulations & The Building Control System 4A7 Design & the Built Environment John O’Connor.
Sprinkler Loads on Trusses Educational Presentation.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
Drafting 2 (Arch) Quiz Review #4 Quiz Review. 1. What is the difference between a pier and column? Bearing capacity Soil impact Concrete block Reinforcing.
Leads Institute of Technology & Engineering
Building Construction for the Fire Service
BOMBA BRIEFING QUESTIONAIRE FOR 30 AUGUST 2017
Bottom Chord Live Load Concurrency and Truss Design
APPLICATIONS OF TECHNOLOGY
Use of Resilient Channel or Hat Channel to Meet the Lateral Restraint/Bracing Requirements of the Bottom Chords of MPCWT Floor Systems Overview Revised.
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Use of Cantilevered Sill Plates with MPCWT to Align with Varying Thicknesses of Exterior Sheathing Overview Revised 3/22/2017.
AR-315 BUILDING CODES & BYE LAWS
Prepared by John R. Henry, P.E. Senior Staff Engineer
City of Healdsburg Construction Codes Amendments & Adoption: 2016 Building Standard Codes Title 24 Parts 1 Thru International Property Maintenance.
Competency: Draw wall sections and details.
Educational Overview Revised 6/13/2017
Wood structures Topic 3 Floor Framing
Wood Structures Topic 8 Quality Workmanship
Pre-Contract Cost Control
Module 6: Confirming Compliance
Introduction to Building Codes
Introduction to Building Codes
Residential Foundations
Designing the tiny house
Residential Foundations
Prepared for Municipal Officials in the Prairie Provinces March 2018
Engineering Project Cable Management.
Module 5: Facilitating Compliance with Prefabrication
Building Construction I Sofia Sebastian 1
Module 3: The Factory-Constructed Building Industry
Module 4: Technical Requirements for Prefabricated Buildings – Alberta
Land Use and Development Regulations
Water-Resistive Barriers: Assuring Consistent Assembly Water Penetration Resistance Educational Overview Revised August 31, 2018.
Position Statement on Sealed Truss Placement Diagrams for the 2012 or 2015 International Residential Code Overview Revised 3/23/2017.
Prepared for Municipal Officials in the Prairie Provinces March 2018
Housing Standard Review & Building Regulation changes
Masonry Bearing Walls.
5. HEAVY TIMBER FRAME CONSTRUCTION
Module 7: Challenges – Saskatchewan
Module 2: Factory-Constructed Buildings – Then and Now
Building standards Mr. Da Silva.
Prepared for Municipal Officials in the Prairie Provinces March 2018
© OnCourse Learning.
Building Codes A building code, or building control, is a set of rules that specify the minimum acceptable level of safety for constructed objects such.
Module 7: Challenges – Manitoba
North Carolina Department of Insurance Office of State Fire Marshal
Presentation transcript:

Prepared for Municipal Officials in the Prairie Provinces March 2018 Factory-Constructed Buildings in Canada – Evolution, Regulatory Requirements and Confirmation of Compliance Module 4: Technical Requirements for Prefabricated Buildings – Manitoba Prepared for Municipal Officials in the Prairie Provinces March 2018

Modules Who We Are – CHBA-MOD and MHABC Prefabricated Buildings Then and Now The Industry Technical Requirements Facilitating Compliance Confirming Compliance Challenges Take-Aways Module 4 – Applicable Technical Requirements Module 4 describes the technical requirements that apply to prefabricated buildings in Manitoba. 4 -

Technical Requirements National Model Construction Codes NU YK NT BC NL Manitoba AB Module 4 – Technical Requirements Building regulations in Manitoba, like building regulations in all the provinces and territories, are based on the national model codes. SK QC ON PE NB NS 4 -

Technical Requirements Acts Manitoba Buildings and Mobile Homes Act Module 4 – Technical Requirements Building regulations in Manitoba fall under the Manitoba Buildings and Mobile Homes Act The Act is being updated to: reflect current terminology and to create a level playing field for factory-constructed homes with respect to required permitting. 4 -

Technical Requirements Regulations Manitoba Building Code Regulation (MBC) Manitoba Mobile Homes Standards and Permits Regulation Module 4 – Technical Requirements The related regulations that apply are: Manitoba Building Code Regulation, generally referred to as the Manitoba Building Code Manitoba Mobile Homes Standards and Permits Regulation. Again, these are being updated to: reflect current terminology, products and performance, and to create a level playing field for inspection and approvals processes for factory-constructed homes. 4 -

Technical Requirements Regulations - Provincial: Manitoba Building Code Manitoba Mobile Homes Standards and Permits Regulation Module 4 – Technical Requirements This discussion of requirements that apply to prefabricated buildings focuses on the Manitoba Building Code. 4 -

Technical Requirements Manitoba Building Code (MBC) is based on the NBC with some variations; e.g., references to - The Non-Smokers Health Protection Act - Manitoba Electrical Code - Manitoba Fire Code - Manitoba Plumbing Code - Manitoba Energy Code for Buildings Module 4 – Technical Requirements The Manitoba Building Code is based on the National Building Code with some variations such as: references to - The Non-Smokers Health Protection Act, - the Manitoba Electrical Code, the Manitoba Fire Code, the Manitoba Plumbing Code and the Manitoba Energy Code for Buildings All of the Manitoba Codes reference the national codes with amendments. 4 -

Technical Requirements Manitoba Building Code (MBC) Other variations; e.g., allowing some residential care occupancies to be considered as residential required heat sensors in garages attached to dwelling units drainage requirements specific to house foundations in fine-grain soil more detailed requirements for foundations depending on soil type, including reinforcement mandatory heat recovery ventilation for ventilation systems serving a single dwelling unit lower minimum thermal resistance for tall walls mandatory drain water heat recovery for dwellings Module 4 – Technical Requirements Some other variations include: allowing some residential care occupancies to be considered as residential required heat sensors in garages attached to dwelling units drainage requirements specific to house foundations in fine-grain soil more detailed requirements for foundations depending on soil type, including reinforcement mandatory heat recovery ventilation for ventilation systems serving a single dwelling unit lower minimum thermal resistance for tall walls mandatory drain water heat recovery for dwellings 4 -

Technical Requirements Manitoba Building Code (MBC) for prefabricated buildings – the basics 1. all site work is subject to the applicable requirements of the MBC Module 4 – Technical Requirements For prefabricated buildings, all site work is subject to the applicable requirements of the Code This subject will be discussed in more detail later. …. 4 -

Technical Requirements Manitoba Building Code (MBC) for prefabricated buildings – the basics 1. all site work must comply with the applicable requirements of the MBC 2. all work done in the factory must comply with a) the applicable requirements of the MBC b) Except for Module 4 – Technical Requirements …. all work done in the factory is subject to - - the applicable requirements of the Code Except that … 4 -

Technical Requirements Manitoba Building Code (MBC) for prefabricated buildings – the basics 1. all site work must comply with the applicable requirements of the MBC 2. all work done in the factory must comply with a) the applicable requirements of the MBC b) Except for 1-storey single-family homes that comply with CSA Z240 MH Series, “Manufactured Homes” Module 4 – Technical Requirements …. the Code does not apply to 1-storey single family homes that comply with the CSA standard Z240 MH Series, Manufactured Homes. The references to CSA Z240 are provided in the 4 -

Technical Requirements Manitoba Building Code (MBC) for prefabricated buildings – the basics 1. all site work must comply with the applicable requirements of the MBC 2. all work done in the factory must comply with a) the applicable requirements of the MBC b) Except for 1-storey single-family homes that comply with CSA Z240 MH Series, “Manufactured Homes” Module 4 – Technical Requirements The references to the CSA standard are currently provided in the Manitoba Mobile Homes Standards and Permits Regulation. The titles of the standards indicate that these are seriously out of date and do not reflect current construction. The Manitoba Building Code and the Mobile Homes Standards and Permits Regulation are being updated. The remainder of this module provides information specific to manufactured homes and site work including foundations and anchorage for all prefabricated buildings. Manitoba Mobile Homes Standards and Permits Regulation Regulation references outdated mobile home standards. MBC being updated to reference current edition. 4 -

Technical Requirements CSA Z240 MH Series Manufactured Homes Definition Manufactured home — a transportable, single- or multiple- section, one-storey dwelling that is ready for occupancy on completion of set-up in accordance with the manufacturer’s installation instructions. Note: Setup may include mating of multiple-section homes, painting, and installation of floor finishes, cabinetry, final light fixtures, solid fuel-fired appliances, gas appliances and systems, chimneys and flues. Module 4 – Technical Requirements Z240 MH Series The Z240 MH Series standard defines a manufactured home as “a transportable, single- or multiple-section, one-storey dwelling that is ready for occupancy on completion of set-up in accordance with the manufacturer’s installation instructions.” These homes: may or may not be constructed on a chassis and may be designed for installation on - a point-load surface foundation, or - a full-perimeter foundation. 4 -

Technical Requirements CSA Z240-16 MH Series Manufactured Homes significant updates from 2009 edition: NBC is the default exceptions or additional requirements provided only as necessary to address issues specific to prefabricated buildings few remaining requirements that are less stringent than the NBC some lower energy efficiency performance levels greater floor deflection allowed where assembly is not supporting a gypsum board ceiling or rock, ceramic or porcelain tile flooring some additional differences when compared to the MB Building Code Module 4 – Technical Requirements The CSA Z240 MH Series standard was updated in 2016. There were some significant changes. The standard references the National Building Code and then provides some exceptions or additional requirements to address issues that are specific to prefabricated buildings. The only significant difference is in the area of energy efficiency. As noted, there are also some differences when compared to the Manitoba Building Code. 4 -

Technical Requirements CSA Z240 MH Series Manufactured Homes NOT to be confused with CSA Z241, “Park Model Trailers” Sidebar Module 4 – Technical Requirements Side-Bar Manufactured homes should not be confused with park model trailers, which are constructed to a different standard and are not intended to be used year-round. 4 -

Technical Requirements Park model trailer — a recreational unit that meets the following criteria: a) it is built on a single chassis mounted on wheels; b) it is designed to facilitate relocation from time to time; c) it is designed as living quarters for seasonal camping and may be connected to those utilities necessary for operation of installed fixtures and appliances; and d) it has a gross floor area, including lofts, not exceeding 50 m2 when in the set-up mode, and has a width greater than 2.6 m in the transit mode. Sidebar Module 4 – Technical Requirements Park model trailers MUST be constructed on a chassis. They are meant to be used only for temporary accommodation in the warmer seasons and the standard specifies dimensional limits. 4 -

Technical Requirements Manufactured Homes Park Model Trailers Sidebar Moduline, BC Grandeur Homes, MB Module 4 – Technical Requirements Z240 MH vs. Z241 While some park model trailers may look similar to some manufactured homes, their construction is quite different. For example, for park model trailers: minimum insulation levels are RSI 1.41 (R-8) in the walls and RSI 2.11 (R-12) in the floor and ceiling, there are no requirements for air barriers or vapour barriers no standard is referenced for windows Park model trailers are not currently recognized in: the Manitoba Building Code the Manitoba Mobile Homes Standards and Permits Regulation, or RV regulations. this is being addressed in the updates to the Act and Regulations. . 4 -

Technical Requirements Site Work must comply with the MBC Building Code in all cases: siting; e.g., re. spatial separation site preparation [9.12.] footings and foundations [9.15.] service hook-ups other work not completed in the factory for multi-module buildings “stitching” together to maintain integrity of protection - air barrier, vapour barrier, insulation - weather barrier, cladding, roofing - fire protection Module 4 – Technical Requirements Site Work As noted, all site-work must comply with the Manitoba Building Code. For all prefabricated buildings, this includes: siting; to comply, for example, with the spatial separation requirements site preparation [9.12.] footings and foundations [9.15.] service hook-ups other work not completed in the factory For multi-module buildings, the Manitoba Building Code requirements apply to “stitching” the modules together to maintain integrity of the building envelope and fire protection. 4 -

Technical Requirements Foundations for All Prefabricated Buildings all buildings to be installed on “permanent foundations” foundations that comply with Code Part 9 options: perimeter foundations - depth depending on soil type and frost point-support in-ground foundations (piles designed to Part 4) - depth depending on soil type, frost depth point-support surface foundations - limits on application Module 4 – Technical Requirements Foundations Prefabricated buildings must be installed on permanent foundations. The industry considers a permanent foundation to be any foundation that complies with Code. Part 9 offers a number of options: full-perimeter foundations with depth depending on soil type and frost depth point-support in-ground foundations - engineered piles– again with depth depending on soil type and frost depth and point-support surface-foundations with some limitations on use CSA Z240.10.1-16 4 -

Technical Requirements Foundations all buildings to be installed on “permanent foundations” foundations that comply with Code Part 9 options: perimeter foundations - depth depending on soil type and frost point-support in-ground foundations (piles designed to Part 4) - depth depending on soil type, frost depth point-support surface foundations - limits on application CSA Z240.10.1 Site Preparation, Foundation and Anchorage of Manufactured Homes Module 4 – Technical Requirements Foundations This last option is where CSA Z240.10.1 comes into play. CSA Z240.10.1-16 4 -

Technical Requirements Foundations point-support surface foundations permitted where: foundation complies with Z240.10.1 Site Preparation, Foundation and Anchorage of Manufactured Homes [referenced in National Building Code 9.15.1.3.] AND the building is not on frost-susceptible soil [see NBC Table 9.12.2.2.] OR a) has no masonry AND b) passes the deformation resistance test in Z240.2.1 Technical Requirements for Manufactured Homes [see NBC 9.12.2.2.(6) and 9.15.1.3.] Module 4 – Technical Requirements Foundations The National Building Code permits point-support surface-foundations where: the building is detached the foundation complies with Z240.10.1 Site Preparation, Foundation and Anchorage of Manufactured Homes [ref. BCBC 9.15.1.3.] and the building is not on frost-susceptible soil [ref. NBC Table 9.12.2.2.] OR a) has no masonry AND b) passes the deformation resistance test in Z240.2.1 Technical Requirements for Manufactured Homes [ref. NBC 9.12.2.2.(6) and 9.15.1.3.] It is easy to confirm whether a building has masonry. Confirming compliance with the deformation resistance test is discussed in Module 6. 4 -

Technical Requirements Anchorage all buildings must be anchored against wind and earthquake loads unless this can be shown to be unnecessary [NBC 9.23.6.1] Part 9 options: embedding floor joists in perimeter foundation [NBC 9.23.6.1.(2)(a)] anchoring sill plate to perimeter foundation [NBC 9.23.6.1.(2)(b)] anchoring in compliance with Z240.10.1 Site Preparation, Foundation and Anchorage of Manufactured Homes [NBC 9.23.6.3.] where the building is not more than 4.3 m wide (14’)- 1 storey in building height Module 4 – Technical Requirements Anchorage Similarly, all prefabricated buildings must be anchored in accordance with the National Building Code unless this can be shown to be unnecessary. Part 9 provides three options: embedding floor joists in a perimeter foundation [NBC 9.23.6.1.(2)(a)] anchoring sill plate to a perimeter foundation [NBC 9.23.6.1.(2)(b)] anchoring in compliance with Z240.10.1 Site Preparation, Foundation and Anchorage of manufactured Homes [NBC 9.23.6.3.] where the building is not more than 4.3 m wide (14’)- 1 storey in building height 4 2

Technical Requirements Anchorage Z240.10.1 Site Preparation, Foundation and Anchorage of Manufactured Homes [NBC 9.23.6.3.] where anchorage is required depending on resistance to overturning and pier toppling due to wind minimum pull-out resistance determined by engineering OR two deemed to comply solutions minimum installation depth maximum spacing where means of adjustment is required Module 4 – Technical Requirements Anchorage Z240.10.1 specifies where anchorage is required minimum pull-out resistance - which must be determined by engineering OR - by using one of two deemed to comply solutions minimum depth maximum spacing where means to adjust the length of the anchors is required 4 2

Technical Requirements Z240.10.1-16 Site Preparation, Foundation and Anchorage of Manufactured Homes Installation of Buildings Application site preparation and skirting apply to all buildings on surface foundations stitching applies to all multi-module buildings foundation requirements apply where – - the building is 1 storey - no masonry, heavy roofing, or concrete floor topping - uniformly distributed live floor load ≤ 2.4 kPa (limits to application of anchorage requirements are specified in the NBC) Module 4 – Technical Requirements Z240.10.1 – Updates - Application A new edition of Z240.10.1 was published in 2016 titled Site Preparation, Foundation and Installation of Buildings to better reflect the scope and application of the standard. The applications of various sets of requirements are more clearly and accurately stated: site preparation and skirting apply to all buildings on surface foundations stitching applies to all multi-module buildings foundation requirements apply where – - the building is 1 storey - there is no masonry, heavy roofing*, or concrete floor topping and - the uniformly distributed live floor load does not exceed 2.4 kPa the limits to the application of the anchorage requirements are specified in the building code as described previously *Heavy roofing includes concrete or clay roof tile 4 2

Technical Requirements Z240.10.1-16 Technical new Tables for minimum pier footing areas for buildings weighing not more than 1.9 kg/m2 depending on - - soil bearing pressure - snow load - tributary area supported new calculation and Tables for resistance to overturning due to wind depending on: - building weight - building width - spacing between supporting beams - 1-in-50 hourly wind pressure - updated wind exposure factors consistent with NBC Part 4 Module 4 – Technical Requirements Z240.10.1 – Updates - Technical Notable technical updates include: new Tables for minimum pier footing areas for buildings weighing not more than 1.9 kg/m2 depending on – - soil bearing pressure - snow load - the tributary area supported a new calculation and Tables for resistance to overturning due to wind to determine if anchorage is needed. The resistance values depend on – - building weight - building width - spacing between supporting beams - 1-in-50 hourly wind pressure and - exposure factors that have been updated consistent with Part 4 of the National Building Code. These up-dates should give building officials even more confidence in accepting surface foundations and anchorage that complies with the standard. 4 2