Resource Adequacy Demand Forecast Coincidence Adjustments

Slides:



Advertisements
Similar presentations
2013 Statewide BIP Load Impact Evaluation Candice Churchwell DRMEC Spring 2014 Load Impacts Evaluation Workshop San Francisco, California May 7, 2014.
Advertisements

R RA Phase II Proposals Workshop (day 2) January 25, 2011 Court Yard room 10:00 am- 2:45 pm.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
What’s Needed for Rational Discussion of Resource Adequacy: A Framework and Some Facts * presented by Kevin Woodruff, Principal, Woodruff Expert Services,
Status Report: Resource Adequacy (RA) and Long Term Procurement Planning (LTPP) CPUC Energy Division Molly Tirpak Sterkel cpuc.ca.gov; Tel:
Public Interest Energy Research –Natural Gas Program Status Presentation to Air Emissions Advisory Committee May 12, 2005 Philip Misemer California Energy.
1 Resource Adequacy (RA) Workshop Presentation by: Sue Mara On Behalf of: Alliance for Retail Energy Markets (AReM) January 18, 2011.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
California Energy Commission Draft Rate Scenario Model Methodology DAWG Forecasting Subgroup Sept. 11, 2014 Lynn Marshall Supply Analysis.
Resource Adequacy Forecast Adjustment(s) Allocation Methodology
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Overview – Non-coincident Peak Demand
California Energy Commission Retail Electric Rate Projections: Preliminary Cases 2015 Integrated Energy Policy Report California Energy Commission July.
Coincident Peak Load Forecasting Methodology Prepared for June 3, 2010 Meeting with Division of Public Utilities.
SM SOUTHERN CALIFORNIA EDISON® Page 1 Discussion on CEC’s and SCE’s Forecast Differences Presentation at CEC Preliminary Demand Forecast Workshop July.
Measurement, Verification, and Forecasting Protocols for Demand Response Resources: Chuck Goldman Lawrence Berkeley National Laboratory.
California SONGS\OTC Plants Assumptions TEPPC – Data Work Group Call Tuesday, September 15, 2015.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
California Energy Commission California Energy Demand Preliminary Electricity Forecast July 7, 2015 Chris Kavalec Energy Assessments Division.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
Avoided Cost and E3 Calculator Workshops Energy and Environmental Economics, Inc. October 4, 2005.
1 Energy Division Workshops: LTPP Planning Standards (Part 1) & Procurement Rulebook June 11, 2010 Workshop R , Tracks 1, 2, & 3.
California Energy Commission Plug Loads in the Residential and Commercial Forecasts June 18, 2015 Tom Gorin Energy Assessments Division
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
1 California Solar Initiative Low Income Multifamily Program Public Workshop March 17, 2008 San Francisco, CA.
Rocky Mountain Power - Utah Workgroups I and II Load Research and Peak-Hour Forecasting Presented by UTAH INDUSTRIAL ENERGY CONSUMERS Salt Lake City, Utah.
Avoided Cost and E3 Calculator Update Workshop March 14-15, 2006.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
ERCOT PUBLIC 10/7/ Load Forecasting Process Review Calvin Opheim Generation Adequacy Task Force October 7, 2013.
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 2/26/15 Asish Gautam Demand Analysis Office Energy Assessments Division.
2015 California Statewide Critical Peak Pricing Evaluation DRMEC Spring 2016 Load Impact Evaluation Workshop San Francisco, California May, 2016 Prepared.
1 R Workshop on 2016 RA proposals Energy Division Staff Procurement Oversight and Resource Adequacy California Public Utilities Commission Thursday,
Energy Storage and Distributed Energy Storage (ESDER) Initiative California Independent System Operator CAISO – CPUC Energy Storage Workshop May 3, 2016.
2013 Load Impact Evaluation Capacity Bidding Program (CBP) Steve Braithwait, Dan Hansen, and Dave Armstrong Christensen Associates Energy Consulting DRMEC.
April 5, 2016 CPUC. JDRP Proposal  Flexible RA Attributes and requirements should be unbundled from the underlying system RA and Local RA attributes.
DRMEC Spring 2016 Load Impacts Evaluation Workshop San Francisco, California May 10, SDG&E Summer Saver Load Impact Evaluation.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
1 PG&E Proposals for Refinements to the Resource Adequacy (RA) Program Compliance Year 2017 RA Workshop February 18, 2016.
Matinee Pricing Opt-in Pilot Rate Proposal (R ) Commission Workshop February 24, 2016 Manager, Pricing Design.
Resource Adequacy Coincident Adjustment Factor Methodology Miguel Cerrutti Demand Analysis Office Energy Assessments Division R Workshop California.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
May 9 th, 2016 California Public Utilities Commission Power Charge Indifference Adjustment (PCIA) Workshop.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
Direct Participation Enrollment Process for 2017 DRAM
LNBA Subgroup: Avoided Transmission Value
California Product Offerings
Self-Generation Forecast CED 2017 Preliminary
Time of Use Rates: A Practical Option – If Done Well
Emergency Response Service Baselines
Mike Jaske California Energy Commission
Preliminary Electricity Rate and Time of Use Rate Scenarios
Chris Kavalec Demand Analysis Office
California Energy Demand Electricity Forecast (CED 2014) Update: Method and Summary of Results November 5, 2014 Chris Kavalec Demand Analysis.
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Revised Electric Rate Scenarios:
CPUC Rate Proceedings Relevant for TOU
Independent Load Forecast Workshop
SDG&E Procurement Perspective IEPA 35th Annual Meeting September 21st, 2016 Dan Skopec Vice President, Regulatory Affairs Sempra Energy Utilities.
Introduction to Growth Scenario Working Group
Avoided Cost and E3 Calculator Update Workshop
Behavior Modification Report with Peak Reduction Component
Combined Heat and Power Program Settlement
Presentation transcript:

Resource Adequacy Demand Forecast Coincidence Adjustments 2013 Resource Adequacy Workshop January 26, 2012 Lynn Marshall Electricity Supply Analysis Division Lynn.Marshall@energy.state.gov / 916-654-4767 California Energy Commission www.energy.ca.gov

RA Year Ahead Demand Forecast Process 1.Each Jurisdictional LSE submits a noncoincident monthly peak forecast, for each TAC area for the forthcoming calendar year. 2.CEC makes adjustments for reasonableness, demand-side impacts, and consistency (within 1%) with the CEC reference forecast for each TAC area. 3.CEC applies a TAC-area-specific monthly factor to adjust each LSE monthly peak forecast for coincidence with the CAISO system peak. Current RA rules that the same factor is applied to all jurisdictional LSE’s. California Energy Commission www.energy.ca.gov

Table 1: 2012 RA Coincidence Factors for CPUC-Jurisdictional LSEs California Energy Commission www.energy.ca.gov

Current Coincidence Rule “... PG&E recommends addition of a single adjustment factor for all LSEs. Thus, each LSE's forward procurement obligation would be its final, forecasted non-coincident load for a month, as determined by the CEC, reduced by a factor that reflects the average load diversity ... in that month. As PG&E notes, averaging is more stable and easier to calculate, monitor, and apply. We adopt the PG&E approach, and grant discretion to the CEC to determine the exact method by which the PG&E approach is implemented.” (CPUC Decision 05-10-042 October 27, 2005 page 35) 2011 RA Workshop The AREM proposal to use LSE-specific or sector-specific coincidence factors was considered. CEC Staff presented data on LSE and sector coincidence demonstrating the inaccuracies caused by the current rule. A customer moving from an IOU, whose actual load is highly coincident with the system peak, to an ESP with more diversity, will in effect lose the diversity benefit.

California Energy Commission CPUC Decision 11-06-022 June 23, 2011: “An average coincidence factor across all customer classes hides certain cost differences among classes and LSEs. In essence, this method serves as a cross subsidy from industrial and commercial customers to residential .” Finding of Fact 5, p. 63 “The average coincident factor method is also inconsistent with methods used to develop a bundled customer forecast in support of the Commission's long-term procurement process. In both RA and long-term procurement proceedings, the Commission has determined that the adopted CEC forecast is to serve as the reference case. The CEC also provides LSE-specific coincidence adjustments to each California LSE which is outside of the Commission's jurisdiction for LSEs' use in CAISO RA compliance filings. Adopting an LSE-specific methodology for RA would harmonize the long-term procurement process and RA procurement process, as well as improve cost allocation related to cost causation.” (p. 17) California Energy Commission www.energy.ca.gov

CEC Staff Demand Forecast Coincidence Methods Accounting for LSE coincidence with TAC and CAISO peaks is part of CEC demand forecasting methods. Bundled and direct access are distinct, with ESPs modeled as a group.* For RA, CEC staff estimate coincidence for the aggregate of IOU service area loads using historic hourly loads (the sum of bundled and direct access) CEC staff prepare LSE-specific factors for each nonjurisdictional LSE in the CAISO using LSE hourly loads. CEC coincidence adjustments are required by the CAISO tariff. The same method can be applied to jurisdictional LSEs. This would be address cost-shifting, and allow for consistency with LTTP assumptions. *See for example p.44 and p. 51 in http://www.energy.ca.gov/2009publications/CEC-200-2009-012/CEC-200-2009-012-CMF.PDF. California Energy Commission www.energy.ca.gov

CEC LSE Specific Coincidence Concept: expected load at the time of a 1-in-2 system peak Data: 1-3 years of hourly loads for CAISO and for each LSE Estimated hourly impacts of demand response events Weather data Hourly loads are adjusted for demand response events. Weekends and holidays, and days with atypical weather are excluded For most LSEs, the coincidence factor used is the median coincidence of the upper 0.5 % of system peak hours, ranked by the magnitude of the CAISO peak. Validation includes evaluation of consistency with forecast, comparison across years, comparison with average peak hour loads

Application to Year-Ahead RA Forecasts The historic load method is also valid for jurisdictional LSEs. Each LSE’s historic hourly loads within a TAC area reflect the factors that determine coincidence: customer characteristics and the geographic distribution of their load. Most LSE’s load composition does not change significantly from year to year, so recent loads, taking into account temperature, usually provide the best estimate of expected coincidence patterns. ESP forecasts are based heavily on current customers. Direct access enrollment is capped, so there is limited opportunity for migration. California Energy Commission www.energy.ca.gov

Year-Ahead Implementation Issues IOUs should provide CEC with demand response capacity (in MW) by program and LSE. This would improve allocation of DR event impacts to hourly loads. An additional validation check can be implemented to correct for within-month load migration For new LSE’s, composite ESP factors for each TAC area can be used. It may occasionally occur that a small LSE forecasts a significant change from the previous year. CEC can use alternative methods to develop appropriate factors, such as are currently used for non-CPUC jurisdictional LSEs or the CEC’s own forecast. For example, development of factors for water pumping LSEs take into account variations in hydrologic conditions. California Energy Commission www.energy.ca.gov

Month-Ahead Coincidence Adjustments Revised monthly forecasts are submitted 2 months before the compliance period. Month ahead forecasts may be revised for load migration only. Over the course of a year, 1 to 2 percent of service area load (or less) migrates, but for smaller LSE’s the percentage change can be much larger. Adjustments should be consistent within a TAC area, for a given customer AREM proposes multiple LSE-type categories, but this would result in different factors for the same customer. IOU load profiles could be used to adjust migration by class; trade-off of “accuracy” versus forecast preparation difficulty. Load profiles are based on samples of all customers in a class, not specifically direct access. Individual customers will deviate from average. California Energy Commission www.energy.ca.gov

Table 3: Illustrative Coincidence Factors for SCE Area California Energy Commission www.energy.ca.gov

Options for Month-Ahead Coincidence Adjustment Data sources for Table 3: SCE 2011 RA factors were estimated from the sum of SCE bundled and all ESP hourly loads. Composite SCE ESP estimated from sum of SCE ESP hourly loads. SCE load profile factors are estimated from SCE’s 2010 rate group load profiles developed for settlement purposes. Similar data are available for PG&E and SDG&E. (http://www.sce.com/AboutSCE/Regulatory/loadprofiles/default.htm) Alternative 1: Use an ESP composite factor for all non-CCA migrating load. Have a separate factor for CCA load. Alternative 2: Use class-specific groups by TAC area. Each LSE would need to report net load migration by group in their month-ahead load forecast. California Energy Commission www.energy.ca.gov