Cause of Sudden Due in TMS for KM – BZA Division

Slides:



Advertisements
Similar presentations
The VAT Declaration Applicable for Persons Registered under Article 11.
Advertisements

Accounting for Plant Assets and Depreciation
(Machine Maintenance Information System)
Accounting for Plant Assets and Depreciation
CENTURY 21 ACCOUNTING © 2009 South-Western, Cengage Learning LESSON 18-4 Disposing of Plant Assets.
Business Statistics Seminar Programme- 11th November :30 Registration 14:00 Opening remarks - Richard McMahon, CSO 14:20 Using administrative data.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
Fractions of Quantities
Section 5.7 Compound Interest.
Use the resources on the internet and each other to help you relearn the concept. Use whiteboards. Work together.
USFD BZA USFD BOOKLET.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
网上报账系统包括以下业务: 日常报销 差旅费报销 借款业务 1. 填写报销内容 2. 选择支付方式 (或冲销借款) 3. 提交预约单 4. 打印预约单并同分类粘 贴好的发票一起送至财务 处 预约报销步骤: 网上报账系统 薪酬发放管理系统 财务查询系统 1.
Turn in Do Nows Turn in Do Nows Day and Night Day and Night Why do you think the Earth experiences day and night? None None
ANNOUNCEMENTS. EVENTS CALENDAR TITLE OF EVENT Details about the event. Date: Month, Day Time: 00:00-00:00 Location: Campus Building.
Understanding how a typical
Mid-Term Review Day 3.
Reconciling a Bank Statement
LESSON 18-2 Calculating Depreciation Expense
LESSON 18-2 Calculating Depreciation Expense
LESSON 18-3 Journalizing Depreciation Expense
USFD VIJAYAWADA DIVISION.
Solving Absolute Value Equations and Inequalities
USFD.
© 2014 Cengage Learning. All Rights Reserved.
Understanding how a typical
© 2014 Cengage Learning. All Rights Reserved.
Online Gifts Buy for wishes happy mother's day to yours choice and with happy gifts find here:
ULTRASONIC TESTING OF RAIL
The Demographic of Indiana FAFSA Filers Who Are the Likely Late Filers? James J. Zheng, Ph.D. State Student Assistance Commission of Indiana (SSACI) 26th.
Entering a No Leave Taken
به نام خدا.
Probate Overdue Processing
PAYROLL REGISTER 1. Pay Period Date 8. Health Insurance
LESSON 12-3 Preparing Payroll Records
STRAIGHT-LINE DEPRECIATION
Presentation on IMR flaw analysis
Red: Flooding, during a 10-day accumulation
Bellringer – use pencil
Unit 4. Day 8..
Red: Flooding, during a 10-day accumulation
Structure Chart Equipment Tracking & Inspection System 1 User Login 2
User Manual for Extracting the Defaulting Report from SAP
Red: Flooding, during a 10-day accumulation
Red: Flooding, during a 10-day accumulation
Section 5.3A: Similar Triangles
Section 4.1 Divisibility and Factors
PREPARING PLANT ASSET RECORDS
Red: Flooding, during a 10-day accumulation
The Penny What would you rather have for your allowance in a month? 100 dollars, or 1 penny, that every day of the month became twice what it was the day.
CorePure2 Chapter 4 :: Volumes of Revolution
© 2014 Cengage Learning. All Rights Reserved.
(Financial Statements) Accounting Principles, Eighth Edition
$ $ $ $ Section 3 Payroll Records What You’ll Learn Chapter 12
Red: Flooding, during a 10-day accumulation
Agenda Criteria for _____________ Date: _________
ANNUAL RETURNS UNDER GST ACT
Section 6.3 – Polynomial Division
DNO Obligations to Facilitate Resolution of Unresolved USRVs
Finding Principal, Rate, and Time
Steps to register through Web Advisor
Historical Information
LESSON 12-3 Preparing Payroll Records
Do Now Simplify. 1. 5(7) – (18 – 11)  (40 – 35) (12 – 4)
Math-7 NOTES 1) 3x = 15 2) 4x = 16 Multiplication equations:
LESSON 19-2 Calculating Depreciation Expense
Thing / Person:____________________ Dates:_________________
All Right Reserved © JiJi Technologies Pvt Ltd
PAYROLL REGISTER 1. Pay Period Date 8. Health Insurance
LESSON 12-3 Preparing Payroll Records
Presentation transcript:

Cause of Sudden Due in TMS for 6.032 KM – BZA Division

Due Overdue as on 02/04/2018 is 6.032 LKM Km 147/0 – 148/0 DN Line – GDR-VKT Due Overdue as on 02/04/2018 is 6.032 LKM

Checking Asset Register Km 147/0 – 148/0 DN Line – GDR-VKT

Test free period 25% of GMT i.e 880x25% = 200 GMT Km 146.161 to 148.950 = 2.801 LKM Accumulated GMT- 202.44 For 60Kg - Rail life – 800 GMT Test free period 25% of GMT i.e 880x25% = 200 GMT Annual GMT of GDR-VKT Dn Ln Section = 35.35 Frequency – till Rail GMT attains 200GMT It must be tested for every 40 GMT

Km 147/0 – 148/0 DN Line – GDR-VKT Last USFD Inspection Date = 18/05/2017 &19/05/2017 As per AGMT = 35.35 Next due must be 40/35.35=1.13 YEARS Which should be after 412 days then date should be 04/07/18. then why Suddenly it appears on 02/04/18?

It appears as Rail Crossed 200GMT and become 202.44 And falls in Need Based concept Testing. Its frequency changed to 3 Months as per AGMT, and Next Due date shown as 18/08/17 suddenly on 02/04/2018