DRSEC Update August 4th 2009.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Trades and Transfers Activity to Date. 2 Introduction  Trade and Transfer functionality added to RMSEC auction (renamed RMTTSEC) from July, applying.
Discretionary Release Interruptible Entry Capacity 1st November 2007.
Exit Reform Review Transmission Workstream 07 January 2010.
Transfer & Trades Special Transmission Workstream
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Review Group 221: Option 3 – security provided after allocation.
Mod Clarifications Transmission Workstream 6 August 2009.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
September 2008 QSEC auction - Allocations Transmission Workstream
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
2005/06 Safety Monitors Presentation to Gas Transmission Workstream, 5 January 2006.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
DRSEC Update Transmission Workstream 06 November 2008.
Entry Capacity transfers in the constrained period Transmission Workstream 5 th October 2006.
Trades and Transfers Workshop, 6 th November 2007.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Transfers and Trades Special Transmission Workstream
Proposer: Matthew Hatch Panel Date: 20/10/16
Entry Capacity Overrun price calculation
Transmission Workstream, 01 October 2009
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Workstream, 2nd March 06
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
1Y Resume Review Process – Fall 2014 – Key Dates
Transmission Workgroup – 1st December 2011
Entry Capacity - update
Capacity Methodology Statements: Impact of Mod 452
Action from Workshop 3 – SUB010
Discretionary Non Obligated Capacity release
Capacity Methodology Statements
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
Assignment of NTS Entry Capacity – Background and UNC Obligations
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Background to National Grid’s Baseline analysis
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Enduring NTS Exit Capacity Arrangements - Update
Transmission Planning Code Review
QSEC auction timetable
Modification 501 slides for Workgroup
Long Term Non Firm Capacity Update
MOD Deemed applications – User pays initial thoughts.
Transmission Workstream – Partial Assignment
Review of Trade and Transfer Winter 09/10
Entry Capacity Transfer and Trade
Baseline Re-consultation
Entry Overrun Calculation
Review Group 0334 User Pays update – Modifications 288, 289, 290.
Transmission Workstream – 6th July 2005
Richard Fairholme E.ON UK
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
Modification 501 slides for Workgroup
ASEP Allocation Graphs
Stefan Leedham Transmission Workstream 2nd November 2006
Review Group 221: Review of Questions from Session 2
Entry Capacity Transfers - Constrained Period
Presentation transcript:

DRSEC Update August 4th 2009

DRSEC - Background Discretionary Release of System Entry Capacity Auction Introduced in September 2008 (Mod 216) DRSEC attributes Release additional non obligated firm NTS entry capacity (i.e. in addition to unsold obligated NTS entry Capacity); At those points on the network where it can be supported and there is sufficient demand Capacity released at the ASEP is solely at National Grid NTS’ discretion

DRSEC Update National Grid NTS received a DRSEC request at Isle of Grain for Winter 09/10 National Grid NTS issued an open letter to all Users requesting that Users register their interest No additional requests were received National Grid NTS issued a DRSEC invitation letter for: Isle of Grain Avonmouth Easington Garton Hole House Farm Hatfield Moor Onshore ASEPs with 10% or less of obligated unsold entry capacity were included * Please note where aggregate requests for capacity do not exceed the level of obligated unsold NTS Entry Capacity; bids will not be allocated.

Going Forward Auction Date Monday 17th August Users who wish to bid must accept the Terms and Conditions no later than 4pm Thursday 13th August via fax. Bids from Users who have not accepted the Terms and Conditions will not be accepted. Allocations in respect of successful bids will be made no later than Friday 28th August.