LHC Beam Instrumentation Detectors and Acquisition Systems

Slides:



Advertisements
Similar presentations
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Advertisements

Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
WP 13 : Beam Diagnostics Conceptual Specifications Rhodri Jones (BE/BI)
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Beam Instrumentation for Orbit Stability I. Pinayev.
19 Nov 01 – V Chohan LHC Beam Instrumentation Review1 Beam Intensity Measurements  Requirements  What we Intend to do  DC-BCT Type, Limits, Improvements.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Introduction to Beam Instrumentation
Beam phase and intensity measurement Grzegorz Kasprowicz Richard Jacobsson.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
Introduction to Beam Instrumentation
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
1 ELE5 COMMUNICATIONS SYSTEMS REVISION NOTES. 2 Generalised System.
14/6/2000 End Cap Muon Trigger Review at CERN 1 TGC LVL1 Trigger System Link C.Fukunaga/Tokyo Metropolitan University TGC electronics group System link.
Peter Spiller, DIRAC Kick-off meeting Peter Spiller Design Study Group DIRAC kick-off meeting SIS100.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
Collimator BPM electronics – Results from the lab, SPS and LHC
Real time performance estimates of the LHC BPM and BLM system SL/BI.
LHC Beam Loss Monitors, B.Dehning 1/15 LHC Beam loss Monitors Loss monitor specifications Radiation tolerant Electronics Ionisation chamber development.
Adams Accelerator Institute 10 - E. Wilson - 1/24/ Slide 1 Lecture 14 ACCELERATOR PHYSICS MT 2004 E. J. N. Wilson.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
BPM stripline acquisition in CLEX Sébastien Vilalte.
STORM Beam Instrumentation First ideas Lars Søby on behalf of the CERN Beam Instrumentation Group.
VME64x Digital Acquisition Board (TRIUMF-DAB) Designed to handle 2 channels of 12-bit 40MHz Data Will be used for both the LTI & LHC beam position system.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
BEAM INSTRUMENTATION AND DIAGNOSTICS FOR HIGH LUMINOSITY LHC Rhodri Jones CERN Beam Instrumentation Group.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Beam Instrumentation Overview Status for initial commissioning & recent results with BBQ & PLL LHC Machine Advisory Committee 7 th December 2006 Rhodri.
The LHC Beam Position System Ad-hoc Working Group on LHC Experiment-Machine Parameter and Signal Exchange 26 th March 2002 Rhodri Jones (SL/BI)
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
RF acceleration and transverse damper systems
2007 IEEE Nuclear Science Symposium (NSS)
Instrumentation for Accelerators Technologies for the HL-LHC
Pre-commissioning of Critical Beam Instrumentation Systems
Beam based measurements
DCH FEE 28 chs DCH prototype FEE &
CLIC Damping ring beam transfer systems
P. Forck, P. Kowina, M. Schwickert, R. Singh
Status of the MOPOS BI TB – 26th June 2014.
Coupling Correction at the Australian Synchrotron
LHC BLM system: system overview
VELO readout On detector electronics Off detector electronics to DAQ
Introduction to particle accelerators
Combiner functionalities
Proton Beam Diagnostics
BESIII EMC electronics
C.Octavio Domínguez, Humberto Maury Cuna
Limits on damping times
Status of muon monitor R&D and construction
LHC (SSC) Byung Yunn CASA.
Beam Current Monitoring with ICT and BPM Electronics
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Electron Rings Eduard Pozdeyev.
CLIC damping rings working plan towards the CDR
Chamonix Workshop XIV CERN - 17th-21st January 2005
Report on Beam Loss Monitors
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
Linac Diagnostics Commissioning Experience
The LHCb Front-end Electronics System Status and Future Development
Sawtooth effect in CEPC PDR/APDR
Breakout Session SC3 – Undulator
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Presentation transcript:

LHC Beam Instrumentation Detectors and Acquisition Systems LECC 2002 Colmar - 9th-13th September 2002 Rhodri Jones (CERN)

Outline Introduction LHC Beam Instrumentation Selection What do we mean by “Beam Instrumentation” What instruments are involved LHC Beam Instrumentation Selection Beam Position Measurement Beam Loss Measurement Beam Intensity Measurement Luminosity Measurement LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Introduction What do we mean by beam instrumentation? The “eyes” of the machine operators i.e the instruments that observe beam behaviour What beam parameters do we measure? Beam Position Horizontal and vertical all around the ring Corrected using orbit corrector magnets (dipoles) Beam Loss all around the ring Especially important for superconducting machines Beam Intensity (& lifetime measurement for a collider) Circulating current and bunch-by-bunch charge Beam size Transverse and longitudinal distribution Collision rate / Luminosity (for colliders) LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

More “Exotic” Measurements Machine Tune QF QD SF SD Characteristic Frequency of the Magnet Lattice Controlled by Quadrupole magnets Machine Chromaticity Optics Analogy: Spread in the Machine Tune due to Particle Energy Spread Controlled by Sextupole magnets Achromatic incident light Lens Focal length is energy dependent LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The Typical Instruments Beam Position electrostatic or electromagnetic pick-ups Beam Loss ionisation chambers or pin diodes Beam Intensity beam current transformers Beam Size (transverse) synchrotron light wire scanners secondary emission or optical transition radiation screens Beam Size (longitudinal) RF pick-ups or synchrotron light Luminosity ionisation chambers or semiconductors Machine Tune and Chromacitity resonant beam position monitors combined with a PLL system ordinary beam position monitors with data processing LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

LHC BPM System - General Layout ~ 24 Special BPMs for Transverse Damper, Tune & Chromaticity Measurements 24 Directional Couplers & 44 Enlarged Button BPMs for the Interaction Regions 44 Warm BPMs - 24mm Button Electrodes 100 Warm, Button Electrode BPMs Buttons Recuperated from LEP 922 Button Electrode BPMs (24mm) for the Main Arcs & Dispersion Suppressors Total of 1158 BPMs for the LHC and its Transfer Lines LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The Arc BPM - SSS Layout LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

LHC Arc Type BPM (String 2) LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Arc BPM - Button Feedthrough Beam Screen 49mm aperture Liquid Helium Cooling Capillary 24mm button LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Interaction Region BPMs Liquid Helium Capillaries Stripline Electrode Q2 Coupler Directional stripline couplers Outputs signals only from the upstream port Can distinguish between counter-rotating beams LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The Front-End Electronics LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The Wide Band Time Normaliser Beam A + (B + 1.5ns) A B B + 1.5ns 1.5ns LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The Wide Band Time Normaliser A + (B + 1.5ns) A B Dt depends on position A + 1.5ns A 1.5ns B + (A + 1.5ns) B LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The Wide Band Time Normaliser A+(B+1.5ns) B+(A+1.5ns)+10ns Interval = 10  1.5ns System output LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The Wide Band Time Normaliser LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

LHC Beam Position System Layout Acquisition Chassis  4 Acquisition Chassis  4 TTC Timing Ethernet Real-Time Network Acquisition Chassis  4 Acquisition Chassis  4 Surface Point (1 of 8) 1/16th of LHC Tunnel SSS containing 2 BPMs F.E. Electronics SSS containing 2 BPMs F.E. Electronics SSS containing 2 BPMs F.E. Electronics Up to 28 Quadrupoles 31 Drop-offs max. 31.25kbit WorldFIP fieldbus for slow control Fibre-optic Link using “blown” fibres 7 Drop-offs max. LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

WBTN - Linearity v Intensity For LHC Arc BPMs 1% ~ 130mm LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

WBTN - Linearity v Position For LHC Arc BPMs 1% ~ 130mm LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

WBTN - Radiation Issues The Front-end Electronics for the Arc BPMs will be located under the main quadrupoles can expect to see a dose of some 12Gy/year Tests in the SPS-TCC2 area during 2000 showed that use of DIGITAL components in the tunnel should be avoided Most memories and FPGA’s too easily corrupted Qualification of components long & difficult LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

WBTN - Radiation Issues In 2001 : Fibre-Optic Link added to LHC BPM system only the minimum of analogue electronics kept in tunnel all sensitive digital electronics located on the surface allows easy access to most of the acquisition system Cost of large scale fibre-optic installation compensated by elimination of 13km of expensive low loss coaxial cable reduction in number of acquisition crates no bunch synchronous timing required in the tunnel LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

WBTN - Radiation Test Results 2001 Test results of the very front-end WBTN card with Fibre-Optic Link Initial performance After 650Gy no significant deterioration in the performance is visible 6.5ps rms jitter 6ps rms jitter LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The LHC BPM Acquisition System Very Front-End WBTN Card 70MHz Low Pass Filters Supplied by TRIUMF (Canada) Single-Mode Fibre-Optic Link 1310nm Diode Laser Transmitter Tunnel Surface VME based Digital Acquisition Board TRIUMF (Canada) (2 x 12bit 40MHz Acq) WBTN Mezzanine Card (10bit digitisation at 40MHz) LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Operational Prototype Results in 2001 System extensively used in SPS for electron cloud & instability studies. LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The Typical Instruments Beam Position electrostatic or electromagnetic pick-ups Beam Loss ionisation chambers or pin diodes Beam Intensity beam current transformers Beam Size (transverse) synchrotron light wire scanners secondary emission or optical transition radiation screens Beam Size (longitudinal) RF pick-ups or synchrotron light Luminosity ionisation chambers or semiconductors Machine Tune and Chromacitity resonant beam position monitors combined with a PLL system ordinary beam position monitors with data processing LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The LHC Beam Loss System Role of the BLM system: Protect the LHC from damage Dump the beam to avoid magnet quenches Diagnostic tool to improve the performance of the LHC Acquisition requirements: Calculation of quench level equivalent chamber signal Electric currents from 600 pA to 300 A A dump should be requested at 50% of the quench level i.e. from 300 pA to 150 A Extend dynamic range for sufficient sensitivity at low losses Measuring current from 60 pA to 300 A Arc BLM acquisition rate not faster than one turn (89 s) Fastest total loss is ~ 6 turns & will be detected by special BLMs. LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Structure of the BLM Readout Chain transforms particle losses into an electric current 6 per quadrupole (3 for each LHC ring)  ~3000 monitors Analogue Front-End measures current and transmits data from Tunnel  Surface Dump Controller processes data and interfaces to the beam interlock system Ionisation Chamber LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Quench Level Equivalent Chamber Current 600 pA One turn 60 pA LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Charge-Balanced Converter iin(t) + Iref iin(t) LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Current-Frequency Characteristics LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Front-End Frequency Evaluation 8-bit asynchronous counting of the reset pulses each pulse represents a constant charge every ~40 s the count from each of the 6 channels are multiplexed serial data stream is Manchester encoded FAW Ch 1 Ch 2 ... Ch 6 Tunnel to surface transmission Two choices Cable transmission (tested for 2Mbit up to 1.8km) Differential signal transmission provides noise immunity High speed driver / receiver pair Fibre-optic transmission Final decision will depend on cable distance and transmission rate LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The Typical Instruments Beam Position electrostatic or electromagnetic pick-ups Beam Loss ionisation chambers or pin diodes Beam Intensity beam current transformers Beam Size (transverse) synchrotron light wire scanners secondary emission or optical transition radiation screens Beam Size (longitudinal) RF pick-ups or synchrotron light Luminosity ionisation chambers or semiconductors Machine Tune and Chromacitity resonant beam position monitors combined with a PLL system ordinary beam position monitors with data processing LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Fast Beam Current Transformer Installed in the SPS and LHC transfer lines LHC fast BCT will be a scaled version Capable of 40MHz bunch by bunch measurement Dynamic range to cover 5109 to 1.7  1011 cpb LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Fast Beam Current Transformer Image Current 1:40 Passive Transformer Ceramic Gap 80nm Ti Coating 20W to damp any cavity resonances BEAM Calibration winding 500MHz Bandwidth Low droop (< 0.2%/ms) LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Acquisition Electronics Designed by the Laboratoire de Physique Corpusculaire, Clermont-Ferrand for use in the LHCb Preshower Detector. [see Session B53] Uses interleaved, 20MHz integrators and sample & hold circuitry to give 40MHz data. Digital Acquisition PMC size Mezzanine card developed by CERN & contains Fast integrator chip 12bit, 40MHz ADC Timing provided by the TTCbi module, part of the Timing, Trigger & Control system developed for the LHC experiments [see Session P54 – Bruce Taylor] Mezzanine sits on the same VME 40MHz Data Acquisition Board developed for the LHC Beam Position System (TRIUMF, Canada) Analogue Acquisition based on a fast integrator chip LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Acquisition Electronics To VME Digital Acquisition Board Fast Integrator Chip Track & Hold MUX Differential Input from Fast BCT 12-bit ADC 40MHz TTC Input from TTCbi 20MHz Clock Creation LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Acquisition Electronics Integrator Output 25ns FBCT Signal after 200m of Cable Data taken on LHC type beams at the CERN-SPS (2002) LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Results from the CERN-SPS (2002) Bad RF Capture of a single SPS LHC Batch (72 bunches) LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

The Typical Instruments Beam Position electrostatic or electromagnetic pick-ups Beam Loss ionisation chambers or pin diodes Beam Intensity beam current transformers Beam Size (transverse) synchrotron light wire scanners secondary emission or optical transition radiation screens Beam Size (longitudinal) RF pick-ups or synchrotron light Luminosity ionisation chambers or semiconductors Machine Tune and Chromacitity resonant beam position monitors combined with a PLL system ordinary beam position monitors with data processing LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

LHC Luminosity Measurement Requirements: Capable of 40MHz acquisition Has to withstand high radiation dose: ~108 Gy/year estimated 1018 Neutrons/cm2 over its lifetime (20yrs LHC operation) estimated 1016 Protons/cm2 over its lifetime (20yrs LHC operation) No maintenance Candidates: Ionisation Chambers developed by LBL Good radiation hardness Difficult to get working at 40MHz CdTe detectors developed by CERN in collaboration with LETI (Grenoble) Fulfills 40MHz requirement Not yet proven for the highest levels of radiation LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Polycrystalline CdTe Detectors Experience at CERN with CdTe X-RAY detector running in LEP for beam emittance measurement was used up to the end with total dose 1014 Gray Advantages large number of e- created per MIP (~5  Diamond) very fast response time simple construction LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

CdTe Detectors – Test Set-up Sr90 Source Amplifier Output Averaged Output Histogram ~10ns LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Polycrystalline CdTe Detectors LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Irradiation Test Results CERN-SPS (2001) Irradiation test up to 1015 neutrons/cm2 LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Irradiation Test Results Triga type reactor (Ljubljana,Slovenia - 2002) Irradiation steps 1013 neutrons/cm2 1015 neutrons/cm2 1016 neutrons/cm2 activation of all set-up next step 1018 neutrons/cm2 (2003) LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation

Summary LHC is a superconducting machine tight tolerances on all beam parameters instruments have to measure to better than tolerances Increasing demands for all instruments 40MHz bunch-by-bunch resolution large dynamic range Provides a challenging field of development all the main instruments have been defined Installation of some systems begin next year (transfer lines) Final choices for most instruments foreseen by 2004 LECC2002 - Rhodri Jones (CERN - SL/BI) LHC Beam Instrumentation