Reporting Guidance Consistency Check

Slides:



Advertisements
Similar presentations
Automated Test Design ™ © 2011 Conformiq, Inc. CONFORMIQ DESIGNER On ES v1.2.1 Stephan Schulz MBT Working Meeting/MTS#56, Göttingen.
Advertisements

XCON Framework Overview & Issues Editors: Mary Barnes Chris Boulton
SYSTEM ANALYSIS & DESIGN (DCT 2013)
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt October, 2009.
Let’s try Oracle. Accessing Oracle The Oracle system, like the SQL Server system, is client / server. For SQL Server, –the client is the Query Analyser.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Class Project OO Design Document Here is what you need to do for your class project.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt October, 2009.
Design Report – Fall Semester. Title Page List name of project and team number List date List team members, advisor, sponsor Team logos.
23. October 2014 WG DIS, Brx WFD 2016 Tools Andres Stæhr Bastholm.
AutoDESA Presentation Project Documentation October 2005.
Monitoring Fact Sheets DIKE TSG1 04. July 2013, Copenhagen Proposal for the use of web-based monitoring “fact sheets” for the purpose of MSFD reporting.
1 © 2003, Cisco Systems, Inc. All rights reserved. DMTF and Cisco Profile overview/comparison August 17, 2005.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Project Report Format for Final Year Engineering Students.
(Winter 2017) Instructor: Craig Duckett
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
EEA 2017 State of European waters
Annex 0 – the “read-me-first” document
Replace This Text With Your Title
New Work Programme and mandates 2005/2006
Agenda item 8b WISE SoE reporting 2015 state of the play
Towards shared water assessments
The report of the State party
Structure–Feedback on Structure ED-2 and Task Force Proposals
Marine Strategy Framework Directive (MSFD)
Best practices for the self-assessment
01 This is a sample text. You can replace this text. Enter your text here This is a sample text. You can replace this text. Enter your text here
56% Enter your text here This is a sample text. Enter your text here
CIS General progress report WD meeting 16 June 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European Commission.
Taking forward the common understanding of Art. 8, 9 and 10 MSFD
Meeting of Working Group Data & Information Sharing (DIS)
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
CIS work programme Ad-hoc activity on Economics
EU Water Framework Directive
WGF Sub-group on Reporting Progress report
January 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Recommended Practice Draft Document Status.
2. Presentation of the reporting tools
Writing reports Wrea Mohammed
WFD Article 8 Schemas Yvonne Gordon-Walker.
Horizontal Guidance on Wetlands Rome, 12nd June
Action Points 16th meeting of the Working Group on
Progress report Working Group D - Reporting SCG meeting May 2008 Unit D.2 Water and the Marine - WFD Team.
Summary and Action Points
Summary and action points 1-2 March 2017 Brussels
Article 13 RBMP reporting testing 2009
Revision of the technical annexes of the BPR
Main changes in 2018 revision of ISO/IEC Directives, Part 2
Trine Christiansen Constanca Belchior
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
WISE - State of the art --- WISE - in the context of SEIS
WG GES: Decision review progress
Progress CIS Activity on CC&Water 20 May 2009 Marieke van Nood, Unit D
Working together Marc Thauront Brussels 28 January 2009.
Directive 2007/60/EC Draft concept paper on reporting and compliance checking for the Floods Directive.
State of Environment and Trends
EU Water Framework Directive
3rd meeting, 8 March 2006 EEA Copenhagen
Streamlining of monitoring and reporting under WFD, Nitrates Directive and EEA's SoE –concept paper DG Environment.
Working group on data & information sharing DIS under CIS of WFD
Legal issues and compliance checking in WFD implementation SCG meeting 5-6 November 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European.
1. Define 4. Implement 2. Measure 3. Analyse 5. Control YOUR LOGO
Guidance Document - Generic Outline
ACTION LOG GUIDANCE NOTES
Marine Strategy Framework Directive reporting: progress and next steps
Concept paper on the assessment of WFD River Basin Management Plans
EU Water Framework Directive
Final Version (after MS revision)
Marine Environment and Water Industry
Presentation transcript:

Reporting Guidance Consistency Check Insert client logo here Reporting Guidance Consistency Check

Completed Language and English check of main body of the text and all schema element descriptions and guidance text, with additional clarifications included where appropriate. Consistency check between schemas, elements and the main body of the text. Schema element names revised into 'camel' format (e.g. “WaterBodyChanges”).

Completed Schema and element-based quality checks included for all schemas and elements (except those relating to Input Pollutants in the RBMP_PoM schema). Some schema elements added following the outcome of the INSPIRE consistency check (as available at 10 October 2014).

In Progress… All schema sketches to be replaced with generated diagrams once the schemas themselves have been developed. This will ensure full consistency between the schema descriptions in the Guidance and the implemented schemas. All products tables require cross-checking against the 2012 WFD Implementation Report and WISE Aggregation Reports to ensure completeness. The tables themselves require some reformatting, numbering). List of acronyms to be included as an Annex.

In progress… All schema element data types and relationships to be cross-checked with the schemas as they are developed (in terms of string lengths, numeric ranges, relationships etc.). All section/chapter references require cross-checking (highlighted yellow). Hyperlinks/footnotes to Directives and other technical/Guidance documents to be added (indicated with comments). Annex 6 needs to be added once it is clear how the Reportnet interface will work.

In progress… Section on EEA in Chapter 1 requires revision. Some GIS issues to be checked (indicated with comments). Sections on Input Pollutants and KTMs in RBMP_PoM schema need further review and QA. All Annexes require consistency checking and review. Once the technical aspects are completed, the whole document will be reformatted in line with CIS standards.