LCLS Commissioning Parameters

Slides:



Advertisements
Similar presentations
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Advertisements

Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
Paul Emma Injector/BC1 Commissioning April 20, Injector/BC1 Commissioning (Dec. 1, ’06 through Aug. 1, ‘07) P. Emma LCLS.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
Simulation studies of the e-beams for Renkai Li and Juhao Wu 5/20/2014 ALD Review.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
Low Emittance RF Gun Developments for PAL-XFEL
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
Compton based Polarized Positrons Source for ILC V. Yakimenko Brookhaven National Laboratory September 12, 2006 RuPAC 2006, Novosibirsk.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Valery Telnov Budker INP, Novosibirsk IWLC2010, CERN October 21, 2010 A FEL pumped solid state laser system for the photon collider at CLIC.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Agenda General Information Project Status Transport Tubes Design.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
X-band Based FEL proposal
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
MAX IV linac overview and scope of automation Sara Thorin.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
LCLS_II High Rep Rate Operation and Femtosecond Timing
Phil Oxford , june 18 Photoinjector at.
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Status of the MAX IV Short Pulse Facility
Sara Thorin, MAX IV Laboratory
Status and Interest of the X-ray FEL SINAP
Polarized Electron Source for eRHIC (the ring-ring option)
Drive laser specifications:
Cesium Telluride Photocathode Preparation at Argonne
Gu Qiang For the project team
XFEL Beam Physics 10/30/2015 Tor Raubenheimer.
SRF Pb/Nb photoinjector; recent results
Injector Performance Requirements Conventional Facilities Update
Injection facility for Novosibirsk Super Charm Tau Factory
BC2 Commissioning Parameters
SuperB project. Injection scheme design status
MIT Compact X-ray Source
ERL Main-Linac Cryomodule
LCLS Gun Commissioning Status & Plans David H
What did we learn from TTF1 FEL?
LCLS Commissioning Parameters
Electron Source Configuration
LCLS Injector Commissioning Dates ( )
Injector: What is needed to improve the beam quality?
LCLS Commissioning Parameters
Advanced Research Electron Accelerator Laboratory
Injector Commissioning C
LCLS Commissioning P. Emma, et al
VELA – CLARA AP (Draft) Goals Software Goals
Modified Beam Parameter Range
Drive laser specifications:
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Simulations for the LCLS Photo-Injector C
Thermal Emittance Measurement at PITZ
LCLS Injector Commissioning P
LCLS Commissioning Parameters
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
J. Seeman Perugia Super-B Meeting June 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Minimized emittance for high charge with multi cell superconducting guns and solenoidal focusing D. Lipka, BESSY.
Experience with photoinjector at ATF
Presentation transcript:

LCLS Commissioning Parameters Value Comments RF rate 30 Hz 30 Hz in linac - 120 Hz in gun hot test Beam rate ≤30 Hz 10 Hz e- beam as baseline – possible short term 30-Hz tests (difficult beyond 30 Hz due to laser rate) Drive-laser rate 120-Hz during laser commissioning – 30 Hz during e- commissioning - shutters provide lower e- rate Bunch charge 200-500 pC depends on QE and diagnostics – some short spans at 10 pC – later in ’07 explore 1-nC Drive-laser pulse length 6 ps fwhm 6-ps fwhm startup at low charge with possibility of 10-ps at 1 nC Gun gradient 120 MV/m Baseline level, although 100-110 MV/m is adequate in ‘07 Nov. 4, 2006