UVIS TEAM MEETING OPERATIONS UPDATE

Slides:



Advertisements
Similar presentations
Chandra X-Ray Observatory CXC ACIS Ops team February 28, Controlling the ACIS FP Temperature: Turning off the DH Heater During ALL Perigee Passages.
Advertisements

CIRS Ring Observations: Submm, Temp and Stellar Occultations Linda Spilker, Scott Edgington, Rich Achterberg, Stuart Pilorz, Shawn Brooks April 26, 2004.
Section 2.4 solving equations with variables on both sides of the equal sign. Day 1.
2-4 Solving Equations with Variables on Both Sides.
Rings Node Migration Plan Mark & Mitch PDSMC, UCLA November 28-29, 2012.
Julie Haggerty National Center for Atmospheric Research Friends and Partners of Aviation Weather October July 2014.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
FTS Test Definition Summary Kaley Walker Test Readiness Review January 29, 2003.
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
Implementation and Processing outline Processing Framework of VIIRS instrument monitoring System Processing Framework of VIIRS EV data Monitoring SD/SDSM.
Station Board Testing EVLA Correlator S/W F2F 3-4 April 2006 D. Fort.
HBD Transmission Monitor Update VII: Systematics & HBD CF4 B.Azmoun, S.Stoll Brookhaven National Lab HBD Working Group Meeting: Jan. 9, 2007.
06/28/10UVIS TEAM MEETING OPERATIONS UPDATE UVIS TEAM MEETING OPERATIONS UPDATE 1.
UVIS TEAM MEETING 7/ Instrument Status On/Off Cycle: 26 Hours On: ~43000 hours –~4500 hours since last shut down (probe relay) HDAC Filament Modulation:
01/05/10UVIS TEAM MEETING OPERATIONS UPDATE UVIS TEAM MEETING OPERATIONS UPDATE.
PLASTIC Post Launch Data Flow Lynn Kistler & Lorna Ellis May 2006.
UVIS Team Meeting Berlin 2009 Saturn and Titan Planning Bob West Working with Don Shemansky.
1/6/09UVIS TEAM MEETING OPERATIONS UPDATE UVIS TEAM MEETING OPERATIONS UPDATE.
E15 Data Processing Issue 6/18/121UVIS Team Meeting.
JPL Technical Activities
Effectiveness of Contingency Flights
GOVERNMENT STATUS UPDATE
What Causes Day and Night?
Lutetia geometry and timeline
Italian g-2 software discussion
Project Controls: As-Built S-Curves
The Sun-Earth-Moon System
Sarah M. Milkovich UVIS Team Meeting, Pasadena 8 January 2009
The Sun-Earth-Moon System
Proposal for LAT Year 1 Data Release Plan
RTWT and Science Planning Report
Sarah M. Milkovich UVIS Team Meeting, DLR, Berlin 10 June 2009
The Moon.
UVIS Performance Status
DOW RESTRICTED - For internal use only
Pong: Diagnosing Spatio-Temporal Internet Congestion Properties
CASSINI-UVIS TEAM WEBSITE
: القسم 21 إجراء المقابلة التحفيزية.
الجزء 22:المقابلة التحفيزية
XXM Status, Priorities, Plans, and Activities Icy Satellite Science
CASSINI-UVIS TEAM WEBSITE
XM Status, Priorities and Plans, XXM Activities Icy Satellite Science
UVIS Calibration Update
LBA05 ops meeting Tasso Tzioumis
UVIS TEAM MEETING OPERATIONS UPDATE
Shawn M. Brooks – UVIS Investigation Scientist
UVIS TEAM MEETING OPERATIONS UPDATE
UVIS Ops Team UVIS TEAM MEETING 6/23/08.
XM Status, Priorities and Plans, XXM Activities Icy Satellite Science
UVIS TEAM MEETING OPERATIONS UPDATE
Shawn M. Brooks – UVIS Investigation Scientist
UVIS Calibration Update
CASSINI-UVIS TEAM WEBSITE
UVIS Occultation Geometry Summary
Lesson #6 Moon Phases.
Cube Generator Todd Bradley January 8, 2014.
Upcoming Events Cassini Equinox Mission
Status of Instrumental Beam Studies and Technical Description of Detectors and DAQ February 24, 2017.
HDAC Report R. Reulke and H. U. Keller UVIS Team – Meeting Boulder, 23
STATUS OF TREMOVE DEVELOPMENT
What Causes Day and Night?
Dione’s O2 Exosphere C. J. Hansen January 2013.
UVIS PRIME Requests T55-T61
What Causes Day and Night?
Instrument Status On/Off Cycle: 26 Hours On: ~47000 hours
UVIS TEAM MEETING OPERATIONS UPDATE 6/8/09 UVIS TEAM MEETING
Superintendent – Design Engineering
The Sun-Earth-Moon System
UVIS TEAM MEETING OPERATIONS UPDATE
Presentation transcript:

UVIS TEAM MEETING OPERATIONS UPDATE 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

UVIS TEAM MEETING OPERATIONS UPDATE Instrument Status On/Off Cycle: 29. Off in S75 for 10 days (10/19/12 -10/29/12) for PG Test Hours On: ~108,000 hours. Longest continuous operations: 9/11/2007 – 11/1/2010. HDAC Filament Modulation: Filament 1: 227 hours (H cell), 143 (D cell). Filament 2: 12 hours both H cell and D cell Last: In S76 during T88 (H cell and D cell). Next: In S78 during T90 (H cell). 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

Significant Data Issues UVIS_168RI_SPOKEMOV001_ISS UVIS_168RI_FMOVIE001_ISS “DSS 14 going to brake”. Up to 40% data lost UVIS_168SA_AURSLEW006_PRIME Rain at DSS 43. About 90% lost on a 36 hours observation UVIS_168SA_AURSLEW003_PRIME DSN problem. About 40% data lost. All in the scan portion of the observation UVIS_170SW_IPHSURVEY012_RIDER – 100% data lost UVIS_170SA_EUVFUV002_PRIME - 100 % data lost UVIS_170SA_COMPSIT003_CIRS - partial lost DSS 14 problem S75 UVIS_172TI_FIRLMBT001_CIRS    - 60% data lost UVIS_172TI_FIRLMBAER002_CIRS  - 100% data lost UVIS_172TI_FIRLMBINT002_CIRS  - 100% data lost UVIS_172TI_EUVFUV002_PRIME    - 90% data lost UVIS_172TI_FIRNADCMP002_CIRS  - 10% data lost DSS 43 & 63 (rain and “glitches”). T86 UVIS_173ST_URALPVIR001_PIE DSS 45 issue. 10% data lost. All over the place. S76 UVIS_176SA_AURSLEW003_PRIME DSN problem. About 60% data lost 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

UVIS TEAM MEETING OPERATIONS UPDATE Other Data Issue UVIS_169DI_ICYEXO001_PIE Reported by Miodrag Unusual HSP high count (> 2300 per 2 mllsec vs 200 expected) Consistent with housekeeping HSP TMrate monitor (700 vs 250 expected) 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

UVIS TEAM MEETING OPERATIONS UPDATE First Time Events No First Time Event 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

UVIS TEAM MEETING OPERATIONS UPDATE Rbot: Workload Impact The impact of Rbot on the ops team workload has been light: S76: 0 out of 16 designs S77: 2 out of 11 designs UVIS_184SA_AURSLEW001_PRIME 68 deg rotation for the last scan UVIS_184SA_AURSLEW002_PRIME 30 deg rotation S78: 1 out of 29 designs UVIS_189MI_ICYLON001_PRIME 38 deg rotation 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

UVIS TEAM MEETING OPERATIONS UPDATE Major Local Issues Uplink side: None Downlink side: E15 data processing issue See next presentation 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

XM Data Utilization Summary S72 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

XM Data Utilization Summary S73 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

XM Data Utilization Summary S74 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

XM Data Utilization Summary S75 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

UVIS TEAM MEETING OPERATIONS UPDATE OPS Team Status Darren is a dad Primary responsibility is QuikScat Crystal is a mom Back at work beginning February at 50% (some on Kepler) Alain will go part time (75%) probably in April Back on the QuikScat rotation A lot of work on the OASIS software 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

UVIS TEAM MEETING OPERATIONS UPDATE Liam James 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE

UVIS TEAM MEETING OPERATIONS UPDATE Notes and Reminders The list of ring occultations that contain an atmospheric occultation is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/Atmospheric_Occ.pdf The list of all the tour calibrations is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/UVIS_Tour_Calibration.pdf The UVIS PEFs are on the team web site at http://lasp.colorado.edu/cassini/team-site/operations_planning/planning_info/ 01/07/13 UVIS TEAM MEETING OPERATIONS UPDATE