Senior Design Project Office Building

Slides:



Advertisements
Similar presentations
Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial.
Advertisements

Prof Awad S. Hanna Concrete Structures Concrete Structures.
Skyscraper Construction
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Foundation System Design for Al Nimmer Commercial Building
Robert Adkins Et 494 Instructor: Dr. Cris Koutsougeras Advisor: Mr. Rode 12/04/2013.
CEA F INAL E XAM R EVIEW These are the topics that will be on the final.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Agricultural Faculty Bd. of AGU - Concept Drawings Handong graduate school.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
What you need today Text Notebook Calculator (optional) 1/8” = 1’ print of foundation (basement) plan –With dimensions.
Steel Building Apartment- Design and Build
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Senior Project 24’x24’ structure By: Andrew LeBlanc ET-494 Fall 2013-Spring 2014 Advising by: Rudolph Rode and Byron Patterson.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Wind Turbine Support Structure
Jacob Ruiz W# ET Senior Design Instructor: C. Koutsougeras Advisors: R. Rode May 9, 2014 Jacob Ruiz W# ET Senior Design Instructor:
Mr. Brad Dearing 108 University High School Normal, IL (309) Architectural Design.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Senior Design Project Office Building By: Heath Yeager ET – 493 Spring 2014 Advisor: Mr. Rudolph Rode.
Wind Turbine Support Structure Benjamin Boyett ET 493 Senior Design I Advisor – Dr Mohamed Zeidan Instructor - Dr. Cris Koutsougeras 05/09/2014.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Chapters Project title : Hirbawi Center A building lies in the east side of Tulkarm, this building consists of five stories of ( m 2 ) A building lies.
Senior Design Project Et 493 Design of a Two-story Office/Apt For: Dr. Cris Koutsougeras Advisor: Mr. R.E. Rode Prepared by Joshua Price.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Dr. Cris Koutsougeras Advisor: Edward Rode.
Northwest Quadrant Draft Zoning Ordinance NWQ Draft Zoning Ordinance Planning Commission Review February 21, 2006 Phil Carlson, AICP DSU Planning Consultant.
 Building Statistics  State-of-the-Art Lab  Chief Medical Examiner  121,000 square feet  5 stories  $45 million project.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Don Kettering. 1 story commercial building, single tenant space Located in Falls Church new Core Commercial Area where city plans to increase walkability.
 Presented by: Stephen DeMatteo  Engineering Technology, Construction  ET- 494 Fall 2014  Advisors: Ed Rode Cris Koutsougeras.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Primary Considerations Site Considerations The community “Planned community” or no thought? Price range? Socio-economic category? Alive or dying community?
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Steel Fabrication & Erection of Belle Chase Primary School Proposal – Fall 2015 ET 494 – Senior Design II Derek Duhon Instructor: Dr. Koutsougeras Advisor:
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design II.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
ET 494 – Senior Design II Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Senior Design Project Office Building By: Heath Yeager ET – 493 Spring 2014 Advisor: Mr. Rudolph Rode.
Pearl Condominiums Philadelphia, PA
An-Najah National University Faculty of Engineering
Design of a Commercial Shopping Center
Commercial Office Building
Multistory Office Building
Designing a Commercial Shopping Center
Commercial Office Building
Design of a Commercial Shopping Center
Multistory Office Building
ET 494: Senior Design Design of a New Hammond Head Start Center
Commercial Office Building
Instructor: C. Koutsougeras
2429 Iowa (Suite B-D) Your Business 13,000 SF available Office Space
Concrete Structures DR. Nabil Dmaidi.
FOR LEASE OR SALE SEAWAY ROAD OFFICE
Planning Commission Meeting: August 3, 2016
By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras
Commercial Office Building
NEW MEDICAL FACILITY BUILDING
DISTRICT DEPARTMENT OF TRANSPORTATION PERMIT ISSUANCE REPORT
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
New Medical Facility Building
Multi-Family Fourplex Apartment
Bob's Burgers, Hammond Louisiana
Civil Engineering and Architecture
Residential property for sale. Residential property for sale consists of any property which can be used for commercial purposes which generate income.
Senior Design Project Prepared for: Dr. Koutsegeras Advisor: E. Rode
Presentation transcript:

Senior Design Project Office Building By: Heath Yeager ET – 494 Fall 2014 Instructor: Chris Koutsougeras Advisors: Mr. E. Rode and M. Zeidan

Objective To design an office building that can be used by multiple companies

Location Riverside Dr. and Nouveau Dr., Metairie, LA 70003 78,179.89 sf. 335’ x 215’

Survey of Land Trees Low spots Apartment complex on left Future doctors office on right Another office building across the street

Zoning General Office 2 (GO-2) Banks and homesteads The purpose of this district is to create an environment especially suited to a group of professional, general administrative, and general sales offices, together with certain commercial uses primarily to service employees in the district. The district regulations are such as to protect adjacent commercial and residential uses. Banks and homesteads Clinic, medical, dental, or chiropractic General and professional offices Laboratories, medical and dental Public utility structures Residential dwelling

Description Size of Building: 155’ x 100’ Basic Office Building 3 Stories tall Open floor plan – renters of space can determine the design Glass façade

Elevations

Floor Plan - 1st floor

Floor Plan - 2nd and 3rd floor

Soil Test Kenner dirt, drained Has multiple layers Black to dark gray in color

Foundation Concrete pilings Pilings create more friction Used in softer ground

Structural Plan

LRFD Calculations 𝑊 𝑈 =1.2∗1+1.6∗1.5=3.6 𝑘 𝑓𝑡 𝑊 𝑈 =1.2∗1+1.6∗1.5=3.6 𝑘 𝑓𝑡 Beam moment = 3.6∗ 29 2 8 =378.45 𝑘𝑓𝑡 using AISC manual table 3-2, W18x50 Girder moment = 3.66∗ 32.5 2 ∗2∗10.83=1288.23 𝑘𝑓𝑡 using table 3-2 W24x131

LRFD Calculations cont’d Reaction of beams = 3.6∗29 2 =52.2 𝑘 Reaction of girders = 2∗52.2+ 3.6∗33 2 =163.8 𝑘 Assume it is going to be a W14x109 based on the column width ≥ 12.9” Column = 𝑃 𝑈 = 2∗52.2+2∗163.8+.109 ∗3=1296.33 𝑘

LRFD Calculations cont’d 𝑃 𝑢 =1296.33 𝑘 Using table 1-1 we can gather r = 3.73, Ag = 32 𝐾𝐿 𝑟 = .8∗11∗12 3.73 =28.31 use table 4-22 to find ∅ 𝐹 𝑐𝑟 =42.3 ∅ 𝑃 𝑛 =42.3∗32=1353.6 𝑘≥ 𝑃 𝑢

Other Plans

Estimation Structure……………………………………………………….$ 1,691,624.16 Walls/Ceiling………………………………………………….$ 38,017.10 Electrical……………………………………………………….$ 60,289.98 Plumbing……………………………………………………….$ 42,293.64 HVAC…………………………………………………………….$ 47,705.57 Miscellaneous…………………………………………………$ 122,945.67 Grand Total: $2,002,876.12

Schedule

Questions????