News from Saclay D. Attié, P. Colas, W. Wang

Slides:



Advertisements
Similar presentations
LCTPC wpmtg G. De Lentdecker January 12 st 2012 o D. Attié, P. Colas, W. Wang Saclay G. De Lentdecker Université Libre de Bruxelles P. Hayman Carleton.
Advertisements

20 January 2011R&D staf meeting - Jan T.1 Activities in 2010 at DESY test beam 4-chip/Ingrid tests in March; 3 days OK Single Ingrid tests in May combined.
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
News from Saclay D. Attié, P. Colas, W. Wang. Preparation for the June data taking with 7 modules : hardware Detectors ordered and ready for production.
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas Analysis Meeting, DESY 11 February 2009 LP test beam Micromegas analysis -
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
ECFA Meeting, Valencia – November 8, First TimePix tests at CERN David Attié ECFA Meeting – Valencia – 8 November 2006.
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
Preliminary Micromegas Data Analysis Results D. Attié, P. Colas, M. Dixit, M. Riallot, Yun-Ha Shin, S. Turnbull, W. Wang 20/05/20101Wenxin Wang - LC-TPC.
GridPix studies at Saclay Avalanche fluctuations D. Attié, A. Chaus, P. Colas, M. Titov GridPix workshop, Feb. 22, 2012.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
Current TPC electronics P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 18, 2014.
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas, M. Riallot LCTPC WP Meeting #79 25 March 2008 News from Micromegas modules.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
26 Jan 2010Paul Dauncey1 DESY beam test preparations Paul Dauncey.
Annual Meeting 2008 – October 6 th 1 David Attié P. Colas, X. Coppolani, E. Delagnes, A. Giganon, I. Giomataris Status of Saclay.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, E. Delagnes, M. Dixit, M. Riallot, Y.-H. Shin, S.
C. Combaret 11/10/ 2008 Status of the DHCAL m2 software C. Combaret IPNL.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Micromegas TPC Results from beam tests 7-module design ILD TPC mechanics and integration D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot,
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin, R. Woods TPC Tests Analysis Meeting, DESY 28 May 2009.
TPC electronics for ILD P. Colas Krakow, IFJ-PAN, ILD Pre-meeting September 24, 2013.
Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans, W. Wang.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
R&D by LCTPC collaboration Last week: DESY PRC review: Status report:
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
Wide-frame view on Saclay LCTPC activities P. Colas.
D. Attié, P. Colas, M. Lupberger, M. Riallot LCTPC WP Phone meeting 109 July 15, 2010 News from “Octopuce”
Micromegas (Ingrid)+TimePix 8-chip modules
TPC DAQ developments Gilles De Lentdecker, Yifan Yang, Erik Verhagen, IIHE-ULB (Brussels)
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
DAQ deadtime memo Kaz, Grass 2012/01/04 1. Current dead time Dead time measured on 2011/09/29  With TDCmax=4, Deadtime =350 us  With TDCmax=8, Deadtime.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
1 The Silicon TPC System The “final” status report EUDET Annual meeting 30 September 2010 Jan Timmermans NIKHEF/DESY.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
AIDA 3rd Annual Meeting1 First test of MCM prototype board 1 G. De Lentdecker 2 L. Jönsson 2 U. Mjornmark 1 Y. Yang 3 F. Zhang 1 Université Libre de Bruxelles.
Micromegas projects and future tests Phone meeting August 26th, 2009.
D. Attié, P. Colas, K. Fujii,T. Matsuda, M. Riallot, A. Sugiyama, W. Wang Thanks to M. Dixit, Yun-Ha Shin, S. Turnbull,Yulan Li Construction and tests.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
AIDA (mini) Trigger/Timing Logic Unit (mini TLU) Introduction Status Plans Summary 21/11/2013David Cussans, AIDA WP9.3, DESY1.
P. Kuijer1 System run coordinator meeting
14.4. Readout systems for innovative calorimeters
Progress with pixelised readout of gaseous detectors
Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN
Large Area Endplate Prototype for the LC TPC
Progress with pixelised readout of gaseous detectors
Test gas-box for Micromegas panels and changes in mechanics
SEABAS/EUTelescope Integration Idea
Power pulsing of AFTER in magnetic field
Test of a new anode resistive coating for a Micromegas TPC
‘Octopuce’ beam test D. Attié, X. Coppolani, P. Colas, M. Lupberger, M. Riallot, J. Timmermans, W. Wang Thanks to K. Dehmelt & U. Renz I’m here to present.
Recent test results from a fully integrated Micromegas TPC prototype
TPC electronics for ILD
Phone: + 40 (728) | +40 (733)
TPC Large Prototype Toward 7 Micromegas modules
Micromegas TPC D. Attié, M. Carty, P. Colas, G. De Lentdecker, M. Dixit, M. Riallot, YunHa Shin, S. Turnbull, W. Wang, and all the LC-TPC collaboration.
in a high intensity beam
7-Module beam test D. Attié, P. Colas, W. Wang,
TPC chamber for Medipix2/TimePix
Copyright © 2016 Society of St. Vincent de Paul
News from Micromegas modules
The cosmic trigger for the Large Prototype
News from Micromegas modules
Run chart showing the number of specimens submitted during the study period. Run chart showing the number of specimens submitted during the study period.
Word of the Day List nd 9 Weeks.
Presentation transcript:

News from Saclay D. Attié, P. Colas, W. Wang I’m here to present a TPC review LCTPC WP Phone meeting 114 September 23, 2010

Octopuce in Helium/Isobutane He/i-C4H10 (80:20) VIngrids = 375V (up to 400 V) Time Acquisition time: 0.5 ms No trigger Stable conditions Running during days September 23, 2010 LCTPC WP phone meeting #114

Octopuce in Helium/Isobutane He/i-C4H10 (80:20) VIngrids = 375V (up to 400 V) TOT (Energy) Acquisition time: 1 s No trigger Stable conditions Running during days September 23, 2010 LCTPC WP phone meeting #114

Octopuce in Helium/Isobutane He/i-C4H10 (80:20) VIngrids = 375V (up to 400 V) TOT (Energy) Acquisition time: 1 s No trigger Stable conditions Running during days September 23, 2010 LCTPC WP phone meeting #114

LCTPC WP phone meeting #114 Other news Priority for Octopuce is to get the external trigger working with the software Pixelman The new FECs have been submitted to the factory and should be available at the end of October. We tested the new Backend end and FEM with the DAQ (rate up to 40 Hz) in Zero Suppressed mode. Fully compatible with TLU. Gilles De Lentdecker proposed to send his student Thierry to Saclay to help the implementation of Micromegas analysis in MarlinTPC. Paul wants to have an analysis meeting Tuesday next week (October 28) in DESY September 23, 2010 LCTPC WP phone meeting #114