Team member1 Team member2 Team member3 Team member4 Feb. **, 2009

Slides:



Advertisements
Similar presentations
Program Management Office Department of Innovation & Technology City of Boston Kickoff Meeting.
Advertisements

Evaluation and Reporting ENTC 4060 Project Scheduling.
Widget Project Update Team member1 Team member2 Team member3 Team member4 October 8, 2011.
CUTTHROAT ENERGY Preliminary Design Review. Sponsored by:
Term Project Teams of ~3 students Pick a system (discuss choice with me)  Want simple functionality, security issues, whole system (e. g., client and.
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
Office Designs The Design Process at Work © MS Office Suite.
Case Insurance business related IT issues Consultation based instead of implementation based 5-7 universities compete 3 weeks preparation period PP slides.
CSULB EE400D Documentation Instructional Series
Kick-off meeting EL2421, Automatic Control, Project Course.
INFO 330 Class Project Do it for real. Overview of the Class Project Scope – Approximately the same as the sample project – Standard starting place Marketing.
Travel Website Enhancement Project Project Update First Name Last Name.
Lecture for Senior Design Classes By Dr. Pam Estes Brewer Associate Professor, TCO Mercer University School of Engineering Brewer (Adapted from presentation.
Designing Written Reports Presentation for Senior Design Classes by Dr. George Hayhoe Professor, Technical Communication Mercer University School of Engineering.
Project Status Report Presenter Name Presentation Date.
TOOL SELECTION ACTIVITY POSTED ON D2L FOR STUDENTS PM 440 – Project A Mayowa Teriba Anusha Ravulapati Aileen Laughlin.
ECE 4901 Computer and Electrical Engineering Design I John Chandy
Widget Project Update Team member1 Team member2 Team member3 Team member4 October 2015.
Dr. Susan Codone Mercer University Multimedia Conversion of Room 203 Mickey Mouse, Donald Duck, Hilary Duff, & Brittany Spears December 2, 2004.
ECE 4901 Computer and Electrical Engineering Design I John Chandy
McKesson Automation Interview Techniques. McKesson Automation Founded in hospital clients employees Broad array of medication and supply.
Eng. Technology Project SE 101 LACC Team #. NOTE The following is just a model. You are not limited to it. You are welcome to expand it as much as you.
Senior Design SR22 Canard September 28, Meeting Objectives 1.Decide on deliverables for PDR (20min) 1.Establish a presentation for Tuesdays Trip.
Remote Pet Feeder Project Status Update Team member1 Team member2 Team member3 Team member4 9 February 2016.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Job Description Training
Project Management Jukka A. Miettinen September 4, 2006
IE 8580 Module 1: Course Preliminaries
Unit 6 Application Design Practice Assignment.
Oral Exam Information Session
Presenter Name Presentation Date
Remote Pet Feeder Project Status Update
Project Points Software Specification Lecture 8
Presenter Name Presentation Date
Project Planning GCP 2008.
Engineering Design Process
YOUR TABLE # Team Members Names Here:
Introduction to New Product Development (Portfolio)
Wentworth Institute of Technology
Presenter Name Presentation Date
Executive Summary Project Name: Period :.
IS372 Project Management Olayele Adelakun (Ph.D)
Team member1 Team member2 Team member3 Team member4 November 2018
STATUS REPORT.
Project Status Review Purpose: To anticipate prototype performance
Engineering.
Why Do We Have To Do Oral Presentations???
IS&T Project Reviews September 9, 2004.
Team member1 Team member2 Team member3 Team member4 17 September 2009
Monday 9/18/17 Copy this week’s schedule into your assignment notebook. Copy exactly as it written please. Notebook Entry: Review the list of criteria.
Multimedia Conversion of Room 203
Presenter Name Presentation Date
Team member1 Team member2 Team member3 Team member4 October 2016
LO3 - Be able to Present Business Solutions to Stakeholders
Day in the life – Small Business Owner
Project - Execution stage
Unit 5 – eProject – Starting to look at projects Unit 5
Paragraph Structure. Connectives. Comprehension Text structure.
introducing MICHELLE SLY
Remote Pet Feeder Project Status Update
Team Title Team Members.
ELE 491 Senior Design Project Proposal
Equipment 5.4 is covered earlier on in the spec in some detail. This lesson combines 5.4 and 5.5. This lesson also recaps unit 1 and calculating kilowatt.
Presenter Name Presentation Date
Presenter Name Presentation Date
Executive Project Kickoff
Project Name TEAM MEMBER 1 NAME TEAM MEMBER 2 NAME TEAM MEMBER 3 NAME
PROJECT NAME YOUR LOGO PROJECT CODE: PROJECT MANAGER: DATE OF REPORT:
2019 Boeing Innovation Challenge
Prime Applicant – Project Title
Presentation transcript:

Team member1 Team member2 Team member3 Team member4 Feb. **, 2009 Widget Project Update Team member1 Team member2 Team member3 Team member4 Feb. **, 2009

Widget Project Brief 2 sentence description of project & deliverable. Develop a prototype remote control widget for use in helping pet owners walk their pet from their office. It must be able to walk the pet for 30 minutes. Client: Gadget Co (Supply a graphic or picture representative of project)

Design Status Design status: incomplete. Feasibility Criteria: Completed Specifications: Complete. Testing required for size limit: 75% complete Preferred design has been selected. Design calcs: 75% complete Drawings: 75% complete PDR scheduled 09 Apr 2009 2:00PM, Room 204A

Preliminary Designs Overview of favorite design approach (attached 1 sketch) Discuss Merit Analysis/Design selection process Engineering analyses planned. Simulation of device in MATLAB Stress analysis in ANSYS Circuit board layout in SPICE

Current Project Schedule Is project on schedule? YES/NO Why? How will you compensate to meet your completion date? When did you meet with client last?

Current Issues & Plan for Success Highlight any known problems that could delay design completion E.g., data not avail., specs incomplete, client decease, etc. Propose potential solutions to problems (or seek help) to complete on time E.g., find similar data, plan to get new client and get specs, find another vendor, etc.

Work Assignments What tasks have each person completed in the last 2 weeks with hours worked? Bill: Fred: Susan: Kim: What tasks will each person doing in the next 2 weeks.

The next two slides are backup material to be presented if asked.

Design Feasibility Criteria X

Design Specification X