4x5 SC array for the test beam in Apr 2007

Slides:



Advertisements
Similar presentations
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
Advertisements

D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
USC 55 Layout w/Rack Wizard View from the front of the racks, crate arrangement is necessary for sharing of e/  data on cables. To GCT Spare Rack.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Detector Cabling and Patching Rainer Schwemmer
June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.
CMS ECAL Elba May 2006 R M Brown - RAL 1 The Status of the CMS Electromagnetic Calorimeter R M Brown On behalf of the CMS ECAL Group.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
The CMS Electromagnetic Calorimeter at the LHC
How do we know the present in-line patch panel size (25 x 25 x 2.5 cm**3) will fit in the available space? ECAL Barrel In-line optical patch panel sketch.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
Transition to cables Staves Services IP Underside of stave: IBL modules IBL Design.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
CMS Detector Control Room Barrel Endcap YB-2 YB-1 YB0 YB+1 YB+2 Far tower Near tower Rack X4V22 Rack X3V22 Rack X2V22 Easy crate Link box Na tym rysunku.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Request Dispatching for Cheap Energy Prices in Cloud Data Centers
SpringerLink Training Kit
From Word Embeddings To Document Distances
Choosing a Dental Plan Student Name
THỰC TIỄN KINH DOANH TRONG CỘNG ĐỒNG KINH TẾ ASEAN –
D. Phát triển thương hiệu
BÖnh Parkinson PGS.TS.BS NGUYỄN TRỌNG HƯNG BỆNH VIỆN LÃO KHOA TRUNG ƯƠNG TRƯỜNG ĐẠI HỌC Y HÀ NỘI Bác Ninh 2013.
HF NOISE FILTERS PERFORMANCE
Parameterization of Tabulated BRDFs Ian Mallett (me), Cem Yuksel
实习总结 (Internship Summary)
Front End Electronics for SOI Monolithic Pixel Sensor
CS284 Paper Presentation Arpad Kovacs
Summer Student Program First results
HERMESでのHard Exclusive生成過程による 核子内クォーク全角運動量についての研究
Wavelet Coherence & Cross-Wavelet Transform
Creating Synthetic Microdata for Higher Educational Use in Japan: Reproduction of Distribution Type based on the Descriptive Statistics Kiyomi Shirakawa.
Hui Wang†*, Canturk Isci‡, Lavanya Subramanian*,
Fuel cell development program for electric vehicle
Overview of TST-2 Experiment
Optomechanics with atoms
داده کاوی سئوالات نمونه
Inter-system biases estimation in multi-GNSS relative positioning with GPS and Galileo Cecile Deprez and Rene Warnant University of Liege, Belgium  
Wissenschaftliche Aussprache zur Dissertation
FLUORECENCE MICROSCOPY SUPERRESOLUTION BLINK MICROSCOPY ON THE BASIS OF ENGINEERED DARK STATES* *Christian Steinhauer, Carsten Forthmann, Jan Vogelsang,
Advisor: Chiuyuan Chen Student: Shao-Chun Lin
Widow Rockfish Assessment
SiW-ECAL Beam Test 2015 Kick-Off meeting
On Robust Neighbor Discovery in Mobile Wireless Networks
Fairness-oriented Scheduling Support for Multicore Systems
Hui Wang†*, Canturk Isci‡, Lavanya Subramanian*,
Ch48 Statistics by Chtan FYHSKulai
The ABCD matrix for parabolic reflectors and its application to astigmatism free four-mirror cavities.
Measure Twice and Cut Once: Robust Dynamic Voltage Scaling for FPGAs
Online Learning: An Introduction
The Toroidal Sporadic Source: Understanding Temporal Variations
Online Social Networks and Media
Limits on Anomalous WWγ and WWZ Couplings from DØ
Experimental Method: 2 independent detectors on both sides of IP
Overview Detector details Crystals Photo-detectors
Preparation for Station Acceptance Test
Fiber Installation for RUN 3&4
CMS SLHC Calorimeter Trigger Upgrade,
CMS ECAL Calibration and Test Beam Results
Quick link: cern.ch/cmstb04
UK CMS Oversight Committee Mtg
Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B
PROGRESS on EE VPTs, Dees D Cockerill
Experimental Method: 2 independent detectors on both sides of IP
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

4x5 SC array for the test beam in Apr 2007 Dee Calibration Apr 2007 4x5 SC array for the test beam in Apr 2007 D Cockerill, 10 April 2006

VPT sorting by SC position Mean ~33 e/MeV now Old data D Cockerill, 10 April 2006

Backplate angle as for beam from CMS I.P. SC region on Dee Backplate angle as for beam from CMS I.P. =2.5 =1.57 TT26 TT19 D Cockerill, 10 April 2006

Appropriate any five trigger mapping DCC boundary TCC boundary ‘Any 5’ trigger map D Cockerill, 10 April 2006

Readout needed for 20 SCs 100 trigger GOH 20 data GOH Dee patch panel H4 control room Short fanout trunk cable MPO MPO Readout needed for 20 SCs 100 trigger GOH 20 data GOH Short fanouts on Dee FE – DCC 20 optical lines = 2 short fanouts (24 lines) FE – TCC 100 optical lines = 9 short fanouts (108 lines) MEM 24 optical lines = 2 short fanouts Totals 144 optical lines 13+1 = 14 short fanouts MPO trunk cables from Dee to H4 CR (barrel had MFS trunk cables at SM10 end) 2 trunk cables 2*96 = 192 lines +1 trunk cable for CCS/token rings/MEM D Cockerill, 10 April 2006

Additional info D Cockerill, 10 April 2006

Transverse noise across Dee, VPTs sorted ET from 30 – 60 MeV (old normalisation) D Cockerill, 10 April 2006