PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Tam Valley School Modernization - Phase 1 Summer 2011.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Willie Lee Dillard 561 Ridgecrest Drive, Danville, VA * Phone: * The following is.
Flip this House Indiana! WE BELIEVE!!. Budget Septic$7,500 Sump Pump$1,100 Mold Treatment$600 gutters vinyl$350 window install$4,500 HVAC$750 carpet$2,000.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
HJ S Properties 717 West Main Street, Ashland, WI Apartment Inspection Report - January 2012 Complete by Richards Management – Donald Richards CEO.
Cathedral of the Immaculate Conception Project Information Session.
A Duplex Conversion the First Time Sandra Shuffler Change Manager, Investor, Mom.
Floor-Plan Dimensions and Notes
S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Glen Hardin – House Remodel
Civil Engineering & Architecture 2.3 Residential Design.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
R.H. ADCOCK / ARCHITECT AND ASSOCIATES, INC. Slide 1 GOSSAMER COVE Redwood City, CA Illustrated Preliminary Defect List Presented By: R.H. ADCOCK / ARCHITECT.
Competency: Draw Floor Plans Objective: Identify floor plan symbols.
Chief Architect Unit Identify the Part Grade 7 Computer Unit.
House Design Project Overview What each student must accomplish – 10 journals: date, time, weather, and what was accomplished or learned – Bubble drawings.
 Home Upgrades & Repairs  2124 Kittredge Street, Berkeley CA  Phone: (510)   Serves Berkeley, Albany,
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Dave Brake, Darren Adams, Sean Tobin Charmaine Dean, Jessie MacDonald.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
Housing Authority of Cook County Rental Assistance Demonstration Program Richard J. Monocchio – Executive Director.
Graphic Communication
Finishing the Building
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
Building Plans.
…….Another Man’s Treasure Vance Drive Apartments Transitional Housing.
HOME MODEL. P e r s p e c t i v e HOME MODEL 4.00m X 5.50m Floor Area = 22 sqm. Turn-over unit 4.00m 5.50m 1.4m 4.00m.
Who we are Orrix Homes Jeremy Laviolette Dylan Kugler Board of Directors John Giesbrecht Rick Kugler.
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
BEFORE AFTER SHANKLIN – PARAPET RESTORATION FY 15 Before and After SHANKLIN – PARAPET RESTORATION.
Objective 7.06 INTERPRET simple drawings. Draw the symbols onto graph paper. Cut out each symbol and glue onto a notecard.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Orthographic Drawings
Hogan Residence Basement Bath Addition Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition Upstairs Bathroom Remodel.
Smrha-Monroe Family Pictures of the House August 2005.
Home looks better with us. Not staged Staged Start your home selling or remodeling project with a few questions…... Why do you think your house is not.
Slide 1 of 33 Home Inspection Class Redfin’s Montgomery Team September 5, Bethesa, MD Host: Michael Wells & Margaret Plumly Like:
Understanding the FHA 203K STREAMLINE AfterBefore.
“Best Improved Residential Property” and “Best Improved Commercial Property” City of Hallandale Beach City of Choice.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Administration Offices Proposed by: Wyatt Marvin and Mitch Sander.
IET 120 Project #4 Matthew Porter Construction Project.
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Old world craftsmanship... timeless beauty.
Introducing the Dakota 28483D
Foundations of Technology Construction
Major Steps In Building a SFR
* 07/16/96 Site Development Plan * ##.
Construction Documents
Construction Drawings for Graphic Communication
“THE BOBCAT DEN” Tiny House ARI Grant
Design your house the way it must be done!
Competency: Draw Floor Plans
realestatemarket.com.
Competency: Draw Floor Plans
How & When to Get Permits for Work in Your Home
Competency: Draw Floor Plans
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
House Construction Budget Plan
Foundations of Technology Construction
Minuteman Vocational Technical Regional High School Progress
CRA Grant Programs Overview.
Presentation transcript:

PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008

Parkview Apartments – Rehabilitation Work Items Demolition Work Items Asbestos & Lead Abatement Site & Building Interior/Exterior Demolition Pest Control Treatment Site & Building Exterior Work Items Awning & Trim Installation Sewer Drain Line Replacement Roof Replacement Siding Replacement Water Line Replacement Balcony Fabrication & Installation Concrete Replacement Landing, Stairway & Railings Replacement Exterior Painting Building Interior Work Items Drywall Installation Insulation Installation Shear Wall Installation Bathroom Tub & Shower Replacement Window & Door Replacement Kitchen & Bath Cabinet Replacement Electrical Repairs & Fixture Replacement All New Flooring Replacement Interior Painting Plumbing Repairs & Replacement

Parkview Apartments – Existing Exterior Condition

Parkview Apartments – Existing Condition of Kitchen

Parkview Apartments – Existing Condition of Bathroom & Plumbing

Parkview Apartments – Rehabilitation Transformation

Parkview Apartments – New Exterior Condition (During Construction)

Parkview Apartments – New Kitchen Area (During Construction)

Parkview Apartments – New Bathroom Area (During Construction)

Parkview Apartments – New Exterior Detail (During Construction)

Parkview Apartments – Exterior Modification (During Construction)

Parkview Apartments – Financing Sources and Uses

Parkview Apartments – Housing Management Rent Schedule