Engineering Economics

Slides:



Advertisements
Similar presentations
Engineering Economics I
Advertisements

Engineering Economics ENGR 3300
Engineering Economics
Chapter 2 Solutions 1 TM 661Chapter 2 Solutions 1 # 9) Suppose you wanted to become a millionaire at retirement. If an annual compound interest rate of.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Interest Formulas (Gradient Series)
(c) 2002 Contemporary Engineering Economics
Interest Formulas for Single Cash Flows
(c) 2002 Contemporary Engineering Economics
Contemporary Engineering Economics, 4 th edition, © 2007 Unconventional Equivalence Calculations Lecture No. 9 Chapter 3 Contemporary Engineering Economics.
LECTURE 6 NONUNIFORM SERIES Prof. Dr. M. F. El-Refaie.
EGR 403 Capital Allocation Theory Dr. Phillip R. Rosenkrantz
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
Interest Formulas (Gradient Series) Lecture No.6 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Single-Payment Factors (P/F, F/P)
Exam I Review Exam is closed text book, no loose sheet paper
Economic System Analysis January 15, 2002 Prof. Yannis A. Korilis.
TM 661 Engineering Economics for Managers Unit 2 Multiple/Continuous Compounding.
Interest Formulas – Equal Payment Series
ENGINEERING ECONOMICS ISE460 SESSION 3 CHAPTER 3, May 29, 2015 Geza P. Bottlik Page 1 OUTLINE Questions? News? Recommendations – no obligation Chapter.
1 Word Problems Organize the Data Given: Determine the objective and your strategy. Draw the Cash Flow Diagram. Write Equations and Solve. Reflect Back.
1 Cash Flow Patterns The “LEGO” blocks of Engineering Economics.
Equivalence of cash flows Construction Engineering 221.
Lecture No. 9 Chapter 3 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
TM 661 Engineering Economics for Managers Unit 1 Time Value of Money.
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
(c) 2002 Contemporary Engineering Economics 1. Engineers must work within the realm of economics and justification of engineering projectsEngineers must.
Living with the lab Engineering Economics - Cash Flow Diagrams Cash flow diagrams provide a simple way to visualize the cash that comes “in” and the cash.
Equivalence Factors and Formulas Moving Money Around.
Engineering Orientation Engineering Economics. Value and Interest Cost of Money Simple and Compound Interest Cash Flow Diagrams Cash Flow Patterns Equivalence.
Equivalence Calculation under Inflation
MBA – 401:5 Accounting for Decision Makers (MBA 401) Lecture Title No. 5 Time Value of Money Document map: No. MBA401/5/PPT Version: #1 Status:
Chapter 9 – Engineering Economic Analysis
Chapter 4: The Time Value of Money
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Interest Formulas – Equal Payment Series
Unconventional Equivalence Calculations
Contemporary Engineering Economics
Practical uses of time value of money factors
Chapter 2. Time Value of Money
Chapter 2 Time Value of Money
Interest Formulas for Single Cash Flows
Irregular Payment Series and Unconventional Equivalence Calculations
Complex Cash Flows Break complex flows into simpler patterns:
Economic Equivalence Lecture No.5 Chapter 3
Example 2.14:Powerball Lottery
NE 364 Engineering Economy
Chapter 2 Factors: How Time and Interest Affect Money
LECTURE 6 NONUNIFORM SERIES
Chapter 4: The Time Value of Money
CTC 475 Review Uniform Series Find F given A
Chapter 2 Factors: How Time and Interest Affect Money
Engineering Economic Analysis
Chapter 2 Factors: How Time and Interest Affect Money
Chapter 2 Factors: How Time and Interest Affect Money
Let’s work some problems…
Interest and Interest Rate
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
UNDERSTANDING MONEY MANAGEMENT
Problem 1 You deposit $5000 in a savings account that earns 10% simple interest per year and withdraw all your money at the end of the fifth year. But.
IET 333: Week 3 Jung-woo Sohn
Engineering Economics - Introduction
Let’s work some problems…
Chapter 4: The Time Value of Money
Perpetuity (Capitalized Cost) The relationship is A = P( i )
Let’s work some problems…
CTC 475 Review Simple vs Compound Interest Find F given P
Future Value of Investments
Contemporary Engineering Economics
Presentation transcript:

Engineering Economics 12/2/2018 2:17 PM Concepts from the example problems ( F / P, i, N)  Problem 1 ( P / F, i, N)  Problem 2 ( F / A, i, N)  Problem 3 ( A / F, i, N)  Problem 4 ( P / A, i, N)  Problem 5 ( A / P, i, N)  Problem 6 ( P / G, i, N)  Problem 7 ( A / G, i, N)  Problem 8 Copyright (c) 2004 - 2008, K. D. Douglas & D. H. Jensen

Example 1 How much would you have to deposit today to have $2000 in 4 years if you can get a 12% interest rate compounded annually? GIVEN: F4 = $2 000 i = 12% FIND P: 1 2 3 n=4 P? $2 000 DIAGRAM: P = F4(P/F,i,n) = 2 000(P|F,12%,4) = 2 000(0.6355) = $1 271

Different Ways of Looking at P/F From previous example, if you can earn 12% compounded annually, you need to deposit $1271 to have $2000 in 4 years. You are indifferent between $1271 today and $2000 in 4 years, assuming you can earn a return on your money of 12%. $1271 today and $2000 in 4 years are equivalent, if you can earn 12% on your money. The present worth of $2000 in 4 years is $1271 (i = 12% cpd annually). If you could get 13% on your money, would you rather have the $1271 today, or $2000 in 4 years

Example 2 Tuition costs are expected to inflate at the rate of 8% per year. The first year’s tuition is due one year from now and will be $10,000. To cover tuition cost for 4 years, a fund is to be set up today in an account that will earn interest at the rate of 5% per year, compounded annually. How much must be deposited into the fund today in order to pay the 4 years of tuition expenses?

Present Given Gradient (Geometric) Engineering Economics 12/2/2018 2:17 PM Present Given Gradient (Geometric) g is the geometric gradient over the time period (time period: Time 0 to Time n, 1st flow at Time 1) P is the present value of the flow at Time 0 (n periods in the past) i is the effective interest rate for each period Note: cash flow starts with A1 at Time 1, increases by constant g% n A1 P ? 1 2 3 P = A1(P/A,g,i,n) g = % Copyright (c) 2004 - 2008, K. D. Douglas & D. H. Jensen

Example 2 Tuition costs are expected to inflate at the rate of 8% per year. The first year’s tuition is due one year from now and will be $10,000. To cover tuition cost for 4 years, a fund is to be set up today in an account that will earn interest at the rate of 5% per year, compounded annually. How much must be deposited into the fund today in order to pay the 4 years of tuition expenses?

Example 2 - Concept If your rich Aunt Edna wanted to put a sum of money in the bank today to pay for your next four years of tuition, that sum would be $39,759 assuming 5% return on investment and tuition that begins at $10,000 increasing by 8% per year. This problem assumes tuition is due at the end of the year.

Complex Cash Flows Complex Cash Flows – Break apart (or separate) complex cash flows into component cash flows in order to use the standard formulas. Remember: You can only combine cash flows if they occur at the same point in time. (This is like building with LEGOs!)

Problem 3 A construction firm is considering the purchase of an air compressor. The compressor has the following expected end of year maintenance costs: Year 1 $800 Year 2 $800 Year 3 $900 Year 4 $1000 Year 5 $1100 Year 6 $1200 Year 7 $1300 Year 8 $1400 What is the present equivalent maintenance cost if the interest rate is 12% per year compounded annually?

Problem 3 – Alt Soln 1 GIVEN: MAINT COST1-8 PER DIAGRAM i = 12%/YR, CPD ANNUALLY FIND P: P = PA + PG + PF = A(P/A,i,n) + G(P/G,i,n) + F(P/F,i,n) = $700(P/A,12%,8) + $100(P/G,12%,8) + $100(P/F,12%,1) = $700(4.9676) + $100(14.4715) + $100(0.8929) = $5014 DIAGRAM: P ? 1 2 3 n=8 $700 $100 4 $200 $300 PA ? 1 2 3 n=8 $700 4 $100 PF ? n=1 PG ? 1 2 3 n=8 $100 $700 $200 $300 4 NOTE: CAN BREAK INTO 3 CASH FLOWS: ANNUAL, LINEAR GRADIENT, AND FUTURE

Problem 3 – Alt Soln 2 GIVEN: MAINT COST1-8 PER DIAGRAM i = 12%/YR, CPD ANNUALLY FIND P: P = PA + PG(PPG) = A(P/A,i,n) + G(P/G,i,n-1)(P/F,i,1) = $800(P/A,12%,8) + $100(P/G,12%,7)(P/F,12%,1) = $800(4.9676) + $100(11.6443)(0.8929) = $5014 DIAGRAM: P ? 1 2 3 n=8 $800 $100 $600 4 $200 PA ? 1 2 3 n=8 $800 4 PG ? PPG ? 1 PG ? 1 2 n=7 3 $100 $600 $200 NOTE: PG MUST BE OFFSET ONE YEAR – SO BRING THE OFFSET YEAR BACK TO TIME ZERO

Problem 4 A young couple has decided to make advance plans for financing their 3 year old daughter’s college education. Money can be deposited at 8% per year, compounded annually. What annual deposit on each birthday, from the 4th to the 17th (inclusive), must be made to provide $7,000 on each birthday from the 18th to the 21st (inclusive)? 17 21 yrs $7 000 A ? DIAGRAM: 4 18 GIVEN: WITHDRAWALS18-21 = $7 000 i = r = 8%/YR, CPD YEARLY FIND A4-17: P17 = A(F/A,i,n) = A(P/A,i,n) = A(F/A,8%,14) = 7 000(P/A,8%,4) = A(24.2149) = 7 000(3.3121)  A = $957 STRATEGY: CAN BREAK INTO 2 CASH FLOWS, SO PICK A CONVENIENT POINT IN TIME AND SET DEPOSITS EQUAL TO WITHDRAWALS…