R&D Highlights Seismic Isolation Suspensions ISC/40m

Slides:



Advertisements
Similar presentations
LIGO - G R 1 HAM SAS Test Plan at LASTI David Ottaway November 2005 LIGO-G Z.
Advertisements

G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
LIGO- G M State of the LIGO Lab Stan Whitcomb LSC meeting Hanford 17 August 2004.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
LIGO-G W Raab: Searching for Gravitational Waves w/ LIGO1 Why Has Duty Cycle Been Lower in Livingston.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
G R LIGO Laboratory1 Advanced LIGO Research and Development Update Dennis Coyne LSC Meeting at LLO 16 March 2004.
LIGO-G06xxxx-00-M Technical Progress Planned/Needed in FY07 Advanced LIGO Program Advisory Panel meeting, 30 November – 1 December 2006, MIT Dennis Coyne,
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
G D Tasks After S3 Commissioning Meeting, Oct 6., 2003 Peter Fritschel, Daniel Sigg.
LIGO and Advanced LIGO: Technical Issues Dave Ottaway (for LIGO Scientific Community) LIGO Lab Kavli Institute for Astrophysics and Space Research, Massachusetts.
Overview of Research in the Optics Working Group Gregory Harry, on behalf of the OWG Massachusetts Institute of Technology July 25, 2007 LSC Meeting –
LIGO-G D Installation and Commissioning Status Stan Whitcomb Program Advisory Committee 14 June 2001 Caltech.
LIGO-G M May 31-June 2, 2006 Input Optics (IO) Cost and Schedule Breakout Presentation NSF Review of Advanced LIGO Project David Reitze UF.
LIGO-G W Commissioning and Performance of the LIGO Interferometers Reported on behalf of LIGO colleagues by Fred Raab, LIGO Hanford Observatory.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
G M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007.
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
G Z LIGO R&D1 Input Optics Definition, Function The input optics (IO) conditions light from the pre- stabilized laser (PSL) for injection into.
DFG-NSF Astrophysics Workshop Jun 2007 G Z 1 Optics for Interferometers for Ground-based Detectors David Reitze Physics Department University.
G Consideration of HAM SAS for Advanced LIGO David Shoemaker LIGO Excomm 30 April 07.
LIGO-G D LIGO and Industry Capability/ProductCompany Ultra-high Vacuum TechnologyCB&I Passive Seismic IsolationHytec Inc. Active Seismic IsolationBarry.
1 Feedback from the executive committee meeting Benno Willke GEO meeting, Glasgow October 2006.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
G R LIGO Laboratory1 Advanced LIGO David Shoemaker NSF LIGO Review 23 October 2002.
G R 1 Advanced LIGO Update David Shoemaker LSC LHO March 2006.
David Shoemaker Aspen 3 February 03
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
Initial and Advanced LIGO Detectors
Advanced LIGO Simulation, 6/1/06 Elba G E 1 ✦ LIGO I experience ✦ FP cavity : LIGO I vs AdvLIGO ✦ Simulation tools ✦ Time domain model Advanced.
G R Proposed Adv. R&D FY R&D for Advanced LIGO David Shoemaker & Dennis Coyne 29 January 2001.
TCS and IFO Properties Dave Ottaway For a lot of people !!!!!! LIGO Lab Kavli Institute for Astrophysics and Space Research, Massachusetts Institute of.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
Advanced LIGO Status Report
Status of LIGO Andri M. Gretarsson Livingston Observatory LIGO-G L.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Initial and Advanced LIGO Status Gregory Harry LIGO/MIT March 24, 2006 March 24, th Eastern Gravity Meeting G R.
Cascina, Nov. 4 th, 2008 AdV review 1 AdV Injection system E. Genin European Gravitational Observatory.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
LIGO Scientific Collaboration Lasers and Optics Working Group 6 Month Report to the LSC - August 15, 2000 Outline Highlights Meeting Agenda LIGO-G D.
G D LIGO Commissioning Update LSC Meeting, March 16, 2004 Peter Fritschel.
G R LIGO R&D1 Advanced LIGO Update David Shoemaker LSC LHO August 2004.
G R Advanced LIGO1 David Shoemaker LLO LSC 19 Aug 2002.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
LIGO-G M State of the LIGO Laboratory Gary Sanders LIGO/Caltech LSC Meeting, LLO March 16, 2004 State of LIGO.
LIGO- G M LIGO Status Stan Whitcomb Oversight Committee 20 October 2004.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer. at the Caltech 40m interferometer. Yoichi Aso*, Rana Adhikari,
NSF Annual Review of the LIGO Laboratory
LIGO Scientific Collaboration
Aspen January, 2005 Nergis Mavalvala
Reaching the Advanced LIGO Detector Design Sensitivity
Outline ideas/status K.A. Strain
Evolution of the Virgo detector: The Virgo+ plans
Commissioning Progress and Plans
Installation and Commissioning Status Stan Whitcomb
Commissioning Update PAC 15, Dec. 11, 2003 Daniel Sigg.
Commissioning the LIGO detectors
Status of the LIGO Detectors
Status of LIGO Installation and Commissioning
Jim Hough for the GEO collaboration
Advanced LIGO Research and Development
LIGO Scientific Collaboration
P Fritschel LSC Meeting LLO, 22 March 2005
Improving LIGO’s stability and sensitivity: commissioning examples
HAM SAS Test Plan at LASTI
Presentation transcript:

R&D Highlights Seismic Isolation Suspensions ISC/40m Successful implementation of HEPI Further commissioning of platform at Stanford Suspensions Installation of Mode Cleaner triple suspension at LASTI ISC/40m Completed installation, locked lots of bits Found problem with locking scheme (sidebands on sidebands)….probably found solution (Mach-Zehnder) LIGO R&D

R&D Highlights Pre-stabilized laser Input Optics Power Stage injection locked 170 W, single frequency laser! Input Optics Thermal focussing/matching approach successfully prototyped Auxiliary Optics/Thermal compensation Successful application to initial LIGO Analysis includes inhomogeneity of coating absorption – important for substrate selection LIGO R&D

R&D Highlights Coatings Core Optics Reductions in absorption with increasing dopant in Titania (LMA) Need another factor 2-3 reduction… Core Optics Focussed on substrate selection Many ingredients – astrophysics, implementation, risks Important to get LSC input at this meeting LIGO R&D