VLA to EVLA Transition Plan

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, 2007 Project Management Mark McKinnon Project Manager.
EVLA Computing Schedule, Staffing, Testing, Tracking.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
McMullinEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing: SSG (AIPS++/CASA) Development J. McMullin.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
RupenEVLA Advisory Committee Meeting May 8-9, Scientific Oversight and Testing of Software Michael P. Rupen EVLA Project Scientist for Software.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Bryan ButlerEAC meeting 2003-Sep-091 Computing Issues: Scientific Requirements Bryan Butler EVLA Project Scientist for Software (starting 2003-Oct-01)
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
M.P. RupenEVLA Advisory Committee Meeting September 6-7, Correlator Test Plan Michael P. Rupen.
Mark McKinnon NSF Mid-Project Review May 11-12, EVLA Advisory Committee Reports Mark McKinnon Project Manager.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Bill SahrNSF Review May , EVLA Monitor & Control.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
S.T.MyersEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing Overview Steven T. Myers AIPS++ Project Scientist.
RupenEVLA Advisory Committee Meeting May 8-9, Software Testing Michael P. Rupen EVLA Project Scientist for Software.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Bryan Butler EVLA Computing Division Head
EVLA Basic Operations Jim Ulvestad
EVLA Availability - or - When Can I Use It?
Committee Charge Fred K.Y. Lo
Monitor and Control Software
First Light Science: Observing Strategies
EVLA Computing Software Overview.
Oxford Algorithms Workshop
Budget, Schedule, Contingency
Software Requirements
Rick Perley National Radio Astronomy Observatory
Shared Risk Observing Claire Chandler EVLA SSS Review, June 5, 2009
Scientific Oversight and Testing of Software
EVLA Advisory Committee Meeting
Science Commissioning
Science Advisory Group for EVLA
Software Requirements
Gustaaf van Moorsel September 9, 2003
Software Requirements
Shared Risk Science with the EVLA
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Advisory Committee Meeting, March 19-20, 2009
Observatory Science Operations
EVLA Operations Jim Ulvestad
Observatory Science Operations
Prototype Correlator Tests on the Critical Path
Correlator Growth Path
NMA and E-array Progress
EVLA Construction Status
EVLA Postprocessing Algorithms
Presentation transcript:

VLA to EVLA Transition Plan 2005-2010 Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

First Version of Transition Plan The talk includes 1) A broad outline of the hardware and scientific goals for EVLA transition. 2) Discussion of the some key aspects of this plan. Note that detailed planning in each area is still very much underway. Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

Two Transition Plan Committees Scientific Committee (Owen, Butler, Carilli, Claussen, Chandler, Frail, Perley, Rupen, Myers) Overall Operations Committee (Owen, McKinnon, Van Buskirk, Van Moorsel) Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Advisory Committee Meeting Assumptions Accelerated funding continues. Hardware Milestones are met. Software is available on schedule. Necessary Personnel are available. EVLA Phase I only is considered. Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Hardware Milestones Dec 2005: 5 EVLA Antennas Apr 2006: Prototype WIDAR Correlator Dec 2006: 10 EVLA Antennas Jan 2007: Interim WIDAR Correlator Dec 2007: 16 EVLA Antennas Jul 2008: Full WIDAR Correlator • Dec 2008 22 EVLA Antennas Oct 2009 27 EVLA Antennas Dec 2009 28 EVLA Antennas Jun 2012 Final EVLA Receiver Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Advisory Committee Meeting Science Goals Feb 2005: Start Integrating EVLA antennas into VLA Apr 2006: Begin Prototype Correlator Testing Jan 2007: Begin Using New Frequencies on EVLA antennas with old correlator Mar 2007: Begin Science Commissioning of WIDAR May 2008: Begin “Shared Risk” Observing Oct 2009: Regular Observing with 27 Antennas Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Advisory Committee Meeting Individual Areas Progress is still needed in some key areas to achieve these goals. In a number of areas decisions still need to be made on what we need to attempt within the scope of EVLA phase I. Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

Post-Processing: Priority 1 EVLA continuum sensitivity probably requires imaging sources over the full primary beam even at the highest frequencies. EVLA gets its continuum sensitivity mostly by using large bandwidths. We currently have no algorithm which can image wide-field, wide-bandwidth data adequately. The highest priority for post-processing is to produce such algorithms we need for EVLA. Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Advisory Committee Meeting Post-Processing: 2005-2006 1) New Algorithms: Imaging, Interference 2) Computing Hardware Requirements 3) A Conceptual Model for How we will reduce EVLA data in 2009 Need to keep both AIPS and AIPS++ paths open for now to reach these goals and maintain our existing operations. Usability issues wait till 2007 when when our staff start to work with WIDAR. Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Advisory Committee Meeting E2e needs more people to meet the minimum goals in the EVLA I proposal: both programmers and astronomers. Desires exist for services beyond the EVLA I goals which will require more people. However, we can descope e2e if necessary and run EVLA more like VLA. Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Advisory Committee Meeting Computing Hardware In 2008-2010 timeframe it is hard to see how most users can reduce EVLA data from the large configurations at home. Probably need to do calibration and imaging at the AOC for many (most?) projects. Some sort of computing cluster with a very large memory is likely needed but more work is required to define the details. Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Advisory Committee Meeting Array Operations Major and continuing changes will occur from 2005-2010 One or two additional operators may be needed in the 2006-2009 A move of most EVLA operations to the AOC in 2010 and some decrease in operations staff is planned. Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Advisory Committee Meeting AOC Operations The nature of the AOC operations seems likely to change starting in 2008. EVLA data volume, computing requirements, and new calibration techniques may require most users to come to the AOC at least in the early years. AOC infrastructure and services will need to adapt. Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Advisory Committee Meeting Scientific Staffing In 2005, VLA Scientific staffing will be at a historical low point. Scientific Staff needs to expand, especially in 2006-2009 timeframe to deal with EVLA requirements. After 2009, the staffing levels of 2000 may be adequate for the long term for EVLA I. Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Scientific Staff Tasks Hardware Commissioning: Antennas, Receivers, WIDAR Correlator, Sensors, Misc EVLA testing Software Specifications, Advising, Testing: e2e, Algorithms, Postprocessing User Support: Dynamic Scheduling, Handholding, Documentation Scientific Operations Planning Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Scientific Staffing Profile 2006 +2.5 FTE’s (4-5 scientists) 2007 +0.5 FTE’s (1 more scientist) 2008 +0.5 FTE’s (1 more scientist) 2010 begin to return to pre-EVLA level Increases can be a combination of new tenure track astronomers, scientists, postdocs and visiting appointments Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Advisory Committee Meeting EVLA II and beyond When and if EVLA II is funded, we can add its requirements to the current plan. However, NRAO may want to think about EVLA II in choosing transition options for EVLA I. For example, EVLA I may not require FPGA assisted CPU’s but EVLA II (and SKA) will. Maybe we should plan AOC computing with the future in mind ? Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004

EVLA Advisory Committee Meeting Questions ? This plan is fairly aggressive and could well slip in time due to any of several factors. However, it may seem to the community that EVLA capabilities come fairly slowly. Does it seem too aggressive or not aggressive enough to the committee ? What areas of the transition plan need more discussion ? Frazer Owen EVLA Advisory Committee Meeting December 14-15, 2004