Christian Heidorn DIMESA 2008, 17 June Copenhagen

Slides:



Advertisements
Similar presentations
1 Update on progress in SOE-drafting group. 2 Water Directors Steering of implementation process Chair: Presidency, Co-chair: Commission Strategic Co-ordination.
Advertisements

Directorate E: Agriculture and environment statistics; Statistical cooperation Unit E3: Environment statistics and accounts Environmental Accounts European.
Ministry of the Environment and Territory Directorate for Development and Environmental Research Ministry of Economy and Finance Department for Development.
NFP/EEA Working Group on Eionet priority data flows (EPDF) - Status and developments for water Beate Werner Eionet FW workshop Copenhagen, 18 – 19 June.
The FDES revision process: progress so far, state of the art, the way forward United Nations Statistics Division.
State of play and outlook for future work Development of Agri-environmental Indicators Unit AGRI-F1 - “Environment, GMO and genetic resources”
New Policy Developments Overview from DG Environment Robert Kaukewitsch European Commission, DG Environment Sustainable Production and Consumption Working.
Directorate E: Agriculture and environment statistics; Statistical cooperation Unit E3: Environment statistics 1 ‘DIMESA 2006’ Preparation Meeting, 13.
1 Environmental Accounts in EUROSTAT London Group Meeting-New York June 2006 Rainer Muthmann, Head of Unit E3.
Directorate E: Agriculture and environment statistics; Statistical cooperation Unit E3: Environment statistics 1 Presentation on Cybernews Environmental.
1 The EEA/EIONET Information System current applications and further developments relevant for EECCA countries Stefan Jensen.
INSPIRE and the role of Spatial Data Interest Communities (SDIC)
European Topic Centre on Sustainable Consumption and Production (ETC/SCP) Lars Fogh Mortensen, Head of Group Sustainable Consumption and Production.
Alternative delivery models in public services
Biodiversity.europa.eu BISE EEA and ETC/BD Rania Spyropoulou.
Introduction to the EEA and the EIONET
Implementing the ESS Vision 2020
Mandate of the Working Group
Guidance on Natura 2000 and Forests – Scoping Document
Project Coordination Group (PCG) for the implementation of the MSFD
Water Information System for Europe (WISE) Concept and state-of-play
Guidance on Natura 2000 and Forests – Scoping Document
Marine Strategy Framework Directive (MSFD)
Short and long term strategy on Land Cover/Land Use information
Project Coordination Group (PCG) for the implementation of the MSFD
SISAI STATISTICAL INFORMATION SYSTEMS ARCHITECTURE AND INTEGRATION
DIMESA View from ENV 15/06/2006 Coordination at European level: "Group of 4" – Data Centres – ESS/EIONET Timo Makela Sustainable Development and.
DIMESA 2006 A view from DG Environment Timo Makela
‘Basic approach: Reporting and data handling’
Christian Heidorn, Eurostat DIMESA to 16 June 2009
Legal framework of territorial classifications and typologies for European statistics – state of play NUAC meeting, Brussels June 2015 Gorja Bartsch.
Environmental Data Centres at Eurostat
DG AGRI, Unit F6 Bioenergy, biomass, forestry and climatic changes
Eurostat Management Plan 2015 for Regional and Urban statistics
5. The Environmental Data Centre on Waste
Task III: Indicator Clearing House
5.1 Environmental Data Centre on Waste Progress report
WG Environmental Expenditure Statistics
New mandate for the Working Group
European Forest Data Centre & European Soil Data Centre Progress report Jesús San-Miguel Databases, early waringn, remote sensing, simulation models,
5.5. UN Framework for the Development of Environment Statistics (FDES)
S3P Agri-Food Working Committee Meeting
Giuliano Amerini Unit E6 (Transport)
Progress SOE Reporting NRC/NFP water workshop – 2nd October and SOE-DG/NRC meeting – 3rd October Beate Werner; EEA.
Change and adapt the Eionet water data flow to meet WFD requirements
Marine Strategy Framework Directive (MSFD)
Task Force on Target Setting and Reporting TFTSR
Monitoring and assessment of the marine environment under the European Marine Strategy Introduction The European Union is highly dependent on maritime.
Management of Natura 2000 Sites
EU Marine Strategy DG Environment B.1.
Information on projects
Progress SOE –drafting group
Relevance of GNB for CAP monitoring and evaluation system
Water Information System for Europe
Marleen De Smedt Geoffrey Thomas Cynthia Tavares
ORGANISATION DE COOPÉRATION ET DE DEVELOPMENT ÉCONOMIQUES
8-c) Expert Group & River Basin Network on WFD & Agriculture
The Biodiversity Information System for Europe (BISE)
Towards a Work Programme for the Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Water Directors Meeting 28 November.
EU Water Framework Directive
Legislative strategy for cross-cutting ESS legislation
European Marine Strategy
European Commission, DG Environment, Marine Unit
Environmental Accounts and Indicators
Scene setter European Commission DG Environment
Regional and Bilateral cooperation instruments
Concept paper on the assessment of WFD River Basin Management Plans
Projects under Pillar I of White Paper on Climate Change Adaptation
European Marine Monitoring and Assessment
Latest developments in the sphere of agri-environmental indicators
Presentation transcript:

Christian Heidorn DIMESA 2008, 17 June 2008 - Copenhagen 6.1 Group of Four co-ordination activities: Streamlining of environmental indicators Christian Heidorn DIMESA 2008, 17 June 2008 - Copenhagen Unit E.3 - Environment Statistics and Accounts

Environmental Indicators Go4 –Technical Arrangement: Background EUROSTAT: + Streamlining of Environmental Indicators … is establishing environmental Data Centres (DCs) on: Natural Resources Products (IPP) Waste … and is responsible for: + Streamlining of Environmental Indicators + Coordination of data quality issues

Background (2) Technical Arrangement signed by Directors General: "Eurostat will take the lead on a joint EEA/ESTAT/ENV inventory of the various indicator sets and the streamlining exercise. DG ENV and JRC will contribute to this work, which needs to take full account of the specific needs of different users".

Background (3) Various sets of environmental indicators maintained by EU bodies: Eurostat – EEA – JRC – DG Environment … and international organisations: OECD – UN (UNSD, UNEP …) The problem: ► Indicators have the same name but show different variables ►Indicators have different names, but show the same ►There are many, many indicators out there: DG Environment: “Indicator Jungle”

Objectives – based on previous work To get an overview of the major environmental indicators Improve indicators production by: Streamlining of indicators and … … the underlying data flows, reporting obligations … meta data, definitions … application of quality standards Clarification of “responsibilities”, better coordination among the indicator “owners”

Objectives (2) Streamlining is in practice: Eliminate obsolete and redundant indicators Provide insight into the purpose and inter- relationships of indicators, naming conventions Provide relevant background information for the indicator audiences Better organisation of the indicator production process

Study project: Streamlining of environmental indicators Tasks: Study project: Streamlining of environmental indicators Project start: January 2007 End: 19 March 2008 Task A: Preparation of a joint inventory Task B: Identification of streamlining potential Task C: Start the process of streamlining Workshop of 15 April 2008: Presentation of results and planning of further work

The inventory  A list of environmental indicators from 11 sets : SI (Structural indicators, Eurostat), SDI (Sustainable Development Indicators, Eurostat), CSI (Core Set of Indicators, EEA), SEBI 2010 (Streamlining European 2010 Biodiversity Indicators, EEA), EERM (Indicators of environmental integration of the energy sector, EEA), AEI (Agri-Environmental Indicators, ex-IRENA, Indicators Reporting on the Integration of Environmental Concerns into Agriculture Policy, EEA/Eurostat/DG AGRI/DG ENV/JRC), TERM (Transport and Environment reporting System, EEA), EPI (Environmental Pressure Indicators, Eurostat/DG ENV), “ISD” (Indicators of Sustainable Development, UNCSD), /11. KEI / CEI (Key- and Core- environmental indicators, OECD)

The inventory (2) 435 Indicators Eliminate non-purely environmental Indicators – 66 Eliminate “non-streamlineable” Indicators – 60

The potential 309 “streamlineable” indicators Put in order, set a framework – 48 “clusters” 9 further regroupings made – 29 “main - clusters” discussed with the Steering Committee

The potential (2) Results from indicator assessment: 47 “masters” 171 with “high” potential 42 with “limited” potential 8 “unknown” (in-sufficient information) 89 “no” potential

► ► ► ► ► ► ► ► Starting the process Set of general guidelines for practical implementation: streamlining options and recommendations for further work = 6 slides Distribution of responsibilities within the Go4 and their data centres = 2 more slides ► ► ► ► ► ► ► ►

Streamlining options Where more or less the same indicators are being created, but from a different data source, the project recommends choosing the same data source for these indicators. … but: not always possible (some sources are deliberately chosen). indicators using more recent or better data sources may be preferred.

Streamlining options (2) Where the same data sources are being used, a division of tasks for the calculation of the indicators could be made between data centres. this may then create a situation where organisation Y and Z are depending on the indicators being produced by organisation X. This will introduce criteria for the production of the indicators, such as: Quality criteria Timeliness criteria Commitment - competence

Streamlining options (3) More difficulties can be expected in the streamlining process for those indicators that are composed from various data sources. Difficult to solve will be those indicators which are composed of data sources which are not under competence of any of the data centres.

Streamlining options (4) More recommendations Develop a naming convention and/or a unique codification system; Apply identical metadata to indicators with an identical code; Develop specific metadata for the presentation of the indicator; For purpose of ease, quality and transparency, make metadata and flow-charts for all indicators accessible through ONE source; A flow-chart approach, a generalised and generic chain of events (e.g. raw data collection - data management (data improvement) and processing (modelling, weighting, aggregating) - indicator creation - assessment - presentation) could be elaborated to provide all possible elements that need to be present.

Streamlining options (5) More recommendations, cont. Set up permanent indicator quality team within (and between) the indicator producers, with sufficient allocated time, and a permanent budget. Procedures for making changes in existing indicators need to be elaborated and ratified. Quality management requires that decisions envisaged need to be discussed by the indicator quality team(s), and decisions made and implemented need to be documented properly in the ‘revision history log’; Procedures need to be set up to deal with quality assurance and transparency issues beyond the scope of the data centres (third-party data quality, documentation, decision making, etc.); Given the very high number of indicators potentially streamlineable, the follow-up work should be prioritised.

Responsibilities Discussion on ownership

Responsibilities (2) Discussion on ownership: example AEI.21 Soil erosion

Outcome of workshop, agreed steps Project has delivered insight on main EU environmental indicator sets (covering > 300 indicators) Methodology was accepted, but needs to be fine-tuned Priority setting required, set up a matrix for planning of work Design a coding/naming system for better communication Each “cluster” will be allocated to a DC for organisation of further work Flow-chart approach to be further investigated

Outcome of workshop, agreed steps (2) Composition of Steering Committee will remain, results will be made available to EIONET (NFP meetings) and the ESS (DIMESA) Commitment by all Go4 partners is crucial – and was confirmed, Eurostat remains committed to lead the process Sufficient allocation of human resources and budget is crucial as well The objective to establish an “Indicator Clearing House” for existing and “to-be-developed” indicators will be followed There are some “low-hanging-fruits” (e.g. municipal waste), but a lot is still to be done …

Further reading: Final report and workshop minutes are on CIRCA: http://circa.europa.eu/Public/irc/dsis/pip/library?l=/streamlining_environment/ For further questions: Christian.Heidorn@ec.europa.eu ► ► ► ► Some illustrative examples?

Municipal waste: Eurostat >>> SDI

Municipal waste: Eurostat

Municipal waste: Eurostat >>> SI

Municipal waste: EEA >>> CSI

Municipal waste: OECD >>> KEI

Municipal waste: UN >>> EI