CONCURRENT FEEDBACK SESSION OP 9 PROJECTS n Facilitator : Philip Weller n NGO : Ger Bergkamp n Rapporteur : Maryam Niamir-Fuller.

Slides:



Advertisements
Similar presentations
Consultation Process Towards the Post-2015 Framework on Disaster Risk Reduction Youcef Ait Chellouche UNISDR AFRICA.
Advertisements

A Guide to Localizing the Hyogo Framework for Action
WCDR Thematic Panel Governance: Institutional and Policy Frameworks for Risk Reduction Annotated Outline UNDP – UNV – ProVention Consortium – UN-Habitat.
ClimDev-Africa Program & African Climate Policy Center (ACPC)
UNCTAD Technical Assistance and Capacity Building in Trade Facilitation WTO, NGTF, 1 July 2009.
Good governance for water, sanitation and hygiene services
Planning and Timely Implementation of Structural Funds Interventions Katarína Mathernová Director, DG Regional Policy European Commission 24 November 2005.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
URUGUAY’s efforts to address synergies among the Conventions Workshop on synergies and cooperation with other conventions 2-4 July 2003 Espoo, Finland.
Water Integrity Capacity Building Programme: Outcomes and lessons learned from SADC regions SIWI WGF & CapNet UNDP 29 May A3.
GEF NATIONAL COORDINATION MECHANISMS: STRATEGIES FOR PRIORITY SETTING AND IMPROVING THE COMMUNICATION SYSTEM AND RESULTS IN THE FIELD CAMEROON’S EXPERIENCE.
Progress Toward Impact Overall Performance Study of the GEF Aaron Zazueta GEF Evaluation Office Hanoi, March 10, 2010.
Global Environment Facility GEF approach to synergistic action on global environment issues Espoo, Finland, July 2 – 3, 2003.
Summary Report of CSO Meeting GEF Expanded Constituency Workshop (ECW), Southern Africa 15 th July 2013 Livingstone, Zambia (
GEF Policies and Processes in GEF 4 Sub-regional Workshop for GEF Focal Points Europe and the CIS 7-8 March 2007, Istanbul.
Integrating Environment into Development Policy: The World Bank’s Experience with Country Environmental Analysis Sub-Regional Workshop for GEF Focal Points.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
Cross Border Animal Health Plan of Action – Kenya and Uganda Four Strategic areas 1. To improve prevention, management and control of cross border animal.
GEF COUNTRY PARTNERSHIP FOR SUSTAINABLE LAND MANAGEMENT WALTER LUSIGI GLOBAL ENVIRONMENTAL FACILITY.
Fifth Overall Performance Study (OPS5).  Objective  Analytical framework  Key issues to be covered  OPS5 audience  Organizational issues  Group.
Europe & CIS Subregional Workshop: 7-8 March 2007, Istanbul, Turkey Enhancing National GEF Coordination, Communications and Outreach (Session 6): The Bulgarian.
1 Capacity Building: Strategy and Action Plan GEF-UNDP Strategic Partnership Capacity Development Initiative.
The GEF/UNDP/UNEP National Communications Support Programme United Nations Development Programme UNFCCC Workshop on the Preparation of National Communications.
High-level forum on strategic planning for statistics: Bishkek, May 2006 Why statistics? Why strategic planning? Presentation by PARIS21 Secretariat.
Evaluation in the GEF and Training Module on Terminal Evaluations
GHANA Developing CSA within the National Agriculture Sector Investment Plan while reinforcing inter-sectoral consistency: progress, bottlenecks and support.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Financing for National Communications UNFCCC Workshop, Manila Ravi Sharma United Nations Environment Programme – Global Environment Facility.
BRIEFING SEQUENCE a) MEA FOCAL POINT AGENCIES b) COMMITTEES CREATED FOR THE THREE UN CONVENTIONS c)COMPOSITION OF MEA FOCAL POINT AGENCY COMMITTEE AND.
The GEF/UNDP/UNEP National Communications Programme for Climate Change United Nations Development Programme UNFCCC Workshop on the Preparation of National.
Ministerul Mediului si Gospodaririi Apelor Session 6 - Enhancing National GEF Coordination, Communication and Outreach Developing the National Capacity.
Organization of American States’ Inter-American Biodiversity Information Network (IABIN) REEfFix programme Workshop Coastal and Marine Activities done.
Lessons from Programme Evaluation in Romania First Annual Conference on Evaluation Bucharest 18 February 2008.
Integrating GEF in Environment and Sustainable Development Plans and Policies - – Jamaica’s Experience GEF CSP Sub-regional Workshop for Caribbean Focal.
Strategic Programmatic Approach Sub-Regional Workshop for GEF Focal Points East and South Africa June 2008, Windhoek, Namibia.
CAPACITY DEVELOPMENT FOR POLICY MAKERS TO ADDRESS CLIMATE CHANGE: Lessons learned from Ecuador Carola A. Borja, Undersecretary of Climate Change Ministry.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
Tools to Support GEF National Focal Points Sub-regional Workshop for GEF Focal Points in Asia May 2008, Manila.
The World Bank’s Experience with Country Environmental Analysis (CEA) Sub-Regional Workshop for GEF Focal Points Europe and the CIS 7-8 March 2007, Istanbul.
1 First Meeting of Technical Advisory Group and International Steering Committee meeting of LADA, PDF-B First Meeting of Technical Advisory Group and International.
Environmental Protection and Sustainable Development of the Guarani Aquifer System Project -Argentina, Brazil, Paraguay, Uruguay / GEF, WB, OAS- Notes.
Innovative and effective approaches to climate change: Experiences from the Global Climate Change Alliance Brussels 12 th -14 th September 2012 Thematic.
Kathy Corbiere Service Delivery and Performance Commission
GEF-Assisted Integrated Ecosystem Management Project In The Trans- Boundary Areas Between Nigeria and Niger Republic.
BRIEFING SEQUENCE a) MEA FOCAL POINT AGENCIES b) COMMITTEES CREATED FOR THE THREE UN CONVENTIONS c)COMPOSITION OF MEA FOCAL POINT AGENCY COMMITTEE AND.
Addressing adaptation under the Convention in a coherent manner Presentation by Juan Hoffmaister Co-Chair, Adaptation Committee.
FAO Turkey Partnership Programme (FTPP) FAO Final Evaluation of the FTPP Summary for FTPP Programming Meeting, 14 December
Tools to Support GEF National Focal Points Sub-Regional Workshop for GEF Focal Points West and Central Africa June 2008, Douala, Cameroon.
Managing the National Communications Process UNFCCC Workshop on Exchange of Experiences and Good Practices among NAI Countries in Preparing NCs September.
Tools to Support GEF National Focal Points Sub-regional Workshop for GEF Focal Points Europe & CIS 1-2 April 2008, Belgrade.
IPCC Key challenges facing communities, and approaches to solutions that enhance resilience: through NAPs Climate and Health Summit 2014 Investing.
Introduction to the NAP process & the NAP Expo NAP-Expo 8– 9 August 2014, Bonn, Germany LEG Thinley Namgyel.
GEF Third Biennial International Waters Conference Salvador, Bahia Brazil June 20-25, 2005 Thematic Breakout Session II: M&E Results: Programme Study Recommendations.
Strategic Partnership for the Mediterranean Sea Large Marine Ecosystem Paul Mifsud UNEP/MAP Coordinator GEF 3 rd IWC - UNEP Session 24 th June, 2005.
Evaluation Capacity Building at Country Level: GEF Focal Points 1 Osvaldo Néstor Feinstein AEA 2011 Conference GEF Evaluation Office Panel.
PARIS21 workshop, Accra, July 2005 Meeting the data challenge: National Strategies for the Development of Statistics (NSDSs) Frances Harper PARIS21.
UN Support to SDG implementation in Seychelles.
Advancing South-South Cooperation for Effective Implementation of
Breakout sessions Outcome.
Magda Tóth Nagy Public Participation Program
Evaluation in the GEF and Training Module on Terminal Evaluations
Knowledge & Learning for the GEF Partnership
Purpose of the Workshop
UNDMTP Presentation, Session V: Early Warning Symposium 24 May 2006
MONITORING AND EVALUATION IN THE GEF
MONITORING AND EVALUATION IN THE GEF
MONITORING AND EVALUATION IN THE GEF
Presentation transcript:

CONCURRENT FEEDBACK SESSION OP 9 PROJECTS n Facilitator : Philip Weller n NGO : Ger Bergkamp n Rapporteur : Maryam Niamir-Fuller

PROCEDURAL ISSUES: TDA and SAP n importance of participatory process – OP 9 requires even more participatory work than other OPs ; we need to develop real bottom-up processes that match upstream planning n Is TDA to SAP a good approach ? – in some cases it has not built upon existing or previous efforts (e.g. West Africa) and local knowledge and in other cases does not link or coincide with ongoing national planning frameworks – there is no process for M&E while doing SAP

TDA and SAP cont. n Posting best practices examples for TDA, SAP and Integrated Land and Water Management on the websites n Regional SAP has to be supported by National SAPs n Recommend organizing another special session/occasion to discuss further the value of the TDA-to-SAP approach

PROCEDURAL: Communication n Effective communications strategy needed between project and all stakeholders – communication gap between local stakeholders and IA HQ and GEF n Best practices should be used in a timely manner, and should be disseminated between projects through exchanges. n Thematic mapping very useful tool, to determine hot spots, and use for dialogue and decision- making

PROCEDURAL: Development n rigidity of procedures – final Brief may not address real needs, because it is modified too much by GEFSEC and other reviews n Greater coordination of GEF projects with other ongoing or pipeline IA projects n Difficult to know what is coming down the pipeline; may result in duplication.

PROCEDURAL: Endorsements may take a long time some IAs require too many signatures for the same project; need to standardize process early involvement of OFP needed

PROCEDURAL: Financial continuity n Funding stream from project development to implementation must be continuous

TECHNICAL: Sustainability n Ownership and sustainability – must get inter-sectoral coordination and buy-in early in project development; not just land and water sectors, but also finance, foreign, etc. – OP 9 projects engage both development and environmental issues – projects must be driven by regional and national priorities and have their genesis in the region

Sustainability cont. n need for capacity and institutional building before project start-up n Not enough work on building capacity during project lifetime (local community, counterparts) n Projects should be managed as much as possible by national and regional staff

OTHER TECHNICAL ISSUES n OP 9 projects are more holistic than others (biod, desertification, etc.) which is positive but it may be hard to find focus for the project, and what GEF increment should be, so we need good system boundary assessments. n Projects cannot only address technical needs, but also must be aware of political processes

Other Technical Issues cont. n Need better clarity and distinction between OP 8, 9, 2 and 12

Lessons Learnt and M&E n Research must address project needs n Need more IA coordination, for lessons learnt n M&E systems have to be transparent, where countries report on processes and results; TPRs may not be best venue. n M&E has to cover post-project reviews.

SUMMARY/RECOMMENDATIONS n Put TDA and SAP best practices examples on the websites n Review TDA and SAP approach n Careful definition and assessment of system boundary needed in OP 9 projects n Multi-sectoral coordination needed early on n Participatory process must be structured, systematic, and an integral part of the planning process.