Round Trip Phase Measurement System

Slides:



Advertisements
Similar presentations
S.Durand / T.Baldwin1 Fiber Installation Preliminary Design Review December 5, 2001.
Advertisements

CARMA Fiber Plan Ed Fields Dick Plambeck 09 Sep 2004.
PHYS16 – Lecture 26 Ch. 12 Static Equilibrium. Static Equil. Pre-question If ball 2 has twice the mass of ball 1 and the system is in static equilibrium.
Author George Peck EVLA Hardware Monitor and Control PDR March 13, APPLICATIONS AND DEVICE INTERFACE ISSUES.
DESY MHF-p 1 Layout of the Synchronisation System for the VUV-FEL Dipl. Ing. Henning Christof Weddig DESY Hamburg.
Fiber Bragg Gratings.
Warm UP. Essential Question How can I solve for side lengths of a right triangle and how can you use side lengths to determine whether a triangle is acute,
The Pythagorean Theorem. The Right Triangle A right triangle is a triangle that contains one right angle. A right angle is 90 o Right Angle.
SJD/JJAdvisory - Sept Fiber Phase Stability Status Steven Durand & Jim Jackson September 8, 2003 National Radio Astronomy Observatory a facility.
Timing calibration using WR P.Kooijman. Fibre network Had a PRR of the network Comments reasonably positive Complicated system Build a full testbench.
Two Minute Drill #8 Copyright 2005 Ted "Smitty" Smith Practice Code Look Up.
ANATAC Meeting Line Length Correction Status 2004-Apr-23.
The Pythagorean Theorem
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
E.Guschin (INR,Moscow) 14 February 2007Calorimeter commissioning meeting, CERN Digital camera with LED monitoring Status: Photographs of SPD are completed.
Chapter 3 – Solving Linear Equations
Find the equation of the line that has... A B C D E F
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
Leon Abeyta LO-IF Engineer EVLA LO-IF PDR 22 January EVLA LO/IF Central and Antenna Reference Generation.
Section 1.2 Gaussian Elimination. REDUCED ROW-ECHELON FORM 1.If a row does not consist of all zeros, the first nonzero number must be a 1 (called a leading.
Kinematics in One Dimension
What can we see in the sky?. IN THE SKY WE CAN SEE MUCH MORE!
Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission Roshene McCool Simon Garrington University of Manchester.
Travis Newton LO-IF Engineer EVLA LO/IF PDR January IF Downconverter Travis Newton LO/IF Engineer.
Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, EVLA Front-End CDR On the Sky Tests.
Science 10 – Introduction Welcome Back !! Mrs. Leinweber Rm 107 Fall 2015.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
AGENDA LOGIC PUZZLE LESSON 83 CORRECTIONS? WARM-UP L84 QUESTIONS LESSON 85 EXIT CARD.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
David Urner Oxford University/JAI
Emittance Dilution and Preservation in the ILC RTML
Algebra 1Predicting Patterns & Examining Experiments
Temperature: Comparing degrees Celsius (C) and degrees Fahrenheit (F)
Fiber Installation Preliminary Design Review
EVLA Advisory Committee Meeting System Status
Terry Cotter LO/IF Group Leader
Water Vapor Radiometer
Terry Cotter LO/IF Group Leader
LO/IF Switches Doug Scott
LO/IF System Requirements
Find the linearization L(x, y) of the function at the given point
EVLA LO/IF Racks/Bin/Modules
EVLA System PDR System Overview
EVLA M/C Software PDR, 14 May 2002
EVLA Advisory Committee Meeting
EVLA MONITOR & CONTROL CDR
Terry Cotter LO/IF Group Leader
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
Terry Cotter LO/IF Group Leader
Milestones Review Click to begin..
The Pythagorean Theorem
Background Information P.Napier
Erosion Virtual Lab Predictions (right side)
One Point Perspective.
EVLA Racks Bins and Modules PDR
1.5: Velocity-time graphs
LCLS Injector Laser System Paul R. Bolton, SLAC April 24, 2002
Geometric Mean Proportions & Pythagorean Theorem
For vectors {image} , find u + v. Select the correct answer:
Chapter 2 Section 7 Two-Variable Inequalities
What are we going to do at the field trip?
Physics Requirements for Conventional Facilities
EVLA Technical Performance
More about Absolute Value Functions
100W Fiber Collimator PRODUCT BRIEF Advantages Overview
Presentation transcript:

Round Trip Phase Measurement System Terry Cotter 12/2/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

Requirements IF Phase Stability Requirements Short Term <.5ps rms for times <1s Long Term <6ps linear slope over 30min IF Phase shift with pointing change <.7ps across whole sky <.07ps per degree of slew * specs apply after any RTP correction 12/2/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

Considerations Fiber cable wrap Temperature effects on fiber Needs to twist fiber not stretch it Temperature effects on fiber burial depth insulating/temperature stabilizing exposed fiber Laser/electronics stability Dispersion in the Fiber 12/2/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

Temperature Considerations From EVLA Memo 10 Based on Duhamel’s theorem 12/2/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

Temperature Considerations Bottom line: For just the part buried @1m Long term stability is .4 ps/s which meets the spec of 1.4 ps/s Short term stability is .0002 ps/s which far exceeds the spec of .5 ps/s 12/2/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

Temperature Considerations Do we really needs Round Trip Phase Correction? YES Long term stability is near Spec Short term above ground and in the building Good monitor of system problems 12/2/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

Other Considerations Laser Stability Dispersion in the fiber Unknown as to how much of a problem this is going to be Dispersion in the fiber Will need to operate RTP system near zero dispersion point of the fiber ~1310nm 12/2/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

12/2/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002

Side Note Two master rack are required, one for back up Round trip phase equipment can be used to monitor the master racks together. 12/2/2018 Terry Cotter EVLA LO/IF PDR 22-23 January 2002