Port of Durban Role of the port

Slides:



Advertisements
Similar presentations
Container Ship Construction
Advertisements

Development of the port of Poti by strategic investor in the post-crisis world by Andrii Kuzmenko Poti Sea Port Corp. – an APM Terminals company.
Complex processing industries --- Iron & Steel industries.
Slide 1 1 The Port of Melbourne - delivering a safe, secure and sustainable port’ Transport Colloquium 18 th -19 th June 2008 Steven Sullivan General Manager.
The Integrated Transport and Land Use Plan and Regional Mining and Infrastructure Planning Project Rod Hook Chief Executive Department of Planning, Transport.
13 June 2007 Securing the lifeblood of the NSW economy Presentation to the BTRE Transport Colloquium Presentation by Greg Martin Chief Executive Sydney.
KEY DEVELOPMENTS AND VISION FOR THE SECTOR IN THE KZN AUTO HUB ANDREW VELLEMAN Chairman Durban Automotive Cluster.
World Bank Port Reform Toolkit Module 2 The Evolution of Ports in a Competitive World.
Mission Promoting the development and growth of maritime shipping via the kingdom's national port of Aqaba through; mobilizing business skills and concepts.
The Challenges of Freight Distribution in the New York Metropolitan Area: The Role of the Port Authority Dr. Jean-Paul Rodrigue Dept. of Economics & Geography.
Tomislav Skračić, MA Undergraduate English Course for MARITIME MANAGERS 6th Semester Essential reading: T. Skračić, Waypoint – English Textbook for Maritime.
Port Financial Management Challenges Financing Freight Transportation Improvements St. Louis, Missouri April 29 to May 2, 2001 Financing Freight Transportation.
THE 1 ST EASTERN AND SOUTHERN AFRICA PORTS ENVIRONMENTAL MANAGERS WORKING CONFERENCE PORT SUSTAINABILITY AND ENVIRONMENTAL CHALLENGES (A South African.
Preparing for Post-Panamax Commodity Flows: Restructuring on Kentucky Waterways Tim Brock Research Associate Kentucky Transportation Center Smart Rivers.
Port Everglades Master / Vision Plan Status Broward County Board of County Commissioners May 4 th, 2010.
High Level Cost Estimates Socio Economic Benefits
ALEXANDRIA PORT AUTHORITY. Location Of Alexandria Port Main International Trade Route Alexandria Port.
EXECUTIVE RETREAT COM-FSM JUNE Pohnpei Port Authority Pohnpei Port Authority.
Challenges Facing Ports Today Containership capacities and containership fleet continues to expand Global economic development leading to growing world.
SHIP REPAIR, VESSEL CONSTRUCTION & BOAT BUILDING IN DURBAN HARBOUR AUGUST 2010 SUMMIT PRESENTATION BY KEN FROISE 1.Introduction 2.Transnet / Ethekwini.
Regional Resource / Global Gateway Colin Parker, Chief Executive | 27 August 2008.
Contemporary Issues in Port Development An International Context Yaringa Boat Harbour 16 th January 2014.
Transnet: Progress report Select Committee on Labour and Public Enterprises Parliament 21 June 2006.
Freight and Logistics Council of WA 25 June
CenterPoint Intermodal Center (CIC) Largest master-planned inland port in North America. Situated on ~6500 acres just 40 +/-miles southwest of downtown.
Port of Port Elizabeth “Investing in the Future” EC Construction Summit 26 March 2015.
1PAGE Outline of the presentation Transnet organisational structure Business overview of TNPA Major investment and infrastructure plan Major investment.
International Logistics Centres for Western NIS and the Caucasus Georgia: Areas in the vicinity of Tbilisi airport Ministry of Economy and Sustainable.
Overview of the Port of Durban MARITIME SUMMIT 26 th October 2011 Selvan Pillay.
Sea Change? The role of transformational infrastructure – a case study and observations 27June 2014 Dave Trimingham.
“Challenges in Transport Corridors Infrastructure (Rail and Road) for the Southern African Region” Johny M. Smith CEO – WBCG November 2011.
Design Aducation Forum for Africa Conference, Pretoria, June 2004 How design links with NEPAD strategies and requirements The air transport infrastructure.
Grade 8 term 4.  Scarcity of resources  Surplus : having more than required ie Middle East has plenty of oil, but not enough agricultural industry.
Djibouti Ports – DP World Jérôme Martins Oliveira
1 AASHTO 2011 Annual Meeting Joe Cappel, Director of Cargo Development October 13, 2011 Maritime Transportation- State, Regional, National and Regional.
Port Authority of Guam PB International PORT EXPANSION PLAN.
Internship Presentation by: Silvan van Heel Makassar International Hub Port Silvan van Heel PT. Pelindo IV, Makassar.
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
Port of Black Sea Regional Conference 31 st October 2007 CONSTANTIN MATEI GENERAL MANAGER National Company “Maritime Ports Administration”
Port of Everett MASTER PLAN UPDATE April 8, 2008.
Infrastructure and Shipping in Taiwan
TNPA INFRASTRUCTURE.
Transport Geography Chapter 4 – Transportation Terminals Concepts Copyright © , Jean-Paul Rodrigue, Dept. of Economics & Geography, Hofstra University,
Prof.V.M.Mohamed Ali.  Is a facility where cargo containers are transhipped.  The transshipment may be between container ships and land vehicles. 
Port of Cape Town Development Plans
Transnet’s Railway Infrastructure Development
North Georgia Water Resources Partnership
B2N Cape Town 15 August 2016.
Dr. Christos Solomonidis Civil – Harbour Engineer Managing Director
PORT BULGARIA WEST.
PORTFOLIO COMMITTEE ON ENVIRONMENTAL AFFAIRS OCEAN ECONOMY:
DUBE TRADEPORT OVERVIEW
The eThekwini Metropolitan Region Durban - Pinetown
“efficient movement of goods across the entire state of Oregon”
National Infrastructure Plan
Port of Durban: Medium Term Layout
Fishermans Bend Draft Framework Transport Recommendations
Cargo Solutions for Palma, Mozambique.
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
Investment opportunities in Italy
TGC REPORT FOR TRANSNET FINCO
Djibouti Ports – DP WorldPresented By Jérôme Martins Oliveira CHIEF EXECUTIVE OFFICER.
PORT OF DURBAN google. co. za/search
The port of east london The port of rotterdam.
B2N Cape Town 15 August 2016.
Port of Cape Town Development Plans
POrt AND TERMINAL Durban port shipping and logistics
Port of Muscatine Planning and Feasibility study
Presentation transcript:

TRANSNET NATIONAL PORTS AUTHORITY Port Development Framework Plans PORT OF DURBAN October 2012

Port of Durban Role of the port Durban is South Africa’s premier container port, and the principle port serving KZN and the Gauteng region as well as the Southern African hinterland. Major growth areas for the port are seen to be in containers, vehicles and bulk liquid handling. Although Durban is a mature port, with increasingly congested operations, there is potential to expand through the reconfiguration of existing precincts in the Point, Maydon Wharf and in Island View. The underutilised Bayhead rail precinct is ideally suited to a major port expansion, and the relocation of the Durban Airport to La Mercy has provided an opportunity for Transnet to secure the unique airport site for a new dig-out port. The complementary regional grouping of Durban and Richards Bay allows the rational allocation of cargo between the two ports, with Richards Bay focussing on bulk and break bulk operations. Durban will continue to provide a wide range of port infrastructure, operations and services, and with its well established logistics infrastructure and supportive local industrial base will continue to be the port of choice for high value Gauteng and inland cargoes. 2

Port of Durban: Current Layout The entrance channel to the port has been widened and deepened, to allow safer navigation for vessels up to 9200 TEU. There is a current study in progress to address berth deepening in the Bay. This will recommend a sequence for deepening berths and channels to take advantage of the ability of the port to handle larger vessels resulting from the channel deepening. There are ten container berths at DCT and Pier 1, and three car terminal berths in the Point. There are fourteen break bulk berths in the Point, T-Jetty and Maydon Wharf. N-berth is currently used for cruise liners. There are nine liquid bulk and seven dry bulk berths at Island View and Maydon Wharf. Berth depths at Durban range from the deepest berths at DCT, Pier 1, Point and Island View at -12,8m, to -9,9m in Maydon Wharf. Ship repair berths, floating docks and the drydock are situated in Bayhead. The small craft basin provides berthing for tugs and admin craft on the Victoria Embankment water front, which is also the site for the yacht mole and Wilson’s Wharf marinas. Fishing and recreational vessels berth in the Silt Channel. The proposed dig-out port on the airport site will provide more than twenty new deepwater berths, for container, vehicle and liquid bulk operations. The new port will require its own entrance channel and breakwaters, and a new turning basin and basin. A major long term challenge will be to provide a deep water channel to access new berths in the Bayhead dig-out basin. This will face environmental resistance due to the inevitable loss of inter-tidal sandbanks. Short term layout The re-engineering project at DCT is nearing completion. This is concerned with the rationalisation of the landside of the terminal, which will increase stacking areas and improve operational efficiencies. The deepening of the North Quay at Pier 2 will provide the first deep water container berths in Durban, with new twin lift STS cranes. The Pier 1 phase 2 container terminal expansion project includes the purchase of a portion of Salisbury Island, and the development of an additional 1,4m teu of capacity which will result from the expanded landside operational area and new deep berths. The project must be preceded by the rationalisation of the SA Navy base onto a smaller footprint. Container capacity at the Point and Maydon Wharf MPTs will be increased to handle overflow volumes from DCT during deepening. A feasibility study for the development of a cruise liner terminal and associated commercial development at A-B berths in the Point is proceeding. The construction of the Coastal Terminal and pipeline for the NMPP is in progress in Island View, where the ongoing program of berth reconstruction is continuing. The reconstruction of the Maydon Wharf berths is also planned to begin in the near future. Current road improvements include the widening of Bayhead Road from Langeberg Road, and preliminary work is proceeding on the dedicated freight routes. Point MPT and Ro Ro Terminal 2. Maydon Wharf 3. Bayhead rail yards 4. Durban Containers Pier 1 and Pier 2 5. Island View liquid bulk precinct 6. Bluff 3

Port of Durban: Short Term Layout Current layout: The entrance channel to the port has been widened and deepened, to allow safer navigation for vessels up to 9200 TEU. There is a current study in progress to address berth deepening in the Bay. This will recommend a sequence for deepening berths and channels to take advantage of the ability of the port to handle larger vessels resulting from the channel deepening. There are ten container berths at DCT and Pier 1, and three car terminal berths in the Point. There are fourteen break bulk berths in the Point, T-Jetty and Maydon Wharf. N-berth is currently used for cruise liners. There are nine liquid bulk and seven dry bulk berths at Island View and Maydon Wharf. Berth depths at Durban range from the deepest berths at DCT, Pier 1, Point and Island View at -12,8m, to -9,9m in Maydon Wharf. Ship repair berths, floating docks and the drydock are situated in Bayhead. The small craft basin provides berthing for tugs and admin craft on the Victoria Embankment water front, which is also the site for the yacht mole and Wilson’s Wharf marinas. Fishing and recreational vessels berth in the Silt Channel. The proposed dig-out port on the airport site will provide more than twenty new deepwater berths, for container, vehicle and liquid bulk operations. The new port will require its own entrance channel and breakwaters, and a new turning basin and basin. A major long term challenge will be to provide a deep water channel to access new berths in the Bayhead dig-out basin. This will face environmental resistance due to the inevitable loss of inter-tidal sandbanks. Short term layout The re-engineering project at DCT is nearing completion. This is concerned with the rationalisation of the landside of the terminal, which will increase stacking areas and improve operational efficiencies. The deepening of the North Quay at Pier 2 will provide the first deep water container berths in Durban, with new twin lift STS cranes. The Pier 1 phase 2 container terminal expansion project includes the purchase of a portion of Salisbury Island, and the development of an additional 1,4m teu of capacity which will result from the expanded landside operational area and new deep berths. The project must be preceded by the rationalisation of the SA Navy base onto a smaller footprint. Container capacity at the Point and Maydon Wharf MPTs will be increased to handle overflow volumes from DCT during deepening. A feasibility study for the development of a cruise liner terminal and associated commercial development at A-B berths in the Point is proceeding. The construction of the Coastal Terminal and pipeline for the NMPP is in progress in Island View, where the ongoing program of berth reconstruction is continuing. The reconstruction of the Maydon Wharf berths is also planned to begin in the near future. Current road improvements include the widening of Bayhead Road from Langeberg Road, and preliminary work is proceeding on the dedicated freight routes. 1. North quay berth deepening 2. Pier 1 expansion with Salisbury Island infill 3. Maydon Wharf quaywall reconstruction 4. Island View berth reconstruction 5. Point Passenger Terminal 4

Port of Durban: Medium Term Layput MEDIUM TERM LAYOUT In the medium term, the planning for the development of the port will be dominated by the airport site expansion. The 2020 future layout plan shows the fully developed dig-out port, with a new port entrance with breakwaters and entrance channel, leading to an inner basin with turning basin. This allows for sixteen new container berths, four liquid bulk berths, and three car terminal berths, with their respective back-of-quay operational areas, and road and rail connections. The development of the new port will allow for the reorganisation of port operations and activities across the two port locations. This has the potential to result in the transformation of the Southern Industrial Basin as a whole, and address issues of traffic congestion and incompatible land uses. It will catalyse urban renewal programs for the area, and result in more appropriate port-city interfaces. The freight handling operations of the ports will benefit from better relationships with their industrial bases, and from better inland transport connectivity. LONG TERM LAYOUT The long term potential plan for Durban shows a fully developed port within the spatial limitations of the Bay. Before the Bayhead basin can be built, the existing rail arrival and departure yards and other rail infrastructure will need to be relocated, and the rail lines linking the port to the main line realigned. The Bayhead road access to the southern port will be truncated by the new basin, necessitating new access roads on the southern perimeter. A large number of tenants will need to be relocated, and the ship build and repair sites will need consolidation. The Bayhead project will thus require a long lead time, and an extensive program of relocation and rationalisation of existing port, rail, road and commercial infrastructure. The plan shows the Bayhead dig-out basin with a ten berth container terminal, with a capacity of 6,0m teu. The Transnet Rail Engineering facilities have been retained, and a portion of Ambrose Park and the eastern side of the Bayhead rail yards converted into commercial and logistics areas. Ship repair facilities are retained, but on a smaller scale. The plan also shows the widened and deepened access channel and new turning basin, and an expanded area allocated to the heritage site. Although these are not illustrated on the plan, the Bayhead development will be undertaken in association with major rail and road relocations and capacity expansions. The medium term expansion of the Port of Durban will be focussed on the new dig-out port on the old Durban airport site. Breakwater and entrance channel 2. 16 berth container basin and terminals 3. New automotive terminal 4. Liquid bulk berths and terminal 5. Road and rail connectivity 5

Port of Durban: Long Term Layout MEDIUM TERM LAYOUT In the medium term, the planning for the development of the port will be dominated by the airport site expansion. The 2020 future layout plan shows the fully developed dig-out port, with a new port entrance with breakwaters and entrance channel, leading to an inner basin with turning basin. This allows for sixteen new container berths, four liquid bulk berths, and three car terminal berths, with their respective back-of-quay operational areas, and road and rail connections. The development of the new port will allow for the reorganisation of port operations and activities across the two port locations. This has the potential to result in the transformation of the Southern Industrial Basin as a whole, and address issues of traffic congestion and incompatible land uses. It will catalyse urban renewal programs for the area, and result in more appropriate port-city interfaces. The freight handling operations of the ports will benefit from better relationships with their industrial bases, and from better inland transport connectivity. LONG TERM LAYOUT The long term potential plan for Durban shows a fully developed port within the spatial limitations of the Bay. Before the Bayhead basin can be built, the existing rail arrival and departure yards and other rail infrastructure will need to be relocated, and the rail lines linking the port to the main line realigned. The Bayhead road access to the southern port will be truncated by the new basin, necessitating new access roads on the southern perimeter. A large number of tenants will need to be relocated, and the ship build and repair sites will need consolidation. The Bayhead project will thus require a long lead time, and an extensive program of relocation and rationalisation of existing port, rail, road and commercial infrastructure. The plan shows the Bayhead dig-out basin with a ten berth container terminal, with a capacity of 6,0m teu. The Transnet Rail Engineering facilities have been retained, and a portion of Ambrose Park and the eastern side of the Bayhead rail yards converted into commercial and logistics areas. Ship repair facilities are retained, but on a smaller scale. The plan also shows the widened and deepened access channel and new turning basin, and an expanded area allocated to the heritage site. Although these are not illustrated on the plan, the Bayhead development will be undertaken in association with major rail and road relocations and capacity expansions. In the longer term, expansion could take place in the Bay once sustainability matters have been addressed. Bayhead dig-out basin, with ten container berths and new terminals Reconfiguration of Durban Container Terminals with infill and new operating methods 6

Durban Old DIA Site – Aerial Photo

Digout Port: Medium Term Layout In the medium term, the planning for the development of the port will be dominated by the airport site expansion. The 2020 future layout plan shows the fully developed dig-out port, with a new port entrance with breakwaters and entrance channel, leading to an inner basin with turning basin. This allows for sixteen new container berths, four liquid bulk berths, and three car terminal berths, with their respective back-of-quay operational areas, and road and rail connections. The development of the new port will allow for the reorganisation of port operations and activities across the two port locations. This has the potential to result in the transformation of the Southern Industrial Basin as a whole, and address issues of traffic congestion and incompatible land uses. It will catalyse urban renewal programs for the area, and result in more appropriate port-city interfaces. The freight handling operations of the ports will benefit from better relationships with their industrial bases, and from better inland transport connectivity. LONG TERM LAYOUT The long term potential plan for Durban shows a fully developed port within the spatial limitations of the Bay. Before the Bayhead basin can be built, the existing rail arrival and departure yards and other rail infrastructure will need to be relocated, and the rail lines linking the port to the main line realigned. The Bayhead road access to the southern port will be truncated by the new basin, necessitating new access roads on the southern perimeter. A large number of tenants will need to be relocated, and the ship build and repair sites will need consolidation. The Bayhead project will thus require a long lead time, and an extensive program of relocation and rationalisation of existing port, rail, road and commercial infrastructure. The plan shows the Bayhead dig-out basin with a ten berth container terminal, with a capacity of 6,0m teu. The Transnet Rail Engineering facilities have been retained, and a portion of Ambrose Park and the eastern side of the Bayhead rail yards converted into commercial and logistics areas. Ship repair facilities are retained, but on a smaller scale. The plan also shows the widened and deepened access channel and new turning basin, and an expanded area allocated to the heritage site. Although these are not illustrated on the plan, the Bayhead development will be undertaken in association with major rail and road relocations and capacity expansions. The medium term expansion of the Port of Durban will be focussed on the new dig-out port on the old Durban airport site. Breakwater and entrance channel 4. Liquid bulk berths and terminal 16 berth container basin and terminals 5. Road and rail connectivity New automotive terminal 8

Airport Site Dig-out Port Arial view of the proposed dig-out port Arial view of the current site Airport site dig-out port: current and future views Currents site layout Aerial photograph of the vacated DIA site. The existing Port of Durban can be seen some 20 km distant, at the top left of the photograph. The site is bordered by the Umlaas Canal, the SAPREF refinery, the Prospecton industrial area, with the Toyota factory, and by the N2 freeway in the foreground. The land assembly for the project requires the acquisition of 750 ha of ACSA, Municipality, government and private land. Full development of the new port The artist’s impression shows the fully developed port, including: Container terminals with 16 berths capable of handling 18 000 TEU vessels. Four berth Automotive terminal adjacent the Prospecton auto industries. Four berth liquid bulk terminal, with capacity to berth VLCC vessel which are currently restricted to offshore moorings. New rail and road access and infrastructure, aligned with the 2050 Vision for the Durban – Gauteng freight corridor project. Expanded back of port logistics areas and coastal intermodal hubs and terminals. 9

The End THANK YOU