Camera Connections 1 4 Connect camera to outlets inside grey box in the Pedestal. Turn Monitors on to channel 31. Turn toggle switch on, Aft plenum toggle.

Slides:



Advertisements
Similar presentations
This presentation is intended to assist you in troubleshooting basic problems that can occur with hardware and software. NOTE: This presentation contains.
Advertisements

EXAMPLE OF A STORYBOARD FOR A SCENE FROM A WESTERN.
VGA Input Cable Connect to the VGA jack on the back of the laptop Connect to VGA Input 1 on the back of the projector.
Smart Cart Multimedia Lectern Technology Resource Center.
Manual for Appliances, Tools, and Materials in the New Millennium Hall Auditorium.
Setting up and using an LED projector with computer & video input device MEDT 7477 Submitted by: Team 6 Has Slone.
2G BBULBE PASS Instructions-4 Replacement of bubble generator.
Do you think that this bulb will light up? Build the circuit and check your prediction Fix the circuit so that the bulb does light up. A.
Click your mouse to continue Menu Conventions A check mark option is a toggle or “on-off” switch (like a light switch) that is either checked (turned on)
Multiple 3D layers in one Photoshop document. Photoshop document with one 3D layer A Photoshop document with one 3D layer.
The 555 as an Astable Multivibrator. Inside look at a 555 Integrated Circuit Timer.

Showing Demonstrations on the TV How to connect the camera to our TV set.
Electricity By Denise Carroll.
AUDIO VISUAL TRAINING Center for Academic Success.
Should be on Up to hear patient button presses Down to mute. In either case the #1 and #2 lights should light with each button press. Leave the 5 to the.
Super Vac Smoke Ejector SECTION: Tools and Equipment ISSUED: REVISED: ##-####
 No Eating & Drinking  Dress safely (especially in workshop) in order to avoid unsafe act.
Circuits and Electronics. Circuits A circuit is a closed path through which a continuous charge can flow. A circuit is a closed path through which a continuous.
GEN IV IP NVR Setup And Instructions. Playback Recordings 1)Click and select your device 2)Select Camera in next box a) To select more then one camera.
The Bell Camera1 Trainer Training The Bell Camera.
Connecting a Switch to an Environmental Control Unit An EveryoneCan Production Brought to you by Rebecca Kowalczyk, OTR/ Assistive Technology Consultant.
3-Way Switch Circuit Notes
Image Downloading Instructions General Instructions.
Camera Pieces in Box TV Battery Battery Charger Camera Sun shade.
Lesson 1: Learning About Computer Basics. 2 Concept 1.1 Computer Basics What can you do with a computer? –Write a letter –Make a picture –Find maps and.
AUP2G57 configured as flip flop Dual Configurable Logic Design Contest.
2G BBULBE PASS Instructions-5 Replacement of Heater.
Updated 710 Turn On/Off procedure Kim Peifley 12/18/14.
AUX1 channel basic setup on Pixhawk
STBD. BOAT DECK MONITOR HEAVY CORROSION FOUND INSIDE ELECTRICAL MOTORS RENDERING THE MONITOR NON-OPERATIONAL.
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
TANDBERG VIDEO CONFERENCING SYSTEMS. CONTENTS USAGE OF REMOTE CONTROL INITIATE A POINT TO POINT CALL INITIATE A MULTIPOINT CALL DUO VIDEO SOME OTHER FEATURES.
Introduction to Engineering Camera Lab #4 – 3 Task #2 Agenda Review Task #2 procedure Conduct Task #2 Work on lab report.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
Roll up Door CHECK GEAR OIL CAPACITY MAINTAIN AT FILLER PLUG LEVEL
Connections are loose for draining pump Water in From street Water out to house This is the setup for public water Pressure and the pump system turned.
Internal & External components of the computer Abby Davis.
Three – Way & Four – Way Switches PowerPoint Created by: Sidney Bell
Basic study of a switch Unit 3.Lesson 3. A switch Purpose A switch is a mechanical device used to connect and disconnect a circuit at will Parts seen.
Electricity Notes 6 - Circuits Electric Circuit – _______________________________________ All electrical circuits have 4 parts: 1.____________________________________________________.
1 Introduction to Pure Data (pd) Thomas Edwards
Session aims Clarify the role of Classroom in the course Explore the Classroom interface Try out the Classroom communication tools: (Text chat, Voice chat,
HOME ELECTRICAL SAFETY Safety tips for your Do-It-Yourself (DIY) electrical projects at home.
Bio 498/698. Studio Pro Dynalite Flash Generator The Dynalite is the power source and main control for all lighting equipment used in the imaging process.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Introduction to Engineering Camera Lab #4 – 2 Task #1 Agenda Overview of Camera Lab #4 Learn about operation of oscilloscope Review Task #1 Procedure Conduct.
Starter: use Pg to complete the table
Instructions to Non-Video Conferencing High Tech Classrooms
TROUBLESHOOTING.
HOW TO CONNECT PROJECTOR TO COMPUTER
Using the Tele-Interpreter Machine (TIM)
Connecting hardware and Booting the computer
P5 Gladys Nzita-Mak.
2) Connect the VGA cable from the monitor output of the laptop [D] to the computer input of the projector [E]. [D] [E]
TROUBLESHOOTING.
सोलर पॅनेलचा उपयोग करुन रीचर्जेबल टॉर्च बनवणे.
مهندسی کنترل صدا و تجهیزات حفاظت شنوایی
Table of Contents Name and picture of each appliance, material, and tool How to turn on the power How to install microphones Lobby Arrangement (during.
WATER DISPLAY Deck Operations.
Using the Cameras Shaw STEM Lab
Objective Explain the procedure for installing switches, making common splices, and doing other electrical wiring tasks.
Sound set-up/ Power-up/ Tear Down (Strike)
Which of the following would best describe the situation inside the circle?
3-Way Switch Design Changing the position of either switch will change the state of the lamp. Applications might include hallways, staircases, or rooms.
Word Word Word Word Word Picture Definition Historical Significance
Your Newsletter so far Describe the sub-sector, channels, format, size, ownership and location of a retail business. Describe the sub-sector, channels,
Charging System Process Map
Project: Wiring a Building
How To Use The FD92 Digital Camera
Presentation transcript:

Camera Connections 1 4 Connect camera to outlets inside grey box in the Pedestal. Turn Monitors on to channel 31. Turn toggle switch on, Aft plenum toggle is #1 and Pedestal #4, check picture on all 3 Monitors. Lubricate camera connections with Silicone.

Camera Connections CHANNEL CONTROL MONITOR “ON, OFF” 1 2 3 TOGGLE # 1 TOGGLE # 4 Connect camera to outlets inside grey box in aft plenum Turn Monitors to channel 31. Turn toggle switch on, Aft plenum toggle is #1 and Pedestal is # 4, check picture on all 3 monitors. Lubricate camera connections with Silicone.