Pierre Girard ATLAS Visit

Slides:



Advertisements
Similar presentations
LCG WLCG Operations John Gordon, CCLRC GridPP18 Glasgow 21 March 2007.
Advertisements

Last update 01/06/ :23 LCG 1Maria Dimou- cern-it-gd Maria Dimou IT/GD Site Registration policy & procedures
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Wofgang Thöne, Institute For Scientific Computing – EGEE-Meeting August 2004 Welcome to the User.
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
GRACE Project IST EGAAP meeting – Den Haag, 25/11/2004 Giuseppe Sisto – Telecom Italia Lab.
EGEE ARM-2 – 5 Oct LCG Security Coordination Ian Neilson LCG Security Officer Grid Deployment Group CERN.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
11/30/2007 Overview of operations at CC-IN2P3 Exploitation team Reported by Philippe Olivero.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
The ILC And the Grid Andreas Gellrich DESY LCWS2007 DESY, Hamburg, Germany
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
LCG-France Vincent Breton, Eric Lançon and Fairouz Malek, CNRS-IN2P3 and LCG-France ISGC Symposium Taipei, March 27th 2007.
Towards a Global Service Registry for the World-Wide LHC Computing Grid Maria ALANDES, Laurence FIELD, Alessandro DI GIROLAMO CERN IT Department CHEP 2013.
15-Dec-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the Joint Security Policy Group) CERN 15 December 2004 David Kelsey CCLRC/RAL,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE User Support Infrastructure Torsten.
Glite. Architecture Applications have access both to Higher-level Grid Services and to Foundation Grid Middleware Higher-Level Grid Services are supposed.
EGEE is a project funded by the European Union under contract IST Support in EGEE Ron Trompert SARA NEROC Meeting, 28 October
Site Validation Session Report Co-Chairs: Piotr Nyczyk, CERN IT/GD Leigh Grundhoefer, IU / OSG Notes from Judy Novak WLCG-OSG-EGEE Workshop CERN, June.
Rutherford Appleton Lab, UK VOBox Considerations from GridPP. GridPP DTeam Meeting. Wed Sep 13 th 2005.
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
Testing and integrating the WLCG/EGEE middleware in the LHC computing Simone Campana, Alessandro Di Girolamo, Elisa Lanciotti, Nicolò Magini, Patricia.
Last update 31/01/ :41 LCG 1 Maria Dimou Procedures for introducing new Virtual Organisations to EGEE NA4 Open Meeting Catania.
Last update 22/02/ :54 LCG 1Maria Dimou- cern-it-gd Maria Dimou IT/GD VO Registration procedure Presented by.
EGEE ARM-2 – 5 Oct LCG/EGEE Security Coordination Ian Neilson Grid Deployment Group CERN.
INFSO-RI Enabling Grids for E-sciencE Operations Parallel Session Summary Markus Schulz CERN IT/GD Joint OSG and EGEE Operations.
The GridPP DIRAC project DIRAC for non-LHC communities.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Mario Reale – GARR NetJobs: Network Monitoring Using Grid Jobs.
EGEE is a project funded by the European Union under contract IST New VO Integration Fabio Hernandez ROC Managers Workshop,
EGEE is a project funded by the European Union under contract IST Issues from current Experience SA1 Feedback to JRA1 A. Pacheco PIC Barcelona.
II EGEE conference Den Haag November, ROC-CIC status in Italy
SAM architecture EGEE 07 Service Availability Monitor for the LHC experiments Simone Campana, Alessandro Di Girolamo, Nicolò Magini, Patricia Mendez Lorenzo,
2007/05/22 Integration of virtualization software Pierre Girard ATLAS 3T1 Meeting
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Services for Distributed e-Infrastructure Access Tiziana Ferrari on behalf.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
2007/07/04 Organisation and tasks of ROC France Pierre Girard Visit of Japanese grid site managers.
Vendredi 27 avril 2007 Management of ATLAS CC-IN2P3 Specificities, issues and advice.
CERN WLCG Grid Storage Systems Deployment Flavia Donno, CERN 6 November 2007 Organization of Storage Support through GGUS Flavia Donno CERN/IT-GD CERN.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI solution for high throughput data analysis Peter Solagna EGI.eu Operations.
Alice Operations In France
Bob Jones EGEE Technical Director
WLCG IPv6 deployment strategy
Grid Computing: Running your Jobs around the World
Regional Operations Centres Core infrastructure Centres
Monitoring and Information Services Technical Group Report
Moroccan Grid Infrastructure MaGrid
LCG Security Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
POW MND section.
Data Challenge with the Grid in ATLAS
Brief overview on GridICE and Ticketing System
EGEE VO Management.
Pierre Girard Réunion CMS
Lavoisier : a way to integrate heteregeneous monitoring systems.
Grid services for CMS at CC-IN2P3
CREAM-CE/HTCondor site
The CCIN2P3 and its role in EGEE/LCG
Short update on the latest gLite status
Glexec/SCAS Pilot: IN2P3-CC status
Interoperability & Standards
LCG Operations Workshop, e-IRG Workshop
Leigh Grundhoefer Indiana University
LHC Data Analysis using a worldwide computing grid
CC and LQCD dimanche 13 janvier 2019dimanche 13 janvier 2019
Release and deployment process Working Group
EGEE Operation Tools and Procedures
GRIF : an EGEE site in Paris Region
Site availability Dec. 19 th 2006
Installation/Configuration
The LHCb Computing Data Challenge DC06
Presentation transcript:

Pierre Girard ATLAS Visit 2007-04-26 03/12/2018 2007/04/26 Grid at CCIN2P3 Pierre Girard ATLAS Visit 2007-04-26

LCG/EGEE grid activities Grid integration at CC 03/12/2018 Content LCG/EGEE grid activities Grid integration at CC Grid team Grid site infrastructure Major concerns Global concerns Operational concerns Technical concerns Pierre Girard / ATLAS visit at CCIN2P3 2007/04/26

CCIN2P3 LCG/EGEE grid activities 03/12/2018 CCIN2P3 LCG/EGEE grid activities EGEE-SA1 Activity: European Grid Support, Operation Management LCG Tier-1 Activity: Data storage centre at both national and regional level, data reconstruction, data distribution over Tiers-2, etc. (EGEE) CIC: Core Infrastructure Centre (EGEE-II) ROC: Regional Operations Centre Global National Site Support Grid services Accounting CC IN2P3 Monitoring User Support (EGEE-II) ROC Storage (EGEE/EGEE-II/LCG) EGEE Resource Centre T1/T2 LCG-Site Computing Local Pierre Girard / ATLAS visit at CCIN2P3 2007/04/26

Grid integration at CC Grid team 03/12/2018 Grid integration at CC Grid team Grid Started using the « Cappuccino » strategy: put the cream on the top of the coffee, and let it be Grid team created over the production service infrastructure One member of each existing team appointed to follow up the grid deployment To accelerate the dissemination of grid technology within CCIN2P3 To ease the interfacing between grid middleware and CC-IN2P3 services/resources To provide expert advices (from both directions) Production Storage User Support Web / DB admin. Admin. System and Network Pierre Girard / ATLAS visit at CCIN2P3 2007/04/26

Grid integration at CC Grid site infrastructure (1) 03/12/2018 Grid integration at CC Grid site infrastructure (1) VO Box VO LHC Grid Information System VO Box VO LHC Top BDII VOMS 4 VOs MonBox 4 Sites V OBox VO LHC VO Box VO LHC Central LFC Biomed Local LFC 4 VOs LHC FTS 4 VOs LHC Local LFC 2 VOs LHC FTS 4 VOs LHC Site BDII Computing Element Computing Element SRM SRM Storage Element Storage Element Computing Element Computing Element Global service BQS HPSS DCACHE Regional service Anastasie Local Service WN Computing Storage Pierre Girard / ATLAS visit at CCIN2P3 2007/04/26

Grid integration at CC Grid site infrastructure (2) 03/12/2018 Grid integration at CC Grid site infrastructure (2) Several grid sites supply CCIN2P3 Ressources Pre-production grid Reconstr. Simulation Analysis PPS Site BDII T1 Site BDII T2 Site BDII ? SE SRM2.2 SE CE CE gCE CE CE CE CE BQS test WN Computing BQS Anastasie WN Computing ? WN Computing Pierre Girard / ATLAS visit at CCIN2P3 2007/04/26

Major concerns Global concerns (1) 03/12/2018 Major concerns Global concerns (1) VO Box VO LHC Grid Information System VO Box VO LHC ~20 machines Top BDII VOMS 4 VOs MonBox 4 Sites V OBox VO LHC VO Box VO LHC ~30 machines Central LFC Biomed Local LFC 4 VOs LHC FTS 4 VOs LHC Local LFC 2 VOs LHC FTS 4 VOs LHC ~4 node profiles ~20 node profiles Site BDII Computing Element Computing Element SRM SRM Storage Element Storage Element Computing Element Computing Element Storage Team Grid Team Grid Team Storage Team Grid Team Grid Team Global service BQS HPSS DCACHE Regional service Anastasie Local Service WN 2 FTEs ~2 FTEs Computing Storage Pierre Girard / ATLAS visit at CCIN2P3 2007/04/26

Major concerns Global concerns (2) 03/12/2018 Major concerns Global concerns (2) Our first major concerns Many service nodes Many different types of node Few people to administrate Few time before starting A production quality to be maintained So far as we can, we have… To reuse Our practical abilities Existing infrastructure when possible But, add nodes if that eases operations To avoid to introduce too much VO specificities Experience acquiring Operational procedures set up Monitoring/Administration tools adaptation Pierre Girard / ATLAS visit at CCIN2P3 2007/04/26

Major concerns Global concerns (3) 03/12/2018 Major concerns Global concerns (3) Improving grid communication will be THE challenge Mutliple information sources: LCG, EGEE, VOs, regional and internal site communication Too much information or knowledge are still coming from mails or from a mess of meetings A lot of progress has been achieved yet At CC, VO-Site communication improvement One VO support contact appointed by LHC VO Speak VO language with site Speak Site language with VO Shown to be a good point to improve the communication For ATLAS matters, grid site administrators systematically discuss with Ghita Rahal Ghita Rahal knows who is the best CC interlocutor for any ATLAS request Pierre Girard / ATLAS visit at CCIN2P3 2007/04/26

Major concerns Operational concerns 03/12/2018 Major concerns Operational concerns We set up operational procedures to suppress or, at least, to reduce grid service outage Ex.: CE update might be operated without any outage Set up a new CE and validate it works well out of production Close the old CE and replace it by the new one Take out the old CE when its jobs are ended But “bad” VO usage can interfer with that Ex.: Job submission explicitly refers to a CE by specifying its hostname It is time-consuming because you must inform the supported VOs before taking any action on the CE Job submission will failed if the CE is out of production Grid middleware theoretically enables those operations But problem certainly comes from the fact that M/W doesn’t enable to express requests like: “please submit my job to any allowed CE of site IN2P3-CC” Pierre Girard / ATLAS visit at CCIN2P3 2007/04/26

Major concerns Technical concerns (1) 03/12/2018 Major concerns Technical concerns (1) Dealing with VOMS information If I was a VO, I would be very enthousiastic about the new possibilities offered by VOMS But as site… I need to know what behavior is expected behind a VOMS role/group I must find a technical solution to translate it in terms of site policy I must possibly adapt the interface between grid frontend and local services to implement the behavior CE Jobmanager <-> BQS CE Information Provider <-> BQS LRMS-independent solution proposed by Jeff Templon for CE But, this solution raises some scalability problems with big sites ASAP we must identify together new requirements that will be introduced because of VOMS Pierre Girard / ATLAS visit at CCIN2P3 2007/04/26

ATLAS is our most intensive grid user 03/12/2018 The end ATLAS is our most intensive grid user From grid team point of view (at least), we are working well with Atlas people French Atlas people are very present and responsive Atlas is also present and responsive at global operations level (ex.: grid operations meetings) Pierre Girard / ATLAS visit at CCIN2P3 2007/04/26