DCLL TBM Safety Status Brad Merrill, Fusion Safety Program

Slides:



Advertisements
Similar presentations
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Advertisements

Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Guidelines for Energy Efficiency Measure Cost and Non-Energy Benefits Subcommittee.
Idaho National Engineering and Environmental Laboratory Two Tube Failure Event for the Helium Cooled Blanket Lee Cadwallader and Brad Merrill INEEL Fusion.
Fusion Power Plant Licensing and Waste Management by Antonio Natalizio for Presentation at the 9 th Course on Technology of Fusion Reactors at Erice (Monastero.
US TBM Activities Update 1- Quick background 2- Recent Activities Mohamed Abdou FNST Meeting held at UCLA, August 2-4,
US TBM Activities and Collaboration Discussion Mohamed Abdou FNST Meeting held at UCLA, August 18-20, 2009.
US TBM Meeting INL, August 10-12, 2005 B. J. Merrill and D. A. Petti Fusion Safety Program Safety and Tritium R&D.
April 27-28, 2006/ARR 1 Finalizing ARIES-CS Power Core Engineering Presented by A. René Raffray University of California, San Diego ARIES Meeting UW, Madison.
US ITER TBM DCLL TBM Design, Analysis and Development C. Wong, M. Dagher, S. Smolentsev and S. Malang FNS/TBM Meeting UCLA, September 19-20, 2007.
Suggested US Plans and Strategy for ITER Test Blanket Mohamed Abdou Presented at APEX/TBM Meeting, UCLA, November 3-5, 2003.
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
1 Brief Status of ITER TBM A High-Level Ad Hoc Group (AHG) met April 10-11, per request of the ITER Council. In that meeting, Parties intentions were stated,
IAEA International Atomic Energy Agency Regulations Part II: Basic Concepts and Definitions Day 8 – Lecture 5(2)
2 nd EU-US DCLL Workshop University of California, Los Angeles, Nov th, 2014.
TBM WG Meeting UCLA, December 12 th -14 th, 2005 Brad Merrill/Fusion Safety Program TBM Safety Update.
Stephen Dembek, Section Chief Export Controls and International Organizations Section Office of International Programs Contact Info: ,
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Vessel Vacuum Tritium Permeation & PbLi/Water Safety Issues Paul Humrickhouse INL Fusion Safety Program October 13 th -14 th, 2011 ARIES Meeting Gaithersburg,
WBS activity and Cost Summary (Focus on Design) Clement Wong TBM Conference Call Oct. 27, 2005.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14,
IAEA International Atomic Energy Agency LICENSING OF RADIOACTIVE WASTE MANAGEMENT FACILITIES, part 2 Luc Baekelandt Safety of.
KoM meeting 09 Oct 06 Kick-off-meeting of EFDA TW6-TSL-002 contracts , , , Oct 2006 Kick-off-meeting of EFDA TW6-TSL-002.
San Diego Workshop, 11 September 2003 Results of the European Power Plant Conceptual Study Presented by Ian Cook on behalf of David Maisonnier (Project.
Tritium Extraction from a DCLL Blanket Prepared by: Scott Willms (LANL) Collaborators: Brad Merrill (INL), Siegfried Malang (Consultant), Clement Wong.
Conference Call, June 23, 2005 Remarks on US Costing Activities for the US ITER-TBM Mohamed Abdou.
B. J. Merrill 1, L.C. Cadwallader 1, C. Wong 2 Presented at: FNST Meeting UCLA, August 18 th -20 th Status of DCLL TBM Safety Documentation Containing.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
DCLL TBM R&D Summary Compiled by Neil Morley for the TBM Conference Call Oct 27, 2005.
Fusion Technology - Safety & Environment Via E. Fermi 45, I-00044, Frascati (Rome), Italy ENTE PER LE NUOVE TECNOLOGIE,
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
PM2.5 Working Group Meeting #2 South Coast Air Quality Management District July 11, 2006.
Various Strategies for DCLL in the US Technology Program Poor ITER utilization (Lowest Cost Scenario) - Support EU HCLL effort, no independent DCLL TBM.
IAEA International Atomic Energy Agency 27 September 2012 Technical Criteria Plenary Closing.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Plan for IEA LB Workshop Dai-Kai Sze, UCSD PattrickCalderoni, INL Fusion Nuclear Science and Technology Meeting UCLA, August 2-4, 2010.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
ARIES Meeting University of Wisconsin, April 27 th, 2006 Brad Merrill, Richard Moore Fusion Safety Program Update of Pressurization Accidents in ARIES-CS.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Task 9:Fusion Power Plant Studies Status & Planned Activities
MELCOR model development for ARIES Safety Analysis
Summary of Nuclear Input for Safety Analysis for the DCLL TBM -update-
Regulations Part II: Basic Concepts and Definitions
-EL ABBARI Younes, FADIL Najib (CNESTEN) -SADIQ Younes (AMSSNuR)
Proposed Revisions to 10 CFR Part 61
Some General Guidelines for the US TBM Costing
Introductory Remarks and Meeting Goals
DCLL TBM Reference Design
Transmitted by the expert from Japan
South Carolina Perspective on Part 61 Proposed Revisions
NRC Export and Import Licensing 10 CFR Part 110
The DBD: Outline and Scope
CEOS Work Plan Steven Hosford, ESA/CNES, CEO CEOS SIT-33
Revisions to the Concentration Averaging and Encapsulation Branch Technical Position A. Christianne Ridge Division of Decommissioning, Uranium Recovery,
Harnessing Fusion Power: Safety and Environment - Overview and Thrusts
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
VLT Meeting, Washington DC, August 25, 2005
Remarks on US Costing Activities for the US ITER-TBM
Status Report to GRB #69 Task Force on Reverse Warning issues
TRTR Briefing September 2013
US TBM Cost Activity Tom Mann December 12 – 14, 2005.
IAEA RER/9/141: Improving National Infrastructure for Safety   Regional Workshop: Drafting School for Regulations. Radiation Safety Stream Country IAEA.
R&D approach strategy for FCI.
Radiation Safety External hazards & antagonistic threats
2015 January February March April May June July August September
DCLL Nuclear Analysis WBS Costing Mohamed Sawan University of Wisconsin-Madison Mahmoud Youssef University of California-Los Angeles ITER TBM Meeting.
Status of discussion after 7th meeting
Presentation transcript:

DCLL TBM Safety Status Brad Merrill, Fusion Safety Program UCLA TBM Meeting May 10-11th, 2006

TBM Safety Workshop Summary A workshop on TBM Safety/Licensing was held April 3rd at Cadarache. The workshop participants included members of the ITER International Team (IT) (Jean-Philippe Girard, Markus Iseli, and Neill Taylor) and the TBM Safety Contact Person from each TBM Party Members from the ITER IT presented ITER’s licensing schedule and the safety input that was required from each TBM The ITER IT is presently planning to submit ITER’s Report on Preliminary Safety (RPrS) to the French Nuclear Safety Authority (NSA), which is comparable to the US NRC, in September of 2007, with the hope of obtaining a permit to construct ITER by April 2009 In order to meet this schedule, the ITER IT must have the RPrS completed by August of 2007, which means that all input to the RPrS, including TBM safety input, must be available to the ITER IT by January 2007 This input must include for both the TBM and ancillary systems: Technical description Source terms (radioactive, energy, and chemical) Operational releases Plant worker operation radiation exposure estimates

TBM Safety Workshop Summary (cont.) This input must include for both the TBM and ancillary systems (con’t): Failure modes and effects analysis (FMEA) study Consequence analysis of selected design basis accidents (DBA) and beyond design basis accidents (BDBA) Waste disposal analysis Regarding accident analyses, the ITER IT is only planning to include the bounding (worst consequence) TBM accident result in ITER’s RPrS to avoid complicating the licensing process The safety analysis performed for the DCLL, as contained in the DDD, is lacking in three areas Plant worker operational radiation exposure estimates An FMEA study to determine likely accidents Consequence analysis of accidents based on FMEA results The accident scenarios analyzed in our DDD are those specified by the ITER IT during the ITER EDA, and may or may not be those ITER would like to include in ITER’s RPrS

TBM Safety Workshop Summary (cont.) I pushed back hard on these reporting requirements for two reasons: Given the schedule ITER is on, the US does not have the resources to perform a complete FMEA, perform accident consequence analysis for seven accident categories (e.g. seven accidents), plus estimate occupational doses related to TBM maintenance An FMEA does not tell you which accidents to analyze per category (e.g. which will be the worst consequence accident) so in theory you must analyze them all By the end of the meeting, the ITER IT and TBM Parties agreed that Draft copies of EU FMEAs (already nearing completion) would be made available to all parties by June 2006 The safety sections from each TBM’s Design Description Document (DDD) would be transmitted to the ITER IT by July 2006 to start the process of assembling source term and operational release information for ITER’s RPrS; the safety sections can be either transmitted as they exist now in the DDD or revised if desired In September 2006, there will be a meeting to discuss FMEA results and select accidents from only four accident categories for each TBM Party to analyze Consequence results will be transmitted to the ITER IT by January 2007

Future Plans I plan to submit our DDD safety section with little or no changes, which means a larger TBM with higher: radioactive source inventories, tritium production rates, decay heating, and PbLi flow rates than presently envisioned, because I do not have enough funding to shoot at a moving target during this process I would like to revise the tritium operational release calculation in our DDD because the DCLL TBM operational releases were considerably higher than other TBM estimates. I would like to include the permeation reduction afforded by the SiC FCI in the PbLi outer pipe and possibly increase the length of the permeator tubes. To include the FCI, I need an estimate from the team on the fraction of PbLi that flows in the gap between the FCI and outer FS pipe. I plan to use most of the EU HCLL TBM FMEA for our TBM, and have Lee Cadwallader at the INL complete our FMEA by including the PbLi cooling systems After September, new accident analyses will be performed on the TBM and TBM ancillary systems as they appear in the DDD and the results submitted to the ITER IT by the end of December I did not reach an agreement with the ITER IT regarding occupational exposure estimates. My proposal was to base TBM dose estimates on those already being developed for the ITER device scaled by radioactive contact dose (e.g., scaled from divertor maintenance doses) Beyond the RPrS, the ITER IT is asking for a fully developed Dossier on Safety for each TBM similar to the RPrS in scope