LARP Phase II Secondary Collimator RC1

Slides:



Advertisements
Similar presentations
Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Advertisements

Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
1 2/10/2005Thrust Chamber Assembly Concept Design Review Manufacturing Josh Revenaugh.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Engineering Department ENEN 16/08/2013 LR - BBC Pre-Study 1 STATUS of BBC DESIGN and ENGINEERING : PRELIMINARY RESULTS G. MAITREJEAN, L. GENTINI.
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Specification Meeting – 7/11/2008 Phase II Collimators: design status, options and future outlook.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
LHC Phase II Collimator teleconference - 4 March 2008LHC Rotatable Phase II Collimators 1 beam LARP Phase II collimator Progress and Plans 4 March 2008.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 16 May 2006 No 1 /22 LARP Phase II Secondary Collimator RC1 Collimator Test Program Revised 5/15/06.
SLAC RC Status Report 30 August 2010 LHC Collimation Working Group Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
SLAC R&D Mtg November 2007LHC Rotatable Phase II CollimatorsSlide # / 17 beam LARP Rotatable Collimators for LHC Phase II Collimation 12 November.
LARP LHC PHASE II COLL RC1 - S. Lundgren 1 April 2009 No 1 /6n LARP Phase II Secondary Collimator RC-1 Mechanical Design Review 01/04/09.
1.3GHz Input Coupler for ILC
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
RHIC 56 MHz HOM Damper Fundamental Damper Fundamental Power Coupler Pick-ups S. Bellavia January 19 th, 2010.
Task List for Phase II Rotatable Collimator Project at SLAC 30 January 2007 CERN/LARP Video Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Collimation Overview 28 October 2008 LARP CM11, Fermilab Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program 1)Short Status.
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LARP Rotatable Collimators for LHC Phase II Collimation 09 July 2007 SLAC R&D Status Meeting Gene Anzalone, Eric Doyle, Lew Keller, Steve Lundgren, & Tom.
Phase II Collimators for LHC Upgrade at SLAC - Material Issues E. Doyle 03 Sept /25 Workshop on Materials for Collimators CERN 2007/09/03 Phase.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
First Wall Panel - Overview
TDR guideline discussion on Cavity Integration
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Status of material tests
BSS Prep work at CERN and Acceptance of Parts
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
Preliminary Y-chamber specifications – First draft
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
LARP Phase II Secondary Collimator RC-1
Design of Distribution Feedbox at LHC P7
SLAC RC Status Report US LHC Accelerator Research Program
News Request to install SLAC collimator in SPS
Recommendations of 12/16/05 review committee & SLAC response
23 April 2012 Tom Markiewicz/SLAC
Welcome! Drafting 2323: Pipe Drafting
¼ meshed models for Omega3P calculations
Current Design and Short Status
Phase II Collimators : design status
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Rotatable Collimator
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
Ceramic to metal connection.
LARP Phase II Secondary Collimator RC-0 and RC-1
Phase II Collimator, Alternative Jaw Simulations
Presentation transcript:

LARP Phase II Secondary Collimator RC1 Collimator Development Status Revised 11/28/08 LARP LHC PHASE II COLL RC1 - S. Lundgren 23 Oct 2008 No 1 /6

OFE Copper cylinders drilled ready for Mandrel fabrication. RC-1 Status OFE Copper cylinders drilled ready for Mandrel fabrication. Glidcop Al-15 LOX for 1st center Hub ready for manufacture @ SLAC 1st Shaft Assembly planned for brazing in early January. 4 more Half Shafts due by 12/12/08 more due. Drawing package for vendor quotation nearing completion. Tests underway to measure RF contact current for metallic bearings @ Jaw ends. LARP LHC PHASE II COLL RC1 - S. Lundgren 23 Oct 2008 No 2 /6

Cylindrical Tank is proposed. New Tank Concept Cylindrical Tank is proposed. Modular assemblies weld to 355.6mm O.D. x 6.35mm wall SST Pipe Conflat flanged adapters seal Tank end openings and connect Tank to Beampipe. LARP LHC PHASE II COLL RC1 - S. Lundgren 23 Oct 2008 No 3 /6

Jaw Transition Resistance Test 4 wire resistance test planned Purpose of test is to find acceptable resistance. Stainless Steel Ball bearings will be tested with gold and Rhodium plating Groove plating is optional at this point Load can be increased by using oversized bearings or extra thick plating Simulated JAW Bearing Race LARP LHC PHASE II COLL RC1 - S. Lundgren 23 Oct 2008 No 4 /6

Main Constraints LARP LHC PHASE II COLL RC1 - S. Lundgren 23 Oct 2008 No 5 /6