27-31 August 2018 Palais de Congrès

Slides:



Advertisements
Similar presentations
Join Us Now at: Enabling Interoperability for the Utility Enterprise And TESTING.
Advertisements

EPRI Smart Grid Demonstration and CIM Standards Development
By Lauren Felton. The electric grid delivers electricity from points of generation to consumers, and the electricity delivery network functions via two.
AUT S.B.S. - Presentation name - Date - Language - Electronic File Name 1 SCHNEIDER ELECTRIC Solutions.
© Copyright 2013 SISCO, Inc. Model-Driven Integration Using CIM Increase Flexibility & Manage Complexity using CIM Training Programs to Build Staff Knowledge.
Join Us Now at: Enabling Interoperability for the Utility Enterprise And TESTING.
Draft Proposal of UCA Iug Presence at CIGRE 2012
1 Audit Preparation. 2 September 8 – 11, 2008 ERCOT will be audited as the Reliability Coordinator (RC) Transmission Operator ( TOP) Balancing Authority.
Dattatreya Kulkarni Sr. Project Manager Sonata Software Limited UNC203 Sanjay Kumar Madhva Architect Sonata Software Limited.
IATA 12 th Maintenance Cost Conference The 12th Maintenance Cost Conference (MCC) is excited to continue its success. IATA is pleased to announce that.
Advancing National Wireless Capability Date: March 22, 2016 Wireless Test Bed & Wireless National User Facility Paul Titus Department Manager, Communications.
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
Testing Technical Committee Paris, France August 24, 2010
Standards Are Note Enough! Challenges of IEC Interoperability
Settlement Timelines for 2016 Christmas Holidays
5 Day Forecast Mon Tues Wed Thu Fri.
Calculus I – Course Syllabus
It’s That Time of the (Geek) Year Again! SC2003
Power Solutions PowerLogic ION7550/7650 Sales Enablement Kit
Sample Scheduler Roll-out Month 1
“Warm-Up” Knowledge Review Week 2: Problem- Solving Boot Camp I
WELCOME TO ADVISORY!
Enabling Standards for Demand Side Management
Revisit RTM True-Up Schedule and Invoicing
Karlheinz Schwarz.
Monday.
MicroSCADA Pro Substation Automation Retrofit of Substation SILS
Days of the Week Les docs d’Estelle –
Integrity - Service - Innovation
IEC Part Discussion (IEC 62541/OPC UA for CIM) Jim Luth
March 2018 Sun Mon Tue Wed Thu Fri Sat 25
IEC Ed. 2 Conformance Testing Best Practice
Time Revision.
Executive Secretary Agenda Items March-2016-Plenary
Fun with dates and calendars
Governance Structure and Operating Rhythm
Time management School of Rock.
Karen Bartleson, President, IEEE Standards Association
27-31 August 2018 Palais de Congrès
Power Solutions PowerLogic PM8000
MON TUE WED THU
27-31 August 2018 Palais de Congrès
Fun with dates and calendars
27-31 August 2018 Palais de Congrès
Enabling Interoperability for the Utility Enterprise
8th grade warm up for week of
2008 Calendar.
Talking about weekly activities
CS 336/536: Computer Network Security Fall 2014 Nitesh Saxena
Sun Mon Tue Wed Thu Fri Sat
Hundred Dollar Questions
Visual For Weekly and Monthly Schedule
Model-Driven Integration Using CIM
Created by Wendy North –
Testing Center – Finals
Sun Mon Tue Wed Thu Fri Sat
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
OaSIS CTI Interop RSA February San Francisco, CA.
Contact
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Sun Mon Tue Wed Thu Fri Sat
Lovejoy Community Center April “2018”
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
Reviewing Abbreviations
义务教育教科书冀教版小学英语四年级上册第一单元
Field installable, upgradeable and scaleable
2008 Calendar.
Open Bowling Times 9:30 pm – 12 Midnight Moonrock
CIMug Interaction with IEC Randy Rhodes Utility Co-Chair
Presentation transcript:

27-31 August 2018 Palais de Congrès Cigre Paris 27-31 August 2018 Palais de Congrès

Booth logistics Sunday: Building up demo as of 2pm Access to the Opening Ceremony on Sunday from 4pm & cocktail afterwards Monday: 61850 meeting at 4pm, open for all, snacks and wine Show is open until 8pm Cocktail open to all in the Exhibition Halls on the 3 levels, from 6 pm to 8 pm Friday: tear down booth as of 4pm

Security Security ordered: Sun 26/08 19.00-8.00 Mon. 27/08 18.30-8.00 Tue. 28/08 18.30-8.00 Wed. 28/08 18.30-8.00 Thu. 29/08 18.30-8.00

Actionlist – done! LCD screen rental 24”– ordered Doble,Sisco, RTDS, SEL Badges for the event – Done Order CAT 6 cables copper and extender - Done Status delivery? Content USB sticks (all-in): USB sticks ordered: 3.0 – 16GB

Actionlist Action items, to be done this week! Slide running presentation (Platinum 3, Gold and Silver 2 slides) Missing: Schneider, Keri, Opal-RT, Sisco UCA Banner for long wall Update Demo Flyer Presentation Schedule Poster, approval final schedule Upload booth presentations to the site UCAIug Cigre Pressrelease > Press center: finalize pressrelease Prepare announcement 61850 booth meeting: Press center and/or mailing delegate list??

Booth presentations Monday Time no Assigned to   14.10-14.30 1 UCAIug presentation, Margaret 14:30-14:50 2  PCI – ERCOT’s nodal market solution 14:50-15:10 3  SISCO: Data Management Using CIM and IEC 61850 15:10-15:30 4 TMW: Testing protocol gateways, HMIs, and SCADA in a simulated IEC 61850 system 15:30-15:50 5 DNV GL PRP/HSR conformance and functional testing on Ethernet switches and IEDs (Bas Mulder) 15:50-16:10 6 RTDS IEC 61850 representation of switchgear, switch controller, and interlocking functions for real-time simulations; 16:10-18.00 UCA 61850 User’s Group Meeting Chair: Bas Mulder

Booth presentations Tuesday Time No Assigned to 12.00-12.30 7 Doble: “Secure and Efficient Testing of IEC 61850-Based Protection and Control Systems” (30 min presentation) 12:20-12:40 8 RTDS: Integrated testing for IEC 61850 compatible IEDs in a simulated smart automation system 12:40-13:00 9  PCI- T-nexus AEP’s Network Model Management Solution   13:00-13:20 10 SEL:  10X: Power System Technology 10 Years Ahead of Industry - International Standards Based Communications  13:20-13:40 11 TMW Testing protocol gateways, HMIs, and SCADA in a simulated IEC 61850 system 13:40-14:00 12  SISCO: Challenges and Solutions for GOOSE Traffic Monitoring 14:00-14:20 13 RTDS IEC 61850 representation of switchgear, switch controller, and interlocking functions for real-time simulations;

Booth presentations Thursday Time Slot No Assigned to 12:00 – 12:20 21 SEL: possible customer presentation 12:20 – 12:50 22 Doble:“Secure and Efficient Testing of IEC 61850-Based Protection and Control Systems” (30 min presentation) 12:40– 13:00 23 SISCO: Challenges and Solutions for GOOSE Traffic Monitoring 13:00 – 13:20 24 Schneider Electric Unified IED modeling using IEC 61850 Flexible Product Naming 13:20 – 13:40 25 Schneider Electric ‘IEC 61869 process bus – What are the key differences – 13:40– 14:00 26   SEL: Award Winning Microgrid Controller Uses GOOSE Messages to Balance Utility Ties and Intermittent Renewables  

Any other business Shipping your collateral: http://www.cigre-exhibition.com/wp-content/uploads/sites/1/Transport-Customs-Handling2.pdf Booth hand-over: Sun. 26th August, 2pm Dismantling booth: Fri. 31st August, 4pm