TJC (The Joint Commission) Report Generating Feature…
Let’s walk through some basic and powerful TJC report generating features…
Open TJC Reports Folder After you initiate “Start TJC Reporting” you then run your electrical system through your testing procedures. Start TJC Recording Stop TJC Recording Open TJC Reports Folder TJC
After you initiate “Start JCAHO Reporting” you then run your electrical system through your testing procedures. After you initiate “Start TJC Reporting” you then run your electrical system through your testing procedures.
TJC Testing in Progress Status indicator pops up. TJC
Open TJC Reports Folder You have now captured all required data in the start/stop time “window”. Start TJC Recording Stop TJC Recording Open TJC Reports Folder TJC
Open TJC Reports Folder Start TJC Recording Stop TJC Recording Open TJC Reports Folder TJC TJC
TJC TJC Recording TJC Recording
TJC Recording
Open TJC Reports Folder After reports are completed, print out, email download or disseminate as needed. Start TJC Recording Stop TJC Recording TJC Open TJC Reports Folder TJC
Open TJC Reports Folder TJC Controls Start TJC Recording Stop TJC Recording Manually initiated Start time: 4:46, end time: 6:34. The test ran approx. two hours. Automatic or situational automatic initiation of the TJC reporting feature is also available. Open TJC Reports Folder
Same approx. two hour window.
Example of Engine Data TJC screens.