FMS Repair Work: Summary

Slides:



Advertisements
Similar presentations
GUIDELINES FOR THE PACKAGING AND TRANSPORTATION OF INSERTS & SUPPLEMENTS The printer must ensure that all inserts are free from set-off and that the ink.
Advertisements

n-DVCS/E status report
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Polishing the Ferrules Howard Budd Sep Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
OLYMPUS Collaboration Meeting Luminosity Monitor Symmetric Möller/Bhabha Calorimeter David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
Water jacket to air box crack completed Lower bore repair side A2 needs two more pins and finish work.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
Completion of Winter Projects. Bunker Reconstruction Nr. 4 Pre - Construction.
Shielding the Weiner PSU 7 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
Summary of FMS/Jet Meetings July FMS Meeting: 7/21/14 Discussion of progress refurbishing the FMS – First delivery of ~40-50 finished bases from.
LHQ Coil 02 Winding and Curing Miao Yu 07/11/2013.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
V. Vorobel, SuperNEMO meeting, Aussois Vacuum system upgrade Vacuum probe installed Spectrometer sealed – vacuum improved from 300 Pa to 7 Pa.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
V.Dzhordzhadze1 Nosecone Calorimeter Simulation Vasily Dzhordzhadze University of Tennessee Muon Physics and Forward Upgrades Workshop Santa Fe, June 22,
TRT active gas leak repairing F. Perez, C. Degeorge, S. Katunin, I. Zhukov, V. Myalkovskiy, S. Konovalov, A. Romaniouk, H. Danielsson, A. Catinaccio, K.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
WEEK 1 You have 10 seconds to name…
Name _____________________________________________ Week of__________________ Find the matching stamp and stamp your letter in the box.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
Update on FMS Repair STAR Management Meeting: Oct Stephen Trentalange.
The Cell Cycle Cell Division.
P3_Physicstatements. To experience the maximum force the wire needs to be Bar magnets are permanent magnets, they have 2 poles and they create magnetic.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
The reading is 7.38 mm. The reading is 7.72 mm.
Repair of MCWV magnets (TT84 – M2). Works on three magnets : MCWV 693, MCWV 697, and MCWV 701 and the associated XABS Cause of the repair : XABS jam into.
SOC 110 Week 1 Individual Group Communication Competencies Survey and Summary Complete the University Material: Group Communication Competencies Survey.
LDR 531 Week 3 Summary R-531/LDR-531-Week-3-Summary For more details
HMS Status Steven Lassiter Jan 20, 2017.
CLAS12 Forward Tracking: Status and Challenges
Technical Design for the Mu3e Detector
Upgrade of the scintillator testing station in Prague
FMS Update Refurbishment for Run15
Consequences of warming-up a sector above 80 K
New SPS liners: the 2009 spring collection
Hire Toyota Innova in Delhi for Outstation Tour
Stephen Trentalange STAR Upgrade Workshop June 11, 2012
FMS Readiness for Run 11 Stephen Trentalange.
Magnetic Force on a Current-Carrying Conductor
HCAL HV splice box.
FMS Repair Work: Summary
Status of FMS Refurbishment
Microphones and Their Role in Radio Production
SksMinus status 14 HB meeting 2008/10/16 白鳥昂太郎.
Hall C SHMS & Configuration Status
4.1 Cell Biology Lesson 4.
Divide the paper into three sections.
Limited Streamer Tube Project Summary
Strengths Explorer Naviance Survey
Chapter 5 Section 4 Factoring Trinomials.

Difference between 3 COF and 6 COF Open cells in 22” Segment
Fig. 5. Serial follow-up sellar MRIs after treatment
Pole Position Student Points Time
A B C D.
SksMinus status 03 HB meeting 2008/5/02 白鳥昂太郎.
Presentation transcript:

FMS Repair Work: Summary Restacking work nearly completed Small Cells: 100% complete (476/476) Large Cells: 73% complete (572/788) Re-cabling 100% complete Survey Completed Reconstructing magnetic shielding/light-tight box Next week: testing of cable map for HV & signals Gluing

Stacking Nearly Complete Dmtri Kalinkin Grant Webb Sam Heppelmann Ivan Esteban Mriganka Mondal

Problems 216 Large Cells Left to complete 34 old FMS Cells (216-34=182) 40-50 from PSU next week (182-50=132) 12 bases available (132-12=120) Need 10 magnetic shields Cabling/Stacking 1 week work Movement of pole pieces damaged fibers/ethernet Noticed cracking in single small lead glass/north side North/South -7mm difference