Round 1 Debrief - PM What worked? What didn’t work?

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

Lean Systems 1. Some history After WWII the US population grew faster than before. The growing population lead to a high demand for goods and services.
Here we continue in the chapter on Lean Systems
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Vandal Boat Factory Simulation
OPSM 301 Operations Management Class 25: Lean production Toyota Manufacturing System Ch Koç University Zeynep Aksin
Lean Operations (JIT) Module
Beni Asllani University of Tennessee at Chattanooga
Just-In-Time “Eliminate Waste”.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Round 1 Debrief - PM What worked? What didn’t work? – Bottleneck at folding – Bottleneck at shipping and inspection – Inspection: sale height, stamping.
CHAPTER 14 Just-In-Time Systems.
JIT and Lean Operations
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Implementation of Lean at Rheem Manufacturing Presenter Dr. Joan A. Burtner Associate Professor Industrial and Systems Engineering Mercer University School.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Candid Comparison of Operational Management Approaches James R. Holt, Ph.D., PE, Jonah-Jonah Washington State University-Vancouver Engineering Management.
ISQA 459 Mellie Pullman 1.  JIT can be defined as an integrated set of activities designed to achieve high-volume production using minimal inventories.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. JIT and Lean Operations.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Lean Production - Objectives
Just-In-Time & Lean Systems
LEAN system.
JIT and Lean Operations
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
Round 1 Debrief - AM What worked? What didn’t work? – Inspection standards missing – Rework missing proper tooling – Bottleneck at inspection – Shipping.
Just-in-Time and Lean Systems
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
Managing Processes and Capabilities CHAPTER THREE.
© 2007 Pearson Education 7- 1 Managing Quality Integrating the Supply Chain S. Thomas Foster Chapter 7 Internal & External Process Simplification 09/25.
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
1 Slides used in class may be different from slides in student pack Chapter 12 Lean/Just-in-Time (JIT) Production  JIT Defined  The Japanese Approach.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Lean Production.
13-1 Learning Objectives  Explain what is meant by the term lean operations system.  List each of the goals of JIT and explain its importance.  List.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Purpose: To help demonstrate the lean principles Time: 1 hour Airplane Exercise.
Implementation of Lean at Rheem Manufacturing
Lab #4: Pull and Perfection MG/IE 3400 – Production System Design.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
Production and Operations Management: Manufacturing and Services
EMBA-2, BUP EO Just-in-Time / Lean Production.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 JIT and Lean Operations.
Round 1 Debrief - AM What worked? Thorough inspection process Kitter and production scheduler always on time What didn’t work? Bubba wasn’t available to.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Chapter 27 Cost Management for Just-in-Time Environments
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Lean Manufacturing Basic Overview XYZ Company.
Inputs and Outputs to Aggregate Production Planning
Introduction to Lean Emily Varnado.
Pull Production/ Just In Time
Manufacturing Accounting
IENG 451 / 452 MUDA (Waste): Waste’s Impact on Systems
Kanban Production Just in time Systems
Chap 10 Learning Objectives
Round 1 Debrief - PM What worked? What didn’t work?
Just-In-Time and Lean Production
Manufacturing Planning
Productivity Improvement.
Round 1 Debrief - PM What worked? What didn’t work?
Process Improvement Strategies Takt Time Future State Value Stream Map
Chapter 12 Lean Production. Chapter 12 Lean Production.
讓價值流『精實』 消除浪費.
Implementation of Lean at Rheem Manufacturing
Presentation transcript:

Round 1 Debrief - PM What worked? What didn’t work? division of folding labor What didn’t work? inspection was slow folding was a bottleneck (esp fold 2) time spent transporting material workers were waiting while others were finishing batch re

Changes for Round 2 Consider the following: Factory Layout Oven must remain separated Place folding operations adjacent to each other Point of Use Storage (POUS) Fold 1 can grab paper Line Balancing Send production schedule to Fold 1 Have only one worker at oven and one stamper Evenly distribute folding operations to match Takt time Poke-Yoke, Quality at the Source Identifying and controlling quality problems is more difficult in parallel operations Rework at the source

Round 2 Debrief - PM What worked? What didn’t work? Fold table seemed like a work cell What didn’t work? At each station you need to have visual queue to determine what you need to do and when to do it

Changes for Round 3 Consider the following: Factory Layout Pull System, Kanban Use silver and gold sheets as Kanban cards (place boats on top of each sheet) Set Kanban of 2 silver and 2 gold How many boats to store in warehouse Continuous Flow and Supermarkets Place Poke-Yoke, Quality at the Source Continue with inspection at each station

Round 3 Debrief - PM What worked? What didn’t work? Pull system Less stressful Less late orders Know what you’re supposed to make You know you’re working on what’s selling Easier to see production status Areas for improvement? Kanban size adjustments More in inventory (4 to 6 or 8) Assembly layout adjustments