Liaison to CableLabs January 2003 Update

Slides:



Advertisements
Similar presentations
Instrumentation and Measurement Chapter IEEE Central Texas Section Fall Planning Meeting August 28th, 2010 San Marcos, TX.
Advertisements

© 2006 Cisco Systems, Inc. All rights reserved. Implementing Secure Converged Wide Area Networks (ISCW) Module 2: Teleworker Connectivity.
January 2008 T. M. Kurihara, Chair, IEEE P1609Slide 1 doc: IEEE p Submission IEEE DSRC Application Services (P1609) Status Report.
Doc.: IEEE /0033r0 Submission January 2004 Y. Inoue, et. al., NTTSlide 1 Japanese Frequency Regulations Related to TGn Functional Requirements.
Proposal for device identification PAR. Scope Unique per-device identifiers (DevID) Method or methods for authenticating that device is bound to that.
Doc.: IEEE /404 Marketing Report November 2000 Al Petrick, ParkerVisionSlide 1 Ad-Hoc Marketing StudyGroup Report Al Petrick, Chair.
Doc.: IEEE /243r0 Submission May 2001 Slide 1Steve Shellhammer, Symbol Technologies IEEE P Working Group for Wireless Personal Area Networks.
September 2002 Ophir, Texas Instruments Slide 1 doc.: IEEE /621r0a Submission Forward Compatibility Hooks for h Lior Ophir Texas Instruments.
September 2002 Ophir, Texas InstrumentsSlide 1 doc.: IEEE /623r0a Submission Forward Compatibility Hooks for h Part Two Lior Ophir Texas.
Doc.: IEEE /027 Publicity Report January 2001 Al Petrick, ParkerVisionSlide 1 Ad-Hoc Publicity Group Report Al Petrick.
January 2003 Ophir, Texas InstrumentsSlide 1 doc.: IEEE /111r0a Submission Extending TGh Mechanisms to 4.9GHz and 5GHz Band in Japan (and getting.
ITE Hirakjyoti Nath Class 7
DOCSIS® 3.1 CPE Certification Process Update
HomePlug Overview and Motorola Status
Task Group G Report January 17, 2003
Liaison Report Date: Authors: November 2009
Wi-Fi Alliance Liaison Update
Simulation Metrics, & Criteria Ad Hoc Chairs Perspective Jan. 2001
GeoMesh Blockchain Networking - Slide Presentation
Liaison to CableLabs July 2003 Update
MMAC Update November 2003 Yasuhiko Inoue NTT November 2003
WNG SC Closing Report IEEE , St Louis, MO March 11-15
PCF Model Progress Update Jan. 2001
TGt/WNM Collaboration TGt Performance to be WNM managed
فرایند تسهیلگری در مددکاری جامعه ای
Purpose Top-down approach for TGh from D1.1 to D2.0
Liaison with CableLabs September Update
Multicast Replay Detection Fred Stivers, Texas Instruments
Liaison with CableLabs July Update
Current Status and Next Steps
Month 2000 doc.: IEEE /xxx January 2001
Wi-Fi Alliance Liaison Update
September 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, September 2002 Date.
Japanese Frequency Regulations Related to TGn Functional Requirements
MMAC T71 Ad hoc WG Liaison Report March 2004
Mika Kasslin, TGh chair January 19, 2001
IEEE Liaison to CableLabs
2010 Dallas Liaison Report from
Task Group G Report March 10, 2003
MMAC T71 Ad hoc WG Liaison Report May 2004
RR-TAG Liaison Report January 2008 IEEE
Liaison to CableLabs March 2003 Update
Multicast Replay Detection Fred Stivers, Texas Instruments
Multicast Replay Detection Fred Stivers, Texas Instruments
MMAC T71 Ad hoc WG Liaison Report November 2003
RR-TAG Liaison Report July 2008 IEEE
UWB Spectrum Allocations
Japanese Frequency Regulations Related to TGn Functional Requirements
Liaison to CableLabs November Update
3GPP Liaison Report Date: Authors: May 2012 May 2012
Liaison with CableLabs September Update
IEEE Liaison Report for
Task Group 4 Low Rate WPANS Opening Report
Igal Kotzer, General Motors
IEEE Liaison Report for
Wi-Fi Alliance Liaison Update
Section Communications IEEE Central Texas Section Spring Section Meeting January 25, 2014 San Marcos, TX 1.
FEC Ad Hoc Group Activity Update
TGaj Editor Report for LB226
Task Group G Report January 17, 2003
TGh Wednesday Report Mika Kasslin Nokia January 2001
The ‘Managed Communication’ Space
Wireless LANs 5GHz Worldwide Allocation WLAN DIM
Greg White ITU-T Study Group 9 CableLabs
The ‘Managed Communication’ Space
JTC1 Ad Hoc November Closing
Clause Comment# 775,778,1558,1559 Resolutions
Liaison Update Al Petrick November 2000 Al Petrick, ParkerVision
Presentation transcript:

802.11 Liaison to CableLabs January 2003 Update Month 1998 doc.: IEEE 802.11-98/xxx January 2003 802.11 Liaison to CableLabs January 2003 Update Lior Ophir Texas Instruments Broadband Communications in Israel Herzlia, Israel lior.ophir@ti.com L. Ophir, Texas Instruments

Outline Liaison Purpose CableHome Project Status Next Steps January 2003 Outline Liaison Purpose CableHome Project Status Next Steps L. Ophir, Texas Instruments

January 2003 Purpose Coordinate the use of 802.11 WLANs in DOCSIS cable modem systems Method Understand MSO needs Leverage 802.11 capabilities to meet needs of MSOs Introduce MSO needs in 802.11 discussions L. Ophir, Texas Instruments

CableHome Project Status January 2003 CableHome Project Status First CableHome1.0 certification wave completed (CW24) - 12/20/02 2 residential gateways received CableHome1.0 certification No WLAN inside CW25 scheduled for 1/27/03-4/4/03 L. Ophir, Texas Instruments

Next Steps Follow CableHome progress January 2003 Next Steps Follow CableHome progress Update CableHome team on 802.11 progress and status Update 802.11 on CableHome progress and status Inputs are welcome lior.ophir@ti.com L. Ophir, Texas Instruments