31/03/2017 Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – 20-21 September 2012 Cooperation in crisis and contingency situations Asli.

Slides:



Advertisements
Similar presentations
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Advertisements

1 Welcome Safety Regulatory Function Handbook April 2006.
1 Regulation. 2 Organisational separation 3 Functional Separation.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
The Implementation Structure DG AGRI, October 2005
SIP/2012/ASBU/Nairobi-WP/19
ICAO AVIATION SAFETY PROGRAMMES
Global ATM Operational Concept
Presentation to the ICAO IVATF Montréal, 27 th – 30 th July 2010 EUROCONTROL/CFMU VOLCANIC ASH CRISIS REPORT European Organisation for the Safety of Air.
Overview of the interoperability Regulation
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Foreign Air Operator Validation & Surveillance
System of Systems (DRAFT) To be approved by the ICAO Council
IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSVÖTN European Organisation for the Safety of Air Navigation Žarko SIVČEV EUROCONTROL.
Letter of Intent Sarajevo, April CAAsANSPs RCC ICAO EURO CONT ROL TAIEXEC.
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
GENSPACE Air Traffic Management
© EUROCONTROL 2012 – Network Management Operations Centre (NMOC/CFMU) ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS) Hans Koolen EDITION 12/11/2012 WHY.
The European Organisation for the Safety of Air Navigation dynamic Demand Capacity Balancing WP Marcel RICHARD Expert ATFCM Operational Specifications.
ENHANCED TACTICAL FLOW MANAGEMENT SYSTEM (ETFMS)
Moving Towards an Integrated ASM/ATFCM/ATS Approach
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
FAA / Eurocontrol TFM/CDM Technical Interchange Meeting
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Traffic and Capacity Performance Summer 2008 Outlook PC/29 – 9 May 2008 Item 3.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Addition Facts
Civil-Military coordination in France
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
EMS Checklist (ISO model)
Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Network Management Operational Performance Enhancements Razvan BUCUROIU.
The European Organisation for the Safety of Air Navigation Network Management functions Evolutions in SESAR WP7 and WP13 Moving Towards an Integrated ASM/ATFCM/ATS.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
The European Organisation for the Safety of Air Navigation ASM Solutions at Network Level ASM / ATTFCM / ATS Workshop EUROCONTROL HQ September 2012.
Volcanic Ash Crisis 2010 Seminar Belgrade, 7 th September 2010 European Organisation for the Safety of Air Navigation Brian FLYNN EUROCONTROL/CFMU Network.
Nicky Cooper Head Network Operations Management
25 August 2014Page 1 Civil Military Cooperation in Enhancing operations Asia and Pacific Regional Sub-Office 2014 BEIJING, CHINA; 30 JUN-11 JUL 2014.
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
Ensuring a 'Flexible Use of Airspace'….
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Operational requirements for ASM systems Giuseppe Acampora EUROCONTROL.
The European Organisation for the Safety of Air Navigation MILO Military Liaison Officer in NMOC Civil-Military Cooperation 20 September 2012 Support function.
ASM Dimension in Free Route Airspace Catalin Lepadatu EUROCONTROL DNM/COO/NOM/OPL Civil-Military Workshop September 2012.
Free Route Airspace in DK/SE FAB
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
MAMA - Network Project WP 7. MAMA-AWARE Coordinated by UNEP/MAP (MB 11) – MED POL Unit.
The European Organisation for the Safety of Air Navigation AIRM Review Forum AIRM Status Report.
Addition 1’s to 20.
25 seconds left…...
Week 1.
1 Ensuring a 'Flexible Use of Airspace'…. ICAO EANPG FUA Task Force Paris, May 2008 EUROCONTROL Airspace, Network Planning & Navigation Division.
Traffic Management and FUA integration
Ohio Statewide Automated Child Welfare Information System OCF ELC January 19, 2006 SACWIS.
Peter Matern Head of ADM Unit 30/01/2014
Volcanic Ash Crisis 2010 Seminar Belgrade, 7 th September 2010 INFORMATION SHARING IN VA CRISIS European Organisation for the Safety of Air Navigation.
Regional Cooperation Activity JOINT MEETING OF THE ADVISORY COMMITTEE AND THE EXECUTIVE BOARD Nicosia 17 Jan 2014.
Regional ATFM in Europe
DEALING WITH FUTURE ASH EVENTS European Organisation for the Safety of Air Navigation Žarko SIVČEV EUROCONTROL/CFMU Network Operations.
The European Organisation for the Safety of Air Navigation Brian Flynn Directorate of Network Management Head Network Operations unit EUROCONTROL What.
The European Organisation for the Safety of Air Navigation V & V Some lessons learned in Europe FAA V&V Symposium, Atlantic City, October 2010 Nigel.
Žarko SIVČEV EUROCONTROL Directorate Network Management
Žarko SIVČEV EUROCONTROL/CFMU Network Operations
Ensuring a 'Flexible Use of Airspace'….
EACCC and NM Activities
Presentation transcript:

31/03/2017 Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – 20-21 September 2012 Cooperation in crisis and contingency situations Asli OCAL -DNM- Francois CERVO -DSS- Enter here your Presentation Title

EACCC Overview

Network Disruptions Management 31/03/2017 Network Disruptions Management Network Disruptions Management Enter here your Presentation Title

EACCC Process In case of crisis, the EACCC Chairman will contact: 31/03/2017 EACCC Process In case of crisis, the EACCC Chairman will contact: the relevant State Focal Points, any organisation/agency that may provide information/help (eg. VAAC, EC Radiation Protection unit, NATO, External CAAs) EACCC is convened via meeting or teleconference, A crisis mitigation policy is discussed, agreed and approved by EACCC, Information is disseminated to relevant parties, When the crisis is resolved, EACCC is deactivated, A debriefing EACCC session is held to address the lessons-learned and remaining actions. Network Disruptions Management Enter here your Presentation Title

Network Manager’s Role 31/03/2017 Network Manager’s Role During crisis: NM, with the support of EACCC, will coordinate the response, mitigate the impact, and escalate issues to appropriate bodies. EACCC composition shall be extended to include impacted state representatives and other operational contacts where deemed necessary by NM. The State Focal Points will be the link between their respective local Crisis Structures and the EACCC. During normal times: NM will lead and coordinate the follow-up actions/lessons-learned stemming from previous crises. EACCC members shall provide feedback concerning these actions to NM keeping NM always in the loop. NM and EACCC will conduct exercises to maintain the high level of preparedness for possible crisis events. Network Disruptions Management Enter here your Presentation Title

Practical Example and Lessons Learned

ATM AND THE LIBYAN OPERATIONS 31/03/2017 31/03/2017 ATM AND THE LIBYAN OPERATIONS Overview and Impact Libya Malta European Network Users Feedback Libyan Crisis Management Process Chronology Coordination Process Network Manager role and concerns Network Disruption Management Process Overview Lessons Learned Potential Way Ahead Network Disruptions Management 7 Enter here your Presentation Title 7

LIBYA – Airspace Closure 31/03/2017 31/03/2017 LIBYA – Airspace Closure March 2011 October 2010 Concern: No Fly Zone covering only a part of Libyan FIR Network Disruptions Management 8 Enter here your Presentation Title 8

MALTA : IMPACT Regulations: Nil Delays: Nil Capacities: 31/03/2017 31/03/2017 MALTA : IMPACT Regulations: Nil Delays: Nil Capacities: - Before March 10 : 55-75 - March 10 / April 06 : 36-39 - After April 06 : 55-75 Network Disruptions Management 9 Enter here your Presentation Title 9

EUROPEAN NETWORK IMPACT 31/03/2017 31/03/2017 EUROPEAN NETWORK IMPACT Global Impact : No major network impact Delays: No* Regulations: No Capacities / ATC Re-routings IFPS workload Network Disruptions Management 10 Enter here your Presentation Title 10

EUROPEAN NETWORK IMPACT 31/03/2017 31/03/2017 EUROPEAN NETWORK IMPACT Specific Situation : Greek industrial unrest Staffing / Reduced capacities High delays Rerouting Adjacent sectors overload Combined with Libya Disruption on the Network KANAR AMIBO Network Disruptions Management 11 Enter here your Presentation Title 11

USERS IMPACT 31/03/2017 31/03/2017 Network Disruptions Management 12 Enter here your Presentation Title 12

USERS IMPACT AOs FEEDBACK - Cost - Fuel (2500T AF) 31/03/2017 USERS IMPACT AOs FEEDBACK - Cost - Fuel (2500T AF) - Payload limitation - Schedule - Charges EDDM Munich DNMM Lagos Nigeria FAJS Johannesburg LGAV Athene LTBA Istanbul OLBA Beyrouth Network Disruptions Management Enter here your Presentation Title

USERS IMPACT Specific Situation: (aggravated by Greek situation) 31/03/2017 31/03/2017 USERS IMPACT Specific Situation: (aggravated by Greek situation) Mileage 200nm Fuel Flight time 20/30’ Schedule Delay 3hrs Compensation requests? Network Disruptions Management 14 Enter here your Presentation Title 14

CHRONOLOGY 17-23 March REACTION 24-30 March TRANSITION 30 March > 31/03/2017 CHRONOLOGY MALTA Tactical Management Contacts Deconfliction FPL Airspace ECTL Support Info 17 March U.N FP L Routes Corridors Maps Coordination Humanitarian Flights NATO Procedure Airspace CAOC/JACC 19 March STRIKES 17-23 March REACTION 24-30 March TRANSITION 30 March > COORDINATION Civil-Military ATM Coordination Meeting Teleconf.(OACI) Network Disruptions Management 15 Enter here your Presentation Title

COORDINATION PROCESS 1- Coordination at local level NATO MALTA HQ 31/03/2017 COORDINATION PROCESS 1- Coordination at local level MALTA NATO HQ RAMSTEIN EUCARF ICAO FAA NATO EUROCONTROL MALTA ITALY GREECE DECONFLICTION Airspace re-organized (E4,Routes) FPL Info Procedures Points of contact COALITION CAOC 5 COALITION? 2- Coordination at strategic level CFMU GREECE ITALY To Support and enforce decisions To implement them To prepare long term actions (SPINS…) Civil-Military ATM Coordination Meeting Teleconferences (OACI Canada) Network Disruptions Management 16 Enter here your Presentation Title

EUROCONTROL(NM): ROLE and CONCERNS 31/03/2017 EUROCONTROL(NM): ROLE and CONCERNS Support – Network Management Coordination Airspaces implementation (direct Routes) Flight Planning DCT Route Utilization - Rerouting Authorized Flights – Procedures / SPINS Manual Process (RAD) ATFM exemption and protection procedures OAT / GAT MILO Flight Plan (Coordination UK, Fr, US, LEMO) Airspace requests (Greek direct Routes) Info promulgation Return to normal situation in Libya Information Malta NOTAMs – Libyan AIP NM airspace management aeronautical information and charting group - Libya Maps PIBs /AIMs NOP / D-1 Conference Network Disruptions Management 17 Enter here your Presentation Title

31/03/2017 LESSONS LEARNED WHAT? - ATM interface has to be included in Crisis Management WHEN? - Each different crisis period has to be addressed Crisis Preparation Military Operations / Network Disruption Return to normal operations HOW? - An ATM coordination cell has to be established for: Coordination with NM Civ-mil Coordination at both local and regional levels Whatever the operation, It is important to have an initial contact point with the coalition « Ops leader » to enforce the necessary ATM Coordination. Network Disruptions Management 18 Enter here your Presentation Title

WAY AHEAD “ATM crisis management handbook” 31/03/2017 WAY AHEAD “ATM crisis management handbook” Notification / Contact with NM (Inputs for Civ-Mil coord. rules in NM procedures) ATM Impact assessment – Level of disruption Point of Contact (HQ/JFACC / NM / States / ATCs …) Mitigation measures elaborated and coordinated Implementation –adaptation – coordination at tactical level (ATC / CAOC) Transition to normal situation– Measures lifted / support to normal operations Mil representatives DNMC/EACCC FAB – ACCs – Airfields Procedures harmonization should facilitate this coordination (FPL, EUROAT…) Network Disruptions Management 19 Enter here your Presentation Title