EVLA Receivers PDR Transition Planning Author Daniel (Mert) Mertely

Slides:



Advertisements
Similar presentations
14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Advertisements

Lisa LockeEVLA Front-End CDR – S, X & Ku-Band Receivers April 24, EVLA Front-End CDR Plans for S (2-4), X (8-12) & Ku (12-18 GHz) Receiver Bands.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
AuthorMeeting Title Date 1 EVLA Systems PDR Receivers/Feeds Daniel (Mert) MertelyEVLA System PDR:Receivers/Feeds 28 November, 2001.
Transition Converter " Supply signals from new antennas to old correlator. " Will be discarded or abandoned in place when old correlator is turned off.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Monitor & Control and Cryogenics.
Chuck KutzEVLA Front-End CDR – Low Frequency Receivers April 24, EVLA Front-End CDR EVLA Low Frequency Receiver Capability.
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
R. HaywardEVLA Feeds CDR - System Requirements 17 Feb EVLA Feeds CDR System Requirements.
James Robnett EVLA M&C Hardware PDR March EVLA M&C Hardware PDR Voice Communications.
Upgrade of the VLBA C-Band Feed & Receiver Design Review Presented by S durand Designed by Bob Hayward and: Sivasankaran Srikanth (Feed Design) Hollis.
Jim RuffAntennas & Feeds PDR 2/12/02 1 Antennas & Feeds Mechanical Design Feed Cone Feed Mounting Horn Fabrication.
Polarimetric Solid State Radar Design for CASA Student Test Bed
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
Dan MertelyEVLA Front-End CDR – C-Band Receiver April 24, EVLA Front-End CDR C-Band (4-8 GHz) EVLA Receiver.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Q, Ka, K, Ku & X-Band Receivers Backup Slides.
Dan MertelyEVLA Feeds CDR 17 February RFI Concerns Relating to EVLA Feeds Dan Mertely.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Leon Abeyta LO-IF Engineer EVLA LO-IF PDR 22 January EVLA LO/IF Central and Antenna Reference Generation.
Author EVLA Feed & FE PDR 12/13 Feb, EVLA Receivers PDR RFI Issues Daniel (Mert) Mertely.
Paul Harden VLA Veteran EVLA LO-IF PDR 22 January EVLA IF/LO EVLA “LOW BAND” CONVERTERS For 4/P/L/S/C and Ku Bands.
Author EVLA Feed & FE PDR 12/13 Feb, EVLA Receivers PDR (4m, P,) L, S, C BAND RECEIVERS Daniel (Mert) Mertely.
Travis Newton LO-IF Engineer EVLA LO/IF PDR January IF Downconverter Travis Newton LO/IF Engineer.
Q, Ka, K, Ku & X-Band Receivers
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Hot Off the Press Q, Ka, K-Band Cost Savings.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
RF TRANSMITTER MODULE Radio frequency (RF) transmitters are widely used in radio frequency communications systems. With the increasing availability of.
Existing VHF Systems: Already a problem
Future LBO Developments
Matt Morgan National Radio Astronomy Observatory
Concepts for a Next-Generation VLBA
EVLA Availability - or - When Can I Use It?
EVLA Front-End CDR – EVLA Front-End Schedule
EVLA Project Peter Napier
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
Choice of Cassegrain Geometry
DATA TRANSMISSION AND RETRIEVAL
60 GHz Cubicle Wall Reflectivity
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
DATA TRANSMISSION AND RETRIEVAL
Water Vapor Radiometer
Terry Cotter LO/IF Group Leader
LO/IF Switches Doug Scott
LO/IF System Requirements
EVLA System PDR System Overview
Rick Perley National Radio Astronomy Observatory
EVLA M/C Software PDR, 14 May 2002
Terry Cotter LO/IF Group Leader
EVLA Advisory Committee Meeting
EVLA Advisory Committee Meeting System Status
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Gustaaf van Moorsel September 9, 2003
Background Information P.Napier
EVLA Racks Bins and Modules PDR
AM-7026 Down Converter-Receiver
Correlator Growth Path
EVLA Advisory Committee Meeting System Status
EVLA Advisory Panel Mtg. System Overview
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

EVLA Receivers PDR Transition Planning Author Daniel (Mert) Mertely EVLA Feed & FE PDR 12/13 Feb, 2002

Requirements All current bands available before, during, and after transition. Receiver performance not degraded. Need to test LO, M&C, & digitization/data transmission (FO) system early, on prototype. Compressor capacity problem—Get rid of 1020 frig. Need space in vertex room—Get rid of A-rack. Author EVLA Feed & FE PDR 12/13 Feb, 2002

Transition Planning 1) Insure inter-operability between old FE & new FH, LOs, M&C, & IF systems. 2) Early assembly of wide-band K &/or Q band receivers to test out entire system. 3) C & U bands high priority. Author Mert EVLA Feed & FE PDR 12/13 Feb, 2002

T-Plan: Inter-operability IF converter module part of EVLA sys for < X-band. Minor RX mods will allow attachment to new feeds. M&C conversion from current bus to FO already necessary. Author EVLA Feed & FE PDR 12/13 Feb, 2002 Mert

T-Plan: Inter-operability II Current L-band (1340 – 1730 MHz), (with only modified phase shifter) will bolt-on to new FH & work in EVLA antenna. Current X-band (8 – 8.8 GHz) will bolt on to new feed & work in EVLA antenna. K & Q will need new wide-band mixers to handle both the current C & the EVLA X band IFs (planned). Need new LO chain (mixer, amp) for high-side injection (planned). Author EVLA Feed & FE PDR 12/13 Feb, 2002

Early K & Q EVLA “transition 7” K-band receivers include wide frequency mixers—Early prototypes. Allows test of LO & FO data transmission system early. May/may-not include all 4 channels. Author EVLA Feed & FE PDR 12/13 Feb, 2002 Mert

“Early” C & U C & U band receivers needed early to avoid A-rack space complications & extra compressor capacity requirements. C-band has a VLBA as “prototype”. U-band “scaled” from current VLA K-band. U-band might slip if schedule problems develop (least harm). Author EVLA Feed & FE PDR 12/13 Feb, 2002 Mert

FE & Feed Delivery Schedule:Prototypes Author EVLA Feed & FE PDR 12/13 Feb, 2002 Hayward/Szpindor

FE & Feed Delivery Schedule:Production Author EVLA Feed & FE PDR 12/13 Feb, 2002 Hayward/Szpindor

EVLA Receiver Production Schedule -------------------------------------------------------------------------------- | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | |--------+--------+--------+--------+--------+--------+--------+--------+--------| Modify Antennas | | >--1-7--->--8-14-->-15-21-->-22-28--> | | | | | | | | | | | | | Build/Install K | | >-2->---7---->---7---->---7---->---7----> | | | Build/Install Q | | >-2->---7---->---7---->---7---->---7----> | | | Build/Install C | | >---7---->---7---->---7---->---7---->-2-> | | | Build/Install U | | >---7---->---7---->---7---->---7---->-2-> | | | Build/Install L | | | | >-1->---3---->---3---->---8---->----8--->----7---> Build/Install X | | | | >-1->---3---->---3---->---8---->----8--->----7---> Build/Install S | | | | >---3---->---3---->---7---->----9--->----8---> Build/Install A | | | | >---3---->---3---->---7---->----9--->----8---> --------+--------+--------+--------+--------+--------+--------+--------+-------- No. of Upgraded Rx’s 4 14 14 14 14 0 0 0 No. of New Rx’s 0 14 16 26 26 34 36 30 ---- ---- ---- ---- ---- ---- ---- ---- Total per year 6 30 32 40 40 34 34 30 Author EVLA Feed & FE PDR 12/13 Feb, 2002 Hayward

EVLA Amplifier Production Schedule -------------------------------------------------------------------------------- | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | |--------+--------+--------+--------+--------+--------+--------+--------+--------| Sub- Antennas | | >--1-7--->--8-14-->-15-21-->-22-28--> | | | total | | | | | | | | | | ----- K-Amps | | |2 2 2 |2 2 2 |2 2 2 |2 2 2 | | | | = 24 Q-Amps | | |2 2 2 2 |2 2 2 2 |2 2 2 2 |2 2 2 2 | | | | = 32 | | | | | | | | | | C-Amps | |P4 4 |4 4 4 4 |4 4 4 4 |4 4 4 4 |4 4 4 4 | | | | = 72 U-Amps | |P4 4 |4 4 4 4 |4 4 4 4 |4 4 4 4 |4 4 4 4 | | | | = 72 L-Amps | | |P4 2 |2 2 2 |2 2 2 |2 2 2 |4 4 4 4 |4 4 4 4 |4 4 4 4 | = 72 X-Amps | | |P4 2 |2 2 2 |2 2 2 |2 2 2 |4 4 4 4 |4 4 4 4 |4 4 4 4 | = 72 S-Amps | | | |P4 2 |2 2 2 |4 4 4 |4 4 4 4 |4 4 4 4 |4 4 4 4 | = 72 A-Amps | | | |P4 2 |2 2 2 |4 4 4 |4 4 4 4 |4 4 4 4 |4 4 4 4 | = 72 |--------+--------+--------+--------+--------+--------+--------+--------+--------| --------+--------+--------+--------+--------+--------+--------+--------+-------- Prototypes 0 8 8 8 0 0 0 0 0 Production 0 8 50 62 70 82 64 64 64 ---- ---- ---- ---- ---- ---- ---- ---- ---- Total/year 0 16 58 70 70 82 64 64 64 488 Author EVLA Feed & FE PDR 12/13 Feb, 2002 Hayward