New England Resource Adequacy

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

Electricity Industry The Potential Effect of Locational Marginal Pricing on Renewable Resources for Environmental Issues in Energy NECPUC Annual Symposium.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Demand Response in Connecticut Presented by: Bob Laurita ISO New England December 2, 2004.
Resource Adequacy in PJM
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Connecticut’s Energy Future Connecticut Energy Advisory Board Conference Hartford, Connecticut December 2, 2004 Kevin Kirby Vice President, Market Operations.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Demand Response in Midwest ISO Markets February 17, 2008.
The Council of State Governments Eastern Regional Conference Gordon van Welie, President and CEO, ISO New England August 16, 2010 Portland, Maine.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Transmission Planning Informational Workshop Montpelier, VT September 19, 2005 Allocating the Cost of New Transmission in New England Stephen J. Rourke.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
The Australian Market Evolution Dr Brian Spalding Chief Operating Officer NEMMCO.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Illinois Wholesale Market Update December 10, 2003.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Connecting the Dots in New England: NEPOOL’s IMAPP Initiative
Aligning the Gas and Electric Markets: EDF Solutions
Energy Market Liberalisation: UK Experience and Future Challenges Bulgarian Energy Forum, Sofia, 8 October 2013 Sue Harrison Head of European Energy Markets.
Regional Greenhouse Gas Initiative
California Product Offerings
Restructuring Roundtable March 24, 2017 Boston, MA
Regional Transmission Organizations
Massachusetts Electric Restructuring Roundtable
Transmission: the Critical Link
Massachusetts Electric Restructuring Roundtable
The Future of Demand Response in New England
Michael I. Henderson ISO New England Inc.
Draft 2013 Energy-Efficiency Forecast
December 9, 2005 Allison DiGrande, External Affairs Department, ISO/NE
Cold Snap Task Force Update
Transmission As Enabler
Benefits of New England’s Proposed Capacity Market
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
EVP, Chief Administrative Officer
Locational ICAP in New England
Market Design in New England
New England Electricity Restructuring Roundtable September 18, 2009
Vice President, Markets Development
Alternative ICAP Proposal
Building A Northeast RTO: A Measured Approach
Restructuring Roundtable Peter D. Fuller February 29, 2008
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Bringing Power from the North
2018 RTEP Report Key Maps, Tables & Figures
Creating Benefits for New England: Putting the Pieces Together
Bringing Power from the North
Gordon van Welie, President & Chief Executive Officer
Wholesale Electricity Costs
LICAP New England Joel S. Gordon PSEG Energy Resources & Trade, LLC
State of Vermont Energy Stimulus Plan
Comments on New England Regional State Committee*
Commissioner Anne C. George
Winter Reliability Program Updated
Creating Benefits for New England: Putting the Pieces Together
10 Years Later: Rethinking the Role of Distribution Utilities
Presentation transcript:

New England Resource Adequacy Massachusetts Electricity Restructuring Roundtable September 23, 2005 Gordon van Welie ISO New England, Chief Executive Officer

ISO New England Overview Real improvements to the region’s electric system Over $1.5B in long-needed 345 kV transmission projects in four states have siting approval Massachusetts, Connecticut, Vermont, Maine Approximately $6B in private investment 30% increase in new, cleaner generation Over 9,000 MW of new generation Significant reductions in regional air emissions Wholesale market efficiencies: Savings  $700M/yr (2000-2004) Congestion cost reductions:  $170M/yr Single, independent point of control over management and outage scheduling of regional transmission system have reduced congestion costs  $40M/yr (2000-2004) © 2005 ISO New England Inc.

Ingredients of Successful Power System 1 Four pillars of a balanced and reliable power system: Supply: Resources to meet peak demand Transmission: Adequate power delivery system Conservation and Demand Response: Incentives for reduced use Market Structure: Accurate price signals to promote efficient operation and investment Comprehensive planning provides a roadmap to achieve the four pillars © 2005 ISO New England Inc.

Resource Adequacy: System Needs Ten-Year Plan

Planning For A Reliable Power System: Regional System Plan (RSP) ISO-led regional system planning process since 2001 Comprehensive assessment of power system needs annually Ten-year planning horizon Information for market responses Regular stakeholder meetings Transmission plan to ensure a reliable system Backstop to market solutions Basis for transmission projects eligible for regional funding Independent analysis informs state siting Process recognized as one of best in nation (US DOE) © 2005 ISO New England Inc.

Recent Operational Experience New, all-time peak demand record set on July 27, 2005 (26,921 MW) Operable Capacity Margin of 739 MW Led to OP4 Actions 1-5, 7-10, and 12 in SWCT Load Relief actions estimated at 220 MW Led to high Real-Time LMPs in NEMA/Boston and CT Highest Saturday peak load on August 13, 2005 (24,038 MW) Had it been a week day, it would have likely been our all-time summer peak Prices driven by: Weather and demand Fuel costs © 2005 ISO New England Inc.

Key Findings – RSP05 Transmission upgrades must be completed on schedule Major 345 kV projects and other upgrades Greater Connecticut is short of resources now under high-demand conditions Additional capacity required to reliably meet system-wide demand as early as 2008, and no later than 2010 Addition of 1,100 MW of incremental quick-start resources needed now (in Boston and Greater Connecticut) to satisfy CT and systemwide needs Without increasing dual-fuel capability of gas-fired capacity, system reliability is at risk Convert 400 MW by winter 2006/7; 250 MW more each year through winter 2008/9; 500 MW more in winter 2009/10 © 2005 ISO New England Inc.

Resource Adequacy: Transmission Solutions

RSP05 Projects in Massachusetts Northeastern Massachusetts (NEMA)/BOSTON 345 kV project under construction Voltage-control issues being addressed North Shore improvements under construction with long-term plans being finalized Projects in other parts of Massachusetts Central Massachusetts Project and Auburn Projects under construction Improvements made to Cape Cod load pocket (2nd Canal-Bourne project) and studies for long-term reliability are underway Springfield and Western MA improvements are needed Reduce Springfield dependencies on single 345kV line and two generators Reduce CT dependencies on Springfield capabilities © 2005 ISO New England Inc.

Transmission Solutions: Status of Major Projects Progress since 2004 18 projects placed in service 36 new projects added 272 projects needed Major 345 kV projects Southwest Connecticut Reliability Project – under construction Southern New England Reinforcement Project – under study NSTAR 345 kV Transmission Project – under construction Northwest Vermont Reliability Project – under construction Northeast Reliability Interconnect Project – permit applications under review 2005 Transmission Project Plan Grand Total: $2.4 - $4.3 Billion © 2005 ISO New England Inc.

Resource Adequacy: Market Solutions

Wholesale Market Plan Goals Efficiently price products and services needed to reliably operate power system Enable efficient short-term consumption and production decisions Ensure sufficient long-run investment decisions Complete the wholesale market design Capacity Market reform Ancillary Services Market Fully integrate demand response Updated Wholesale Market Plan available in October 2005 © 2005 ISO New England Inc.

Criteria for Resource Adequacy Solutions Objectives Retain and attract appropriate resources to ensure reliability in all areas of the region Reduce or eliminate Must-Run contracts that dampen market signals Continue cap on generator offers in energy market that protect against market power Ensure that consumers do not pay for bad investment decisions Ensure resource availability in times of greatest need Encourage customer participation (demand response) © 2005 ISO New England Inc.

New England Needs Action Completion of Transmission Projects Reliability of Fuel Supply Dual fuel capacity in Boston and Connecticut now LNG supplies Assurance of Resource Adequacy Connecticut needs additional resources now Connecticut and Boston need quick-start generation now Region needs new resources between 2008 and 2010 Need market-based, long-term, resource adequacy solution © 2005 ISO New England Inc.