System Requirements for the RASGCIM Amendment

Slides:



Advertisements
Similar presentations
Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Advertisements

LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
IEEE WG Status Report – July 2005
IEEE White Space Radio Contribution Title
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
WRAN Protocol Reference Model(PRM)
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
Performance Evaluation Methods of Inter-WRAN Coexistence Protocols
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
Descriptive Language Usage in TGv
(Presentation name) For (Name of group) (Presenter’s name,title)
TGp Motions Date: Authors: November 2005 Month Year
IEEE P Wireless RANs Date:
TGp Closing Report Date: Authors: March 2006 Month Year
On Coexistence Mechanisms
[Comparison between CDMA Code and Contention-based Access]
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
IEEE WG Opening Report – March 2007
November Opening Report
JTC1 Ad Hoc Mid-week Report
On Coexistence Mechanisms
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
Experimental DTV Sensor
IEEE P Wireless RANs Date:
IEEE WG Opening Report – July 2008
“Comment Status” Definitions
ADS Study Group Mid-week Report
IEEE P Wireless RANs Date:
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
System Requirements for the RASGCIM Amendment
Liaison Report From Date: Authors: Month Year
Beamforming and Link Adaptation Motions
Draft P802.11s D1.03 WordConversion
Questions to the Contention-based Protocol (CBP) Study Group
Advanced Beaconing Schedule and Timelines
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Motions Date: Authors: May 2006 May 2006
RASGCIM Study Group Teleconference 2 Agenda
11k Public Awareness Program
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGr Proposed Draft Revision Notice
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

System Requirements for the RASGCIM Amendment Month Year doc.: IEEE 802.22-yy/xxxxr0 Aug, 2011 System Requirements for the RASGCIM Amendment IEEE P802.22 Wireless RANs Date: 2011-08-08 Authors: Notice: This document has been prepared to assist IEEE 802.22. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.22. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Wendong Hu as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.22 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at patcom@iee.org. Xin Zhang, NICT John Doe, Some Company

Month Year doc.: IEEE 802.22-yy/xxxxr0 Aug, 2011 Abstract This document presents system requirements for Regional Area Smart Grid and Critical Infrastructure Monitoring (RASGCIM) amendment of 802.22-2011 . This requirement document is based on the proposed use cases available in document number 73r2. There are total 8 requirements listed in this document. Xin Zhang, NICT John Doe, Some Company

Aug, 2011 System Requirement #1 The system shall design CPEs with multiple capability levels (e.g., low capability monitoring/sensing CPEs and high capability control/broadband CPEs). Xin Zhang, NICT

Aug, 2011 System Requirement #2 The system shall support communication among CPEs. Xin Zhang, NICT

Aug, 2011 System Requirement #3 The system shall support more than 512 CPEs within a network. Xin Zhang, NICT

Aug, 2011 System Requirement #4 The system shall provide methods to support maximum aggregated data rate up to 180 Mbps (e.g., real time monitoring video compressed by H.264/AVC /MPEG-4 baseline profile, the required data rate are: 14 Mbps - 1280×720@30Hz , 10 Mbps - 720 ×480@30Hz, 4 Mbps - 720 ×480@15Hz, 0.8 Mbps - 320 ×240@36Hz, 64 Kbps - 128 × 96 @30.9Hz). Xin Zhang, NICT

Aug, 2011 System Requirement #5 The system should both support point-to-multipoint and peer-to-peer communications (e.g., point-to-multipoint : smart grid and monitoring, peer-to-peer : emergency broadband). Xin Zhang, NICT

Aug, 2011 System Requirement #6 The system should provide methods of channelization for cost-effective compliance with regulatory spectral mask (e.g. for low-cost implementation of filter in low capability CPEs). Xin Zhang, NICT

Aug, 2011 System Requirement #7 The system should provide mechanisms to save the operating power of CPEs (low capability). Xin Zhang, NICT

Aug, 2011 System Requirement #8 The system should support mechanism to coexist with other systems on the same band. Xin Zhang, NICT