Advancing Digital NOTAM implementation

Slides:



Advertisements
Similar presentations
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Advertisements

1 Welcome and Introduction xNOTAM Workshop #2 Brussels, November 2007 European Organisation for the Safety of Air Navigation.
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Peter Matern Head of ADM Unit 30/01/2014
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
Introduction to Digital NOTAM
AIXM 5.1 implementation experience
By: Date: Federal Aviation Administration U.S. Aeronautical Information Management (AIM) Modernization Update on digital Federal NOTAM System Brett Brunk.
EUROCONTROL’s Efforts with AIXM
Introduction to AIXM. Topics Criticality of AIS information AIM – a “data centric” approach Worldwide interoperability AIXM mission Related developments.
International Civil Aviation Organization AIM - implementation Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi,
European AIS Database (EAD)
Digital AIM Training - Digital NOTAM
1 xNOTAM Trial Presentation xNOTAM Workshop #2 Brussels, November 2007 Item 6 European Organisation for the Safety of Air Navigation.
EUROCONTROL Digital NOTAM Project
Integrating information towards Digital ATM Information Structures - AIXM - Presented By: Eduard Porosnicu, Eurocontrol Date:August 27, 2013.
European AIS Database SIGMA & SDO Data Completeness
AIS/MAP Seminar Kiev May 2003 EUR/NAT Regional Officer AIS/MET Björn Hellroth EUR/NAT Regional Officer AIS/MET Björn Hellroth.
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
Digital Airport Surface NOTAMs. Introduction What are NOTAMs? –Notices to Airmen (NOTAM) are used to alert pilots about temporary changes affecting the.
11 Aeronautical Information Exchange Model (AIXM) / Weather Information Exchange Model (WXXM) Conference Addressing the NextGen Challenge Charles A. Leader.
Aeronautical Data 2-Day Workshop Module: 1 Introduction strategic airspace November 2011.
The European Organisation for the Safety of Air Navigation EUROCONTROL’s Efforts with AIXM AIXM 5.1 XML Developers' Seminar #4 – Mar 2010.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
1 Digital NOTAMs – A new paradigm. 2 Discussion Points NOTAMs – what are they? Recommendations from the AIM Global Congress Components of a digital NOTAM.
1 Digital NOTAM Towards a concept of operations xNOTAM Workshop #2 Brussels, November 2007 Item 2 European Organisation for the Safety of Air Navigation.
Air Operations Division AIM System for ASECNA organisation (17 African countries) Description:  Full AIM solution composed of AIXM / eAIP / Charting /
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
Roadmap Phase 2 EAD & AICM By: Eduard Porosnicu, AIM Expert 7-8 October 2009 ACAC – AIM Workshop.
AIXM - purpose, scope, implementation and future evolution.
The global voice of ATM The Global Voice of ATM CANSO AIM WG Activities Agenda Item - 5: Global strategy/roadmap ICAO AIS-AIM SG3, Montreal, November.
Introduction to the Slovak AIS Augustin Lamprecht, Head of AIS ICAO AIS/MAP IMPLEMENTATION SEMINAR KIEV, MAY, 2003.
Federal Aviation Administration The AIM Modernization Program A strategic overview AIMM Program Office, AJM-336.
AIS-AIMSG/12 Briefing to ANC AIS-AIMSG/12 Briefing to ANC 23 October 2015.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision TECHNICAL & OPERATIONAL COMPETENCE ATS.
AIS-AIMG/1-SN No.6. 19/11/08 AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)
AIS-AIMSG/12 Briefing to ANC 23 October 2015
CANSO AIM WG Activities
Introduction to Digital NOTAM
AIS-AIMG/1-SN No.6.
AIXM 5.1 – Interoperability issues
Workshop on preparations for ANConf/12 − ASBU methodology
Welcome and Introduction
Workshop on preparations for ANConf/12 − ASBU methodology
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
AIM Operational Concept
FIXM – GUFI Manfred Beckmann (SOLITEC)
Digital NOTAM Towards a concept of operations
4 - 8 November 2013 AIM relevant - Assembly conclusions
Workshop on preparations for ANConf/12 − ASBU methodology
AIXM 5.1 – Interoperability issues
ICAO AISAIMSG #8 - Intro 4-8 November 2013
AIXM 5 Development Status
Presented by Eduard Porosnicu, EUROCONTROL
Chapter 5 proposal AIS-AIM SG #8.
Amendment 40 to ANNEX 15 Air Navigation Procedures for AIM Seminar
AIM Global Strategy Air Navigation Procedures for AIM Seminar
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
Digital NOTAM Summary.
Digital NOTAM
Welcome and Introductions
Introduction to Digital NOTAM
Welcome and Introductions
1 Ranjan Senaratne. After studying this session, you will be able to: Explain the responsibilities of the AIS. Identify the users of Aeronautical Information.
Digital AIM Training - Introduction Introduction – day 2
Presentation transcript:

Advancing Digital NOTAM implementation Olga Mashinskaja AIM expert, Estonian Air Navigation Services

Introduction ICAO AIS to AIM Roadmap released 1993 - Estonian NOTAM Office was established as a part of Integrated Briefing Office of Estonian AIS – it is a part of Estonian Air Navigation Services. 1993-2000 – A teletypewriter was used for NOTAM distribution 2000 - start of the first NOTAM Office system 2009 – Estonian AIS started a Project with Frequentis Comsoft to supply advanced AIM system. The heart of the system is based on CADAS-AIMDB Aeronautical Database fully implementing AIXM 5 standard 2012 - a new system for IBOF including NOTAM Office based on Frequentis Comsoft CADAS product suite 2012 - migration to EAD as Data Provider (NOTAM). 2018 – ADQ compliant Work Flow Management system implementation project with Frequentis Comsoft, facilitating NOTAM proposal submission, control, management ICAO AIS to AIM Roadmap released 1st AIXM 5.1 database of Europe operational in Estonia

Need for digital NOTAM Last minute aeronautical information update means “NOTAM” ICAO definition of NOTAM: A notice distributed by means of telecommunication containing information concerning the establishment, condition or change in any aeronautical facility, service, procedure or hazard, the timely knowledge of which is essential to personnel concerned with flight operations ICAO AIS to AIM Roadmap P-21 — Digital NOTAM The digital NOTAM will be defined as a data set that contains information included in a NOTAM in a structured format that can be fully interpreted by a computer system for accurate and reliable updates of the aeronautical environment representation both for automated information equipment and for aviation personnel Instead of creating and maintaining individual text NOTAM with complex release processes, the focus is on the maintenance and integrity of the aeronautical data

Need for digital NOTAM The provision of aeronautical information today is mainly focused on the requirements of pre-flight briefing. The provision of aeronautical information tomorrow will address the requirements of all components of the ATM system for all phases of flight. Amdt 40 to Annex15 Data set updates When temporary changes of short duration are made available as digital data (Digital NOTAM), they should use the same aeronautical information model as the complete data set. Digital NOTAM Event Specification – Increment 1 The Digital NOTAM Event Specification defines the rules for harmonised encoding as AIXM data sets (version 5.1 or later).

Advancing digital NOTAM implementation In 2017 dNOTAM project was started with Frequentis Comsoft. A NOTAM event commonly used by EANS was selected as proof of concept. Further dNOTAM event configurations in preparation. Q-code DNOTAM scenario RTCA SAA.ACT / SAA.NEW RDCA Q-code DNOTAM scenario OBCE OBS.NEW

System Overview Data Originator EANS EUROCONTROL CADAS-AIMDB CADAS-IMS verify, approve or reject create CADAS-AIMDB CADAS-IMS EAD propose ICAO Txt NTM ICAO Txt NTM NOTAM Data reject NTM No NTM No AIXM 5 Data Management ICAO Text NOTAM Management WFM Context

Digital Briefing

Impact and challenges STAFF COMPETENCIES Training for NOF staff – Basic understanding of AIXM and temporality model, Data base Cooperation and training for Data Originators Transition period while all Data Originators are trained NOF workload increases for the transition period Need for Guidance Materials-> different from OPADD, support from Eurocontrol -> lessons learnt feedback-> further cooperation with Eurocontrol