Establishment of a regulatory review and assessment process

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
SC 18 Ad Hoc Task Group API Staff Issues Ed Durante, Chair.
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
Coping with Electronic Records Setting Standards for Private Sector E-records Retention.
Licensing of Nuclear Power Plants in Pakistan
John Zammit-Haber National Grid
Post Approval Monitoring Program Presented by Carolyn Malinowski Manager, Quality Assurance and Training.
Development plan and quality plan for your Project
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
BASIC IRRS TRAINING Lecture 7
NIST Special Publication Revision 1
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
IAEA International Atomic Energy Agency LICENSING OF RADIOACTIVE WASTE MANAGEMENT FACILITIES Luc Baekelandt Safety of radioactive.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
IAEA International Atomic Energy Agency ESTABLISHING THE SAFETY INFRASTRUCTURE FOR A NUCLEAR POWER PROGRAMME IAEA WORKSHOP ON LEADERSHIP AND MANAGEMENT.
QUALITY OF EVIDENCE FRCC Compliance Workshop September/October 2008.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Authorization and Inspection of Cyclotron Facilities The Authorization Process.
IAEA International Atomic Energy Agency Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria | December.
Radiation Safety Regulations Part VIII: Management requirements and other requirements.
IAEA International Atomic Energy Agency Radiation protection of the public IAEA Regional Training Course on Radiation Protection of patients for Radiographers,
Chicago Area Facilities (CAF) Ground Disturbance and Excavation Procedure.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4-1 Chapter Four Audit Evidence and Audit Documentation Chapter.
Responsibilities of Sponsor, Investigator and Monitor
 Planning an audit of cost statements, records and other related documents is considered necessary to ensure achievement of audit objectives with available.
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
BASIC IRRS TRAINING Lecture 7
Concept Proposal for RA-III Regional WIGOS Centre
Responsibilities of Sponsor, Investigator and Monitor
IAEA E-learning Program
Readiness Review Course
Readiness Review Course
PREPARATION FOR GMP INSPECTION
Module 1 Assemble the WSP team
“Review and Assessment by PNRA Application Set
Overview of the FEPAC Accreditation Process
HSE Case: Risk Based Approach.
Quality Management Systems – Requirements
Regulatory review and assessment
Communication and Consultation with Interested Parties by the RB
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
الإطار التشريعي والرقابي للمحطات النووية
Regulatory review and assessment
USNRC IRRS TRAINING Lecture18
Research and Test Reactor Decommissioning Inspections
Development of a Process for Conducting review & Assessment of PSAR of a NPP Group I.
Operationalizing Export Certification and Regionalization Programmes
Proposed Review Cycle to
How to conduct Effective Stage-1 Audit
Managing Project Work, Scope, Schedules, and Cost
Roles and Responsibilities
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Establishment of a regulatory review and assessment process Group 2

Exercice 1 a) The main tasks of RaA processes to perform 1. Receipt of application for authorization of a facility Officially record all submissions related to the authorization process according to their level of classification (registration) Keeping all the information regarding the documents sent or received (title, date, name of sender or recipient) Keep access/distribution records 2. Acceptance check/review to confirm the completeness of submissions To confirm the completeness of submissions and identify of gross deficiencies all the documents have been prepared/verified by the applicant before the submission submissions are related to the specific facility or activity rather based on generic information, submissions are timely with reference to project schedule to enable appropriate review and assessment by the regulatory body. If the submission is complete, the RB will docket the submission and notify the acceptance of the application.

a) The main tasks of RaA processes to perform 3. Planning and scheduling the review and assessment The regulatory body should indicate to the operator the period of time considered necessary for review and assessment process; 4. Performance of the review and assessment The review and assessment is primarily based on the information submitted by the operator. For the thorough review and assessment of the operator's technical submission the regulatory body acquires an understanding of the design of the facility or equipment, the safety concept on which the design is based, and the operating principles proposed by the operator.

a) The main tasks of RaA processes to perform 5. Regulatory inspection for review and assessment The regulatory body should have the right to visit, or to designate others to visit on their behalf, the operator’s site and, if necessary, to visit contractors’ establishments with the knowledge of the operator. 6. Preparation of the Safety Evaluation Report (SER) Acceptability that the depth and detail of submissions are sufficient Extent to which the safety objectives and regulatory requirements have been met Confidence in the conclusions reached by the analysis

b) Processes of the RaA Review of application for authorization of facility Acceotance check/review for ducommentation for applicatin Planning and schedule of review and assessment Performance of review and assessment/egulatory inspection to complement review and assessment Preparation for evaluatuion of safety report

c) How to manage a regulatory body organization review and asssessment process we have to organize Designation of Team Leader Constitution of Review Team Scheduling of Submissions Planning and Scheduling of Review Conduct of Review Correspondence (Queries/Responses) Conduct of review meeting Preparation safety evaluation report

d) The mechanism for internal and external communications required during the implementation process Meeting Consultation with stakeholders Review and assess the licensees application Schedule of time frame for submission Submission of application by licensees Procedures and guidanace documents Records and documentations

e) Expected inputs and outputs of the process Submission of report by the operator Records and documentation Preliminary safety analysis report Inspections IAEA Standards and Guideline Outputs: Safety evaluation report Authorizations – deny or approval

Exercise 2