Controls & Instrumentation

Slides:



Advertisements
Similar presentations
Main Condensate & Feed Systems
Advertisements

CONTROLS OF SUPER CRITICAL BOILERS
OFF DESIGN PERFORMANCE PREDICTION OF STEAM TURBINES
Copyright© 2014 Austin Analytics Group, LLC. Stand Alone System High Temperature System Hazardous Area System Universal/Remote Display System Copyright©
Welcome.
Operational Ideas for Supercritical Systems The Ultimate Criteria for Appreciation ….. P M V Subbarao Professor Mechanical Engineering Department I I.
Power Plant Engineering
Mr.B.L.Prabhu, Safety Officer Boiler Safety Measures.
Thermal Power Plant Familiarisation (Part- I : Boiler) Presented By-: Mohit Chandra Joshi Engineer National Load Despatch Centre Power Grid Corporation.
CASE STUDY ON BOILER ACCIDENT
Advanced Boiler Control for Biomass and Chemical Recovery Boilers
Boilers Dept. of Mech & Mfg. Engg..
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Circulating Water System
Combustion Calculations
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
1 ENERGY EFFICIENCY IMPROVEMENT IN THE POWER SECTOR Presentationby BHEL - Corporate Engineering & Product Development 5 June 2008.
Heating Control Devices
Fuel System 13 April
Watertube Boiler.
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
737 PNEUMATICS MENU PRINCIPAL.
THERMAL POWER PLANT.
FSSS (Furnace Safeguard Supervisory System)
Superheaters.
Generation and Control of Vacuum in Furnace
Engineer Presentation
Control and regulation of boiler operation Heat Engines & Boilers.
Hydraulics.
Steam Power Plant.
Coal Burning System.
2 July Air & Draft system
Product Introduction.
Lesson 7 Steam Power Plant.
STEAM HEATING.
TURBINE & COOLING SYSTEM Presented By – AVIJEET PRATAP 07ME12 IET AGRA
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
Gas Furnace Planned Maintenance
BOILER PLANT OPERATION Presented By Mr. Sivanand Ray
INDUSTRIAL ELECTRONICS CONTROL EET425/4 Lecturers Indra Nisja School of Electrical System Engineering Northern Malaysia University College of Engineering.
SUBMITED BY BISWAJIT BEHERA
Richard Kelly, D.I.T.1 Facilities Management and the Environment BSc in Electrical Services and Energy Management.
1 HVACR215 – Mechanical for Oil Oil Combustion. 2 Combustion The burning of a substance. Rapid Oxidation The burning of a substance. Rapid Oxidation.
Why Maintenance Tasks are Important Produced by Joe Marchese.
Generating Stations. Bulk electric power is produced by special plants known as generating stations or power plants. Depending upon the form of energy.
STEAM POWER PLANTS.
A seminar on Practical Training taken at KOTA SUPER THERMAL POWER STATION.
Thermal Power Station.
KOTA SUPER THERMAL POWER STATION ,KOTA
Training Presentation On Suratgarh Super Thermal Power Station (Raj)
Presentation on Steam Power Plants R.C.Chaturvedi
HEAT-GENERATING EQUIPMENT INTRODUCTION SELECTION EFFICIENCY FURNACES BOILERS CENTRAL HVAC SYSTEMS.
Prepared by : Nishant .A. Raval
Thermal power plant , panipat
Energy Balance across pulverizer is very critical for satisfactory
MENU PRINCIPAL. THIS PRESENTATION INCLUDES THE SOURCES OF AIR, THE MAJOR SYSTEM COMPONENTS AND THE WAY THE CONTROLS AND INDICATORS ARE USED TO OPERATE.
Process Safety Advisory on Boiler Incidents
Gas Turbine Power Plant
Lesson 7 Steam Power Plant.
Unit 13 Oil-Burning Equipment
Unit 7 Gas Heat: Natural and LP
CASE STUDY ON BOILER ACCIDENT
STEAM CAPACITY UPGRADING FOR BAGASSE FIRED BOILERS
ROCKET TESTING TYPES OF TESTS
POWER PLANT THERMAL POWER STATION.
Furnace Heat Transfer & Steam Generation
Power Plant Engineering. Boilers Boilers Boiler is an apparatus to produce steam. Thermal energy released by combustion of fuel is used to make steam.
WATER AND STEAM SYSTEM.
BOILER PROTECTION AND INTERLOCKS
MERC TRAINING ACADEMY BOILER SPEFICATIONS.
Presentation transcript:

Controls & Instrumentation Boiler Controls & Instrumentation K Karthikeyan Manager Controls & Instrumentation BHEL, Tiruchirappalli Email : karthi@bheltry.co.in

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I INTRODUCTION PART I - BOILER PART 2 - INSTRUMENTATION PART 3 - CONTROLS Bharat Heavy Electricals Limited - Tiruchirappalli

Boiler Controls & Instrumentation Boiler C&I Boiler Controls & Instrumentation Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler C&I -Functions Bharat Heavy Electricals Limited - Tiruchirappalli

Boiler Controls & Instrumentation Boiler C&I Boiler Controls & Instrumentation Broad engineering activities Control systems engineering Instrumentation engineering Electrical systems engineering New product development Bharat Heavy Electricals Limited - Tiruchirappalli

Boiler Controls & Instrumentation Boiler C&I Boiler Controls & Instrumentation Functions Proposal Engineering Contract Engineering Product Engineering Quality Assurance & Control Field Engineering Research & Development Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler Controls & Instrumentation Proposal Engineering Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler Controls & Instrumentation Proposal Engineering Scope of Work Project Estimate Offer submission Offer evaluation by customer Award of contract Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler Controls & Instrumentation Proposal Engineering In summary, the purpose is to draw-up - Scope of Work - Project Estimate of the project. Deliverables : - Estimable quantity(BOM)- main and spares - Datasheets - Descriptive offers of packages & - Preliminary design sketches(P&IDs, GA). Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler Controls & Instrumentation Scope of Work Arrived based on a broad specification prepared by the customer/consultant. Individual system scope identified gets recompiled into a project scope of work . Project scope document includes scope of work , terminal points & exclusions Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler Controls & Instrumentation Scope of Work The typical scope covered in Boiler C&I discipline include Furnace safeguard Supervisory system Secondary Air Damper control system Soot blower control system Boiler area field instruments Associated cable & accessories. Electricals(MCC, elevator etc.) Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler Controls & Instrumentation Offer evaluation The offers get evaluated at the customer end. Customer awards the contract on a technically qualified bid with the lowest price. The award of contract is indicated by a ‘Letter of Intent’ received from the customer. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler Controls & Instrumentation Award of contract The offers get evaluated at the customer end. Customer awards the contract on a technically qualified bid with the lowest price. The award of contract is indicated by a ‘Letter of Intent’ received from the customer. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler Controls & Instrumentation Contract Engineering Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Contract Engineering Packages SG integral C&I(Trichy) Station C&I(PEM or customer)- in case of BTG or Turnkey SG integral electricals(Trichy) Station Electricals(PEM or customer)- in case of BTG or Turnkey Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Contract Engineering The role involves system level contract coordination for the boiler C&I area. Applicable PGMA List Sub Delivery check list. Boiler Contract Regular activity(BCR) schedule ‘00’ PG list(erection documents). Applicable O&M documents. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Contract Engineering System Engg. Documents involved : Piping&Instrumentation Diagrams(P&IDs) Measurement & control recommendations Automatic control schemes Interlock & protection schemes Bharat Heavy Electricals Limited - Tiruchirappalli

P & I Diagram- Air & flue gas (portion) Boiler C&I P & I Diagram- Air & flue gas (portion) Bharat Heavy Electricals Limited - Tiruchirappalli

Instrument schedule steam & water (sample) Boiler C&I Instrument schedule steam & water (sample) Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Product Engineering Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Product Engineering Detailed design of Boiler C&I products & systems Digital controls Analog controls Electrical systems & cables Field instruments Special instruments Actuators Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Product Engineering Digital Controls Burner management system. Soot Blower control system Analog Controls Secondary air damper control system. Auxiliary PRDS control system. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Product Engineering Electrical systems Control supply panels LT Motor control centres Power distribution panels Field instruments Switches & gauges for Pressure,Level & temperature Thermocouples Flow elements Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Product Engineering Special instruments Flame scanner system Acoustic steam leak detection system. Electronic water level indicator. Closed circuit television system. Vibration monitoring system. Flue gas analysers. Steam and water analysers. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Product Engineering Electrical and C & I engineering design Release of indents for C & I sub-delivery items. Evaluation of technical offers for bought-out items Technical Delivery Conditions (TDC) Bharat Heavy Electricals Limited - Tiruchirappalli

Quality Control & Assurance Boiler C&I Boiler Controls & Instrumentation Quality Control & Assurance Bharat Heavy Electricals Limited - Tiruchirappalli

Quality Control & Assurance Boiler C&I Quality Control & Assurance The role involves preparation/review of following activity w.r.t C&I products & systems Prepare Standard Quality Plans (SQP) Prepare Contract Quality Plans (CQP) Review/Approve Vendor Quality Plans (VQP) Issue Reference Quality Plans (RQP) Prepare Inspection Check Lists (ICL) Bharat Heavy Electricals Limited - Tiruchirappalli

Quality Control & Assurance Boiler C&I Quality Control & Assurance Performing inspection at vendor works for CI products & systems - bought-out items Review & dispose Site Action Requests on CI products & systems Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Field Engineering Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Field Engineering The role involves Providing technical support / trouble shooting of C&I products / system during - Erection & commissioning stage of project - Operation after handing over to customer Review & dispose Commissioning action requests Review & dispose Contract closing pending issues Visiting sites to ensure smooth progress of C&I site activity Bharat Heavy Electricals Limited - Tiruchirappalli

Research & Development Boiler C&I Boiler Controls & Instrumentation Research & Development Bharat Heavy Electricals Limited - Tiruchirappalli

Research & Development Boiler C&I Research & Development In-house developed C&I systems & products Microprocessor based Gravimetric coal feeder controls - BHELFEED Microcontroller based Flame moniotirng system - BHELSCAN Acoustic steam leak detection system – BHELSONIC Electronic water level Indicator system- BHELVISION Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler Basics Bharat Heavy Electricals Limited - Tiruchirappalli

BOILER CLASSIFICATION Boiler C&I BOILER CLASSIFICATION Cycle Conventional (Rankine cycle) HRSG (combined cycle) Nuclear Circulation Natural, Controlled Once through Type of firing Corner Front Downshot FBC Stoker Fuels Oil Coal Gas End use Utility Industrial Bharat Heavy Electricals Limited - Tiruchirappalli

Boiler C&I BOILER CLASSIFICATION Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I BHEL BOILERS Power Boilers Up to 600 MW rating(Coal, oil and gas fired - Subcritical) Up to 800 MW - Supercritical Nuclear steam generators Up to 235 MW rating Industrial boilers Up to 450 Tonnes/hour rating Fertilisers, Petrochemical, Steel & Paper industries Wide range of fuels- Oil, Gas, BFG, Bagasse, Black liquor. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Bharat Heavy Electricals Limited - Tiruchirappalli

Schematic of a boiler

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I UTILITY BOILERS - ESSENTIAL COMPONENTS Furnace & Circulation system Superheaters Reheaters Economiser Airheaters Fans Pulverisers Raw coal feeders Fuel firing system Sootblowers Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I CIRCULATION SYSTEMS Natural circulation Controlled circulation Once through Circulation ratio : Mass rate of water fed to the steam generating tubes to the mass rate of steam generated. Natural circulation 6 Controlled circ 4 Once through 1 Bharat Heavy Electricals Limited - Tiruchirappalli

Boiler C&I BOILER CIRCULATION SYSTEMS Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Fans 1. Axial Impulse type - IGV Control. Reaction type - Blade pitch Control. 2. Radial Inlet damper control, Variable speed control; Variable speed control by two speed motor, Hydraulic coupling or Variable frequency drive. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Radial Fan Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Axial Reaction Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I RADIAL FANS - SPEED CONTROL Flow proportional to Speed Flow proportional to (Impeller Dia) 3 Head proportional to (Speed) 2 Head proportional to (Impeller Dia) 2 Hence Variation in speed alters the performance Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FANS IN BOILER - SCOPE Primary air fans - Dries & transports Pulverised coal Forced draft fans - Supplies Combustion air Induced draft fans - Sucks Flue gas out of furnace Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I MILL - GRINDS COAL Slow speed mills (Tube mills - 15 to 25 RPM) Medium speed mills (Bowl mill, Ball and race mill etc.- 50 to 100 RPM) High speed mills (hammer mills directly coupled to motor - 750 to 1000 RPM) Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I RAW COAL FEEDERS Scope : CONVEY RAW COAL TO MILL Volumetric - Rotary and drag link, Gravimetric – Endless belt type Types : Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I AIRHEATER Heat recovery equipment Extract heat from Flue gas to heat primary & secy. Air Regenerative type ( Rotating drive ) Tubular type Types : Bharat Heavy Electricals Limited - Tiruchirappalli

SOOTBLOWERS Remove ash & slag from pressure part tubes Boiler C&I SOOTBLOWERS Remove ash & slag from pressure part tubes Types Long retractable sootblowers - traverse & rotary motors Half retractable sootblowers- traverse & rotary motors Rotary blowers - rotary motor Wall blowers - traverse & rotary motors Furnace temperature probe - Used during boiler start up Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FUELS & COMBUSTION Fuels : Coal Oil Gas H/C ratio Natural gas 0.3 Fuel oil 0.1 Coal 0.07 Calorific value (kcal/kg ) Gas 10000 Oil 8000 Bituminous coal 3000-3500 Lignite 2500 Coal burning methods "On grate" “In suspension" Fluidised bed Three 'T's of combustion Time Temperature and Turbulence. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FUELS & COMBUSTION Rapid combustion Short period of time High temperature & Very turbulent flame . Less turbulence and longer burning produces fewer nitrous oxide. In some cases combustion is delayed or staged intentionally to obtain fewer nitrous oxide or to obtain desired flame characteristics. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I COMBUSTION CALCULATIONS The amount of carbon and oxygen for complete combustion of Carbon are represented by the formula Carbon + Oxygen = Carbon di oxide C + O2 = CO2 + 14100 BTU/Kg C 12 Kgs + 32 Kgs = 44 Kgs. The formula for combustion of hydrogen is represented by Hydrogen + Oxygen = Water 2H2 + O2 = 2H2 O + 61000 BTU/Kg H2 4Kgs + 32 Kgs = 36 Kgs Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I COMBUSTION CALCULATIONS An example of incomplete combustion reaction, Carbon + Oxygen = Carbon monoxide 2C + O2 = 2CO + 4000 BTU/Kg C 24Kgs + 32 Kgs = 56 Kgs With right conditions of time, temperature and turbulence, by adding more oxygen to the carbon monoxide, the carbon monoxide will further oxidise to carbon di oxide resulting in the second part of heat energy from the original carbon. Carbon monoxide + Oxygen = Carbon di oxide 2CO + O2 = 2 CO2 + 4435 BTU/Kg CO 56 Kgs + 32 Kgs = 88 Kgs Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I COMBUSTION CALCULATIONS The theoretical requirement of combustion is given by Kgs air/ Kgs of fuel =11.53C + 34.34 (H2 - O2/8) + 4.29S, where C, H2, O2 and S are decimal equivalent to ultimate analysis % by weight. If flue gas oxygen content is known, Excess air (%) = K[21/(21-% Oxygen) -1] * 100, where K = 0.9 for gas, 0.94 for oil and 0.97 for coal. This formula is based on dry basis percentage oxygen. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler Instruments Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Bharat Heavy Electricals Limited - Tiruchirappalli

Instrumentation representation- ISA Boiler C&I Instrumentation representation- ISA First letter P-Pressure T-temperature F- Flow A- Analytical Succeeding letters A- Alarm I- Indicate R- Record Q- Integrate C- Control S- Switch T- tansmitter E- Element P- Pocket W- Well Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Boiler Controls Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I BOILER CONTROLS Continuous control : Objective Enabling Automatic Operation. Optimising operating performance. On-Off control : Supervise process operation for safety Prevent process from entering unsafe condition. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I BOILER CONTROLS Auto control system Boiler Auxiliaries interlocks & protection system Furnace safeguard supervisory system (FSSS) Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Auto control system. Master demand Combustion and draft control Feed-water control Steam-temperature control Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Master demand 'Master demand' controls the boiler operation. Set from unit load demand or main steam header pressure control ‘Master demand’ sets burners firing at a rate required for steam production and corresponding air flow demand Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I   Combustion control   Fuel flow control Air Flow Control Coal mill control Objective : Fuel is consumed at a rate that exactly matches the Steam demand. Fuel is consumed safely, so that the energy is released without risk to plant, personnel or environment Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I   Combustion control Air Fuel/Cross Limiting AIR CONTROL FT PT A T P I f(x) Fuel FLOW STEAM HEADER PRESSURE AIR FLOW SP LO SELECT HI SELECT Fuel CONTROL Fuel Feed AIR DAMPER Air Feed Bharat Heavy Electricals Limited - Tiruchirappalli 67

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I   Mill air flow and temperature control   Mill uses primary air - For transporting coal from mill to furnace. To "dry" coal. Air flow to mill and mill outlet temperature are regulated using Hot air damper and cold air damper respectively Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I   Feedwater control Objective : To supply enough water to the boiler to match the evaporation rate. Water level in the drum indicates amount of water in boiler Actual Steam Flow - Used to determine required feedwater during transient conditions when level may not be accurate. Difference between Actual steam flow and Actual Feedwater Flow is added to the level error to form the ‘Feedwater demand’. Feedwater demand drives the feed control station to adjust feedwater sa as to maintain the drum level to normal value. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I   Feedwater control P R E S U C O M N A T I f ( x ) X F L K D V / W y p i c a l s n g e - d r v o t m . , u h b w 4 5 1 9 8 Bharat Heavy Electricals Limited - Tiruchirappalli

Boiler C&I Steam temperature control Objective:   Steam temperature control Objective: To maintain a constant steam temperature at turbine inlet despite large load swings . Basic methods : DESUPERHEATING (ATTEMPERATION) Fine spray of comparatively cool water droplets into the vapour to reduce steam temperature. BURNER TILT POSITIONING Raise/Lower the Fireball in the furnace by tilting burners upwards or downwards. Bharat Heavy Electricals Limited - Tiruchirappalli

Boiler C&I Steam temperature control   Steam temperature control Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Secondary Air Damper Control Two types of dampers – Fuel air dampers & Auxiliary air dampers Maintains proper windbox air flow distribution 0 to 30 % unit load, all auxiliary dampers modulated to maintain windbox to furnace differential pressure Above 30% unit load, BMS “closes” elevations of auxiliary dampers that are not required for elevations of fuel currently in service Fuel air dampers are positioned on an elevation basis as a function of the corresponding coal feeder speed High windbox to furnace differential pressure opens all the secondary air dampers Bharat Heavy Electricals Limited - Tiruchirappalli

Boiler C&I Steam temperature control   Steam temperature control Cascade control used for Spray de-superheating loop MS temperature error establishes the set point for SH DESH outlet temp. SH DESH outlet temp. error positions the spray control valve such as to regulate the MS temperature within allowable limits. Burner tilt responds to the lower of SH or RH outlet temp. Spray control responds to the higher of SH or RH outlet temp. Bharat Heavy Electricals Limited - Tiruchirappalli

BOILER AUXILIARIES INTERLOCKS AND PROTECTION SYSTEM Boiler C&I BOILER AUXILIARIES INTERLOCKS AND PROTECTION SYSTEM Scope : Sequence control of starting and protection & interlocking of boiler auxiliaries… FD fans ID fans PA fans Airheaters Dampers Valves Bharat Heavy Electricals Limited - Tiruchirappalli

FURNACE SAFEGUARD SUPERVISORY SYSTEM ( FSSS ) Boiler C&I FURNACE SAFEGUARD SUPERVISORY SYSTEM ( FSSS ) This system takes care of interlocks required for starting, supervising the operating and safe shut down of the equipments connected with fuel firing system. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Tangential Windbox Bharat Heavy Electricals Limited - Tiruchirappalli

FURNACE PLAN CORNER DESIGNATION Boiler C&I FURNACE PLAN CORNER DESIGNATION 2 C E R N O - 3 C E R N O - SECONDARY AIR SECONDARY AIR 4 C E R N O - 1 C E R N O - FRONT WATER WALL Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Fireball –Tangential Firing Bharat Heavy Electricals Limited - Tiruchirappalli

CAUSES OF FURNACE EXPLOSIONS Boiler C&I CAUSES OF FURNACE EXPLOSIONS An interruption of Fuel or Air supply or Ignition energy to the burners, sufficient to result in momentary loss of flames, followed by restoration and delayed re-ignition of an accumulation. Fuel leakage into an idle furnace and the ignition of the accumulation by a spark or other source of ignition. Repeated unsuccessful attempts to light-off without appropriate purging, resulting in the accumulation of an explosive mixture. The accumulation of an explosive mixture of fuel and air as a result of loss of flame or incomplete combustion at one or more burners in the presence of other burners operating normally or during lighting of additional burners. The accumulation of an explosive mixture of fuel and air as a result of a complete furnace flameout and the ignition of the accumulation by a spark or other ignition source, such as could occur where attempting to light a burner(s). Purging with an airflow that is too high, which stirs up combustibles smoldering in hoppers. Bharat Heavy Electricals Limited - Tiruchirappalli

CAUSES OF FURNACE IMPLOSIONS Boiler C&I CAUSES OF FURNACE IMPLOSIONS A mal-operation of the equipment regulating the boiler gas flow, including air supply and flue gas removal, resulting in furnace exposure to excessive induced draft fan head assembly. The rapid decay of furnace gas temperatures and pressure resulting from either a rapid reduction in fuel input or a master fuel trip. A combination of the two conditions indicated in a, b above has resulted in the most severe furnace implosion incidents. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS FUNCTIONS OF FSSS 1. FURNACE PURGE SUPERVISION 2. SECONDARY AIR DAMPER MODULATION AND ON-OFF CONTROL AND SUPERVISION 3. IGNITOR ON-OFF CONTROL AND SUPERVISION 4. LIGHT OIL ON-OFF CONTROL AND SUPERVISION 5. HEAVY OIL ON-OFF CONTROL AND SUPERVISION 6. PULVERIZER AND FEEDER ON-OFF CONTROL AND SUPERVISION 7. FLAME SCANNER INTELLIGENCE AND CHECKING 8. BOILER TRIP PROTECTION. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I F S S S F - FURNACE S - SAFEGUARD S - SUPERVISORY S - -SYSTEM FSSS ENSURES SAFE FURNACE OPERATING CONDITIONS DURING START UP LOW LOAD OPERATION SHUT DOWN. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS SOME OF THE PRECAUTIONARY MEASURES TO ACHIEVE SAFE AND RELIABLE OPERATION FURNACE SHOULD BE PURGED BEFORE LIGHT UP ADEQUATE IGNITION ENERGY TO EACH BURNER ADEQUATE AIR SUPPLY TO EACH BURNER TO AVOID FLAME OUT OPTIMUM FURNACE PRESSURE CORRECT AIR TO FUEL RATIO Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS FUNCTIONAL DIVISION OF LOGICS UNIT LOGIC ELEVATION LOGIC CORNER LOGIC Bharat Heavy Electricals Limited - Tiruchirappalli

TYPICAL CONDITIONS FOR FURNACE PURGE: Boiler C&I TYPICAL CONDITIONS FOR FURNACE PURGE: Heavy fuel oil trip valve closed. Heavy fuel oil nozzle valves closed. Light fuel oil trip valve closed. Light fuel oil nozzle valves closed. Flame scanners on each elevation indicate no flame. Air flow greater than 30% and less than 40% All pulverisers off. All feeders off. Pulveriser outlet gates closed. All hot air gates closed. All cold air dampers not greater than 5° open. Both PA fans off. No boiler trip existing. All auxiliary air dampers modulating. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS BOILER TRIP COMMAND IS INITIATED BY LOW OR HIGH DRUM WATER LEVEL BOTH I.D OR F.D ARE OFF LOW OR HIGH FURNACE PRESSURE REHEATER PROTECTION TRIP TURBINE LOSS OF ALL FUEL TRIP LOSS OF UNIT D.C POWER LESS THAN FIRE BALL AND LOSS OF AC AT ANY ELEVATION MANUAL TRIP UNIT FLAME FAILURE TRIP INSUFFICIENT PRIMARY AIR Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS BOILER TRIP COMMAND RESULTS IN STOPPAGE OF ALL FUEL INPUTS BY TRIPPING 1. ALL PULVERIZERS 2. ALL FEEDERS 3. ALL OIL GUNS 4. ALL IGNITORS IT CLOSES 1. IGNITOR LIGHT OIL TRIP VALVES HEAVY OIL TRIP VALVES Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Scanner Fan logic “Scanner duct to furnace DP” when low initiates a Scanner air fan -A “run” command If DP value remains “low” for more than five seconds, scanner air fan -B “run” command is issued. If DP condition is low even after 10 seconds “Loss Of Scanner Cooling Air” alarm is generated Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Seal Air Fan Control When either Primary Air Fan is on, seal air fan “A” is automatically placed in service. If either Primary Air Fan is on & Seal Air Header/Cold Air Duct DP is low, the seal air fan is auto started. When both seal air fans are on and the Seal Air Header/Cold Air Duct DP is not low,either seal air fan can be stopped manually. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS PULVERIZER STARTING PROCEDURE START “PULVERIZER ON” FEEDBACK OPEN HOT AIR GATE WAIT TILL PULVERIZER COMES TO TEMPERATURE ( 140°F ) START FEEDER ( AT MINIMUM FEEDER SPEED ) COAL FLOW INDICATOR OR PULVERIZER AMPERE ( ( WITH IN 5 SECONDS ) FIFTY SECONDS FEEDER SPEED RELEASED TO AUTOMATIC CONTROL FUEL AIR DAMPER OPENED FUEL AIR DAMPER MODULATED TO AUTOMATIC CONTROL. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS PULVERIZER START REQUIREMENTS A IGNITION ENERGY AVAILABLE B. ADEQUATE PRIMARY AIR C. D.C POWER AVAILABLE D. LOCAL PULVERIZER CONDITION SATISFACTORY E. IF NO OTHER FEEDER IS WORKING FUEL AND AIR NOZZLE TILTS PLACED IN HORIZONDAL CONDITION. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS CONDITIONS ( LOCAL ) TO BE SATISFIED TO START RESPECTIVE PULVERIZER A. DISCHARGE VALVE OPEN B. SEAL AIR VALVE OPEN C. COLD AIR DAMPER OPEN D. PULVERIZER DAMPER OUTLET LESS THAN 200°F E. FEEDER INLET GATE OPEN F. TRAMP IRON HOPPER VALVE OPEN. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS PULVERIZER IGNITION ENERGY AVAILABLE A MINIMUM OF 3 OF THE 4 LIGHT OIL OR HEAVY OIL NOZZLE VALVE OF THE ELEVATION JUST ABOVE OR BELOW, ARE OPEN OR BOILER LOADING IS GREATER THAN 30% AND PULVERIZER JUST ABOVE OR BELOW IS IN SERVICE AT GREATER THAN 50% LOADING. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS MILL OUTLET TEMPERATURE CONTROL HIGH PULVERIZER OUTLET TEMPERATURE (ABOVE 200°F ) WILL OPEN COLD AIR DAMPER AND CLOSE HOT AIR GATE. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS FEEDER CONTROL A. FEEDER RUNS AT MINIMUM SPEED UNTIL INITIATING CONDITION IS CORRECTED, AT WHICH TIME THE FEEDER WILL BE RETURNED TO CONTROL. A. PULVERIZER BOWL DIFFERENTIAL HIGH. B. PULVERIZER AMPS. ABOVE MAXIMUM SET POINT. B. LOSS OF COAL FLOW AND LOW PULVERIZER CURRENT WILL TRIP THE FEEDER, OPEN COLD AIR DAMPER AND CLOSE HOT AIR GATE. AFTER CORRECTIVE ACTION THE HOT AIR GATE IS OPENED AND FEEDER IS RESTARTED. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS CONDITIONS FOR A PULVERIZER TRIP PULVERIZER DISCHARGE VALVE NOT OPEN LOSS OF UNIT DC POWER (FOR MORE THAN 2 SECONDS) PULVERIZER IGNITION PERMIT NOT SATISFIED AND SUPPORT IGNITION IS REQUIRED. BOILER TRIP PRIMARY AIR FAN TRIP Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS PULVERIZER SHUT DOWN SEQUENCE START ASSOCIATED OIL ELEVATION REDUCE FEEDER SPEED TO MINIMUM CLOSE HOT AIR GATE PULVERIZER OUTLET TEMPERATURE IS 120°F STOP FEEDER WAIT FOR 2 MINUTES STOP PULVERIZER FURNACE STABILIZES ASSOCIATED OIL LEVEL SHUT DOWN. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS PULVERIZER SHUT DOWN START ASSOCIATED OIL ELEVATION REDUCE FEEDER SPEED TO MINIMUM CLOSE HOT AIR GATE PULVERIZER TEMPERATURE IS 120°F STOP FEEDER TWO MINUTES STOP PULVERIZER FURNACE STABILIZES SHUT OFF ASSOCIATED OIL ELEVATION. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS ARRANGEMENT OF SYSTEM FSSS - MAJOR PARTS LOGIC CABINET CONSOLE INSERT SECONDARY AIR DAMPER PANEL MILL PANEL FIELD EQUIPMENTS CUSTOMER SUPPLIED INTERFACE EQUIPMENT. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I Oil gun start sequence HEA Advances Atomising valve opens Corner oil valve opens HEA sparks Flame scanner picks up flame HEA retracts Corner valve closes if flame is not sensed. Bharat Heavy Electricals Limited - Tiruchirappalli

Bharat Heavy Electricals Limited - Tiruchirappalli Boiler C&I FSSS – Oil gun start up timing sequence Bharat Heavy Electricals Limited - Tiruchirappalli

THANK YOU