JOISTS SLIDE SHOW.

Slides:



Advertisements
Similar presentations
Roof Trusses Created By M.S.Martin 11/04, reviewed 11/05, reviewed 11/07.
Advertisements

Construction Explanation.
Structural Steel Construction
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT Week of: August 19 th, 2013 – August 23 rd, 2013.
L ATERAL S UPPORT S LIDE S HOW Modified for use in CE470, Purdue University, April 2004.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Roof Framing A Quick Primer
Load Paths and Tributary Area Examples
Parts of typical slab formwork
Gravity Force Resisting Systems
Subpart R Steel Erection
5. HEAVY TIMBER FRAME CONSTRUCTION
CE A434 – Timber Design Structural Behavior.
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Roof Trusses.
Connections and Bracing Configurations
Class Day Seventeen.
Skilled Trades 1201 Floor Framing
CTC 422 Design of Steel Structures
Unit 50 Roof Trusses Truss Types and Components • Principles of Truss Design • Truss Fabrication • Installing Roof Trusses • Truss Safety.
Chapter 19 Floors.
Copyright 2006 The National Association of Certified Home Inspectors
Slab Form Design.
CONSTRUCTION AND DETAILING 1
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
Moment Connection Requires Bolts Outside the Flanges
THE BUILDING ENVELOPE: Lecture 2 IMPORTANCE OF THE BUILDING ENVELOPE.
Dr Ana M. Ruiz-Teran Transverse schemes for bridge decks. Part 3: Box girders.
C OLUMNS S LIDE S HOW. Columns are brought in with a crane and placed on over their respective base plates and fastened once they are plumbed, tie down.
IN MODULAR CONSTRUCTIONS
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
COLD FORMED STEEL SECTIONS
J OISTS S LIDE S HOW. Joists are shipped to the site and stored in lay-down areas while awaiting erection in their respective bays. They are typically.
Structural Systems Design for a Laramie Office Building
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
Floor Framing.
Chapter 11 Wall and Ceiling Framing Copyright Goodheart-Willcox Co., Inc. May not be posted to a publicly accessible website. Identify the main parts.
Integrated Design : Building Scale | Prof. Craig Schwitter, Prof
Use of Resilient Channel or Hat Channel to Meet the Lateral Restraint/Bracing Requirements of the Bottom Chords of MPCWT Floor Systems Overview Revised.
NZS 4219:2009 Seismic Performance of Engineering Systems in Buildings
Drawing generation plugin
Drafting 2 – Honors Architecture Ardrey Kell High School
CHAPTER 5 IRC 2009 FLOORS.
Chapter-2 Parts of Steel Bridges.
Architecture Mr. Graves
Wood Structures session 5 Exterior and Interior walls
•Connecting to the Foundation & Bearing
Wood Structures Topic 8 Quality Workmanship
Arch205 Material and building construction 1 floor & Roof systems
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
LATERAL SUPPORT SLIDE SHOW.
Ch 17 Automated Assembly Systems
Building section A vertical cut or slice through a structure that illustrates the type of foundation, wall, and roof construction to be used.
COLUMNS SLIDE SHOW.
Arch205 building construction floor & Roof systems
Arch205 building construction floor & Roof systems
Wood Frame Construction
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
Technology and Engineering
Mechanical System P09045: Membrane Characterization Test Stand
Masonry Bearing Walls.
5. HEAVY TIMBER FRAME CONSTRUCTION
Commercial Structural Framing Systems
Information related to Chapter 7 in the textbook
Presentation transcript:

JOISTS SLIDE SHOW

Joists are shipped to the site and stored in lay-down areas while awaiting erection in their respective bays. They are typically shipped in “joist bundles.”

The “joist bundles” are erected using a crane or modified loader The “joist bundles” are erected using a crane or modified loader. The bundles are set into the bay as a unit, reducing the number of loads (“picks”) to be handled by the crane.

The bundles are opened and the joists are “shaken out” (spread across the bay) to their required spacing.

Decking is laid over the joists and fastened to them using tack welds or mechanical fasteners (screws). This allows transfer of shear loads to the deck acting horizontally as a diaphragm. Vertical floor loads directly bear on the joists. HVAC ducts and conduit are often suspended or attached directly to the joists. The location of point loads is important in design of joists.

Joists are very versatile and an orientation other than horizontal can be implemented, if used appropriately. This picture clearly shows the joist “bridging” used to laterally brace the joists.