Upscaling Basic Sanitation for the Urban Poor (UBSUP)

Slides:



Advertisements
Similar presentations
Surface Irrigation.
Advertisements

Onsite Wastewater Treatment Systems Module 4:1. What is a Septic System? Module 4:2 Photo credit: MOEE.
Sanitation is Business
ADRICOSM-EXT PROJECT (ADRIatic sea integrated COastal areaS and river basin Management system pilot project - EXTension) WP2 – INTEGRATED CATCHMENT SIMULATOR.
Interpreting a contour map
Welcome to ENV4203 Public Health Engineering
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1 Stormwater Management Issued May 2009 Level II: Introduction to Design Education and Certification for Persons Involved in Land Disturbing Activities.
Continuity Equation Tutorial
Design of Culverts. Culvert Design - Basics Top of culvert not used as pavement surface (unlike bridge), usually less than 7 m.
Contour and Topo map Applications Profile View (Longitudinal Sections): Roads, Canals, Pipes,… Cross-Sectional View, Roads, Canals, Pipes, Building,…
Fluid Dynamics.
Wes Marshall, P.E. University of Connecticut May 2007 CE 276 Site Design Final Exam Outline.
© T Madas.
 An adequate drainage system for the removal of surface and subsurface water is vital for the safety of aircraft and for the long service life of the.
Sanitary Engineering Lecture 16
Notes on Hydraulics of Sedimentation Tanks. A Step by Step Procedure.
Plan Review Required Materials [ARM (3)] – (a) a plan view and a sectional view of both the pool, spa, or other water feature or related facility,
Water Services Trust Fund Tools for the County Resident Monitor The SafiSan Toolkit 1 posters, workshops, procedures, banners, programmes, pictures, pee,
1 I. Water Supply Networks and Facilities Topic I.4. River Water Intakes: Kinds and Structures Water Intake Kinds General classification: I. According.
NIRAV JAYANTIBHAI DHANDHUKIA SHELADIA MIHIRKUMAR KISHORBHAI
Hydraulic Engineering
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
DECENTRALISED WASTEWATER TREATMENT AND REUSE Components and Designing
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Quality of Water Q litres Time to Collect Water secs Volume Flow Rate Q litres/min Pump 1 Inlet Pressure P 1 bar Pump 1 Outlet Pressure.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
From the Beginning Design Standards and Other Post-Construction Program Elements.
The Natural Pool To advance to the next slide, click your mouse button. To end the show, close the window.
Ancient Invention By Aaron simmons. What? Roman Aqueducts.
Basic Hydrology & Hydraulics: DES 601
Hydromodification Compliance in the Bay Area
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel.
1 WATER SERVICES TRUST FUND (WSTF) Up-Scaling Basic Sanitation for the Urban Poor (UBSUP) Finance & Business Models Prepared by the UBSUP Team.
UBSUP & SafiSan: Key Characteristics Prepared by the UBSUP Team 1 UBSUP, SafiSan, plot & household level sanitation, demand-driven approach, UDDTs, the.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
SURVEYING FOR INSPECTORS. Course Content Introduction Chapter 1 – Chapter 1 – Field Equipment Chapter 2 – Chapter 2 – Location Survey Chapter 3 – Chapter.
Lesson 2 – page 1.  To learn what is a flood hydrograph  To learn how to read a flood hydrograph  To learn what is:  Lag time  Peak discharge  Rising.
Basic Hydrology: Rainfall-runoff based methods – III
Interpreting a contour map
CONSTRUCTION OF A DTF DO’s and DON’Ts.
Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components.
Environmentally sensitive areas
Winter application worksheet
IRRIGATION PRINCIPLES
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
San Dieguito Lagoon Inlet Dynamics and Maintenance
Decentralised Treatment Facility (DTF)
River System Development
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Summary In addition to the oceans, where else is water found on Earth?
Living with Streams in Flood
Water use and treatment
Discharge, stream flow & channel shape
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Surface Runoff and Hydrograph Components
2 Days National Workshop on “National Building Code of India 2016 ”
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
TECHNICAL SPECIFICATION AND REQUIREMENTS
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Hydrotechnical Design Guidelines for Stream Crossings
Environmentally sensitive areas
SETTING OUT OF THE DTF MODULES.
Presentation transcript:

Upscaling Basic Sanitation for the Urban Poor (UBSUP) Preparation of final design Technical Drawings Section View 12/3/2018

Content Questions you might to ask yourself: What is the context of this session? What has to be considered during the preparation of the cross-section drawing? 12/3/2018

What is the context of this session? The SafiSan Toolkit This session 12/3/2018

Baseline data collection – Existing levels Take levels at the following locations (along water flow line): Level of the final effluent discharge point (flooding level) Ground levels where different treatment modules will be located (outlets) Existing ground level where the RB will be located (outlet) Existing ground level at gate ► To determine in the BoQs the volumes for excavation and refilling (landscaping) 12/3/2018

Baseline existing levels: water flow line VFCW Water Flow line (main treatment line) Water Flow line (SDRB drainage) CA ABR SDRB ST RB/BT Storage 12/3/2018

Baseline - existing levels 1 2 3 VFCW Example: 1: 1400.000m (final discharge point) 2: 1400.500m (inspection chamber) 3: 1401.000m (VFCW outlet channel) 4: 1402.000m (ABR/BT outlet pipe) 5: 1403.000m (ST outlet pipe) 6: 1404.000m (RB/BT outlet pipe) 7: 1402.000m (SDRB outlet pipe) CA 4 ABR 7 SDRB ST 5 6 RB/BT Storage 12/3/2018

Design – required minimum levels 1 2 3 VFCW Example: 1: 1400.00m (existing flooding level) 2: 1400.20m (Δd=20m, 1% slope) 3: 1400.40m (Δd=20m, 1% slope) 4: 1401.45m (Δh=0.97m within VFCW + Δd=8m, 1% slope in feeding pipe) 5: 1401.52 (Δd=7m, 1% slope) 6: 1402.54 (Δh=1.02m within ABR/BT) 7: 1402.63 (Δd=9m, 1% slope) 8: 1402.73 (Δh=0.10m within ST) 9: 1402.77 (Δd=4m, 1% slope) 10: 1402.58 (Δd=4m, 1% slope, based on ABR inlet) 4 5 CA 6 10 ABR SDRB ST 8 7 9 RB/BT Storage 12/3/2018

Design – cross-section drawing - A 20m, 1% 20m, 1% 1400.00 1400.40 1400.20 Drainage channel 12/3/2018

Design – cross-section drawing - A 1401.45 8m, 1% 0.97m 1400.40 Drainage channel Feeding pipe Bypass pipe 12/3/2018

Design – cross-section drawing - A 7m, 1% 1402.54 1.02m 1401.52 1401.45 12/3/2018

Design – cross-section drawing - A 1402.73 1402.63 1402.54 0.1m 9m, 1% 12/3/2018

Design – cross-section drawing - A 1402.77 1402.73 4m, 1% 12/3/2018

Design – cross-section drawing - A Total level difference for FS/WW stream: 1402.77-1400.00=2.77m 12/3/2018

Design – cross-section drawing - B 1402.54 1402.58 4m, 1% 12/3/2018

Design – BoQ The cost for excavation can be calculated based on The required levels of the modules The existing ground level pipe ST pipe ABR pipe VFCW pipe pipe 12/3/2018

Do you have any questions, remarks or suggestions? 12/3/2018