Bubble Chamber – Beam Requirements

Slides:



Advertisements
Similar presentations
Kerstin Sonnabend, IKP, TU Darmstadt S-DALINAC - Nuclear Astrophysics Nuclear Astrophysics at the Darmstadt superconducting electron linear accelerator.
Advertisements

Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Electron Beam Control and Alignment LCLS FEL Undulator Commissioning Workshop UCLA Jan , 2004 P. Emma, SLAC Undulator collimation and protection.
Pair Spectrometer Design Optimization Pair Spectrometer Design Optimization A. Somov, Jefferson Lab GlueX Collaboration Meeting September
Status of the Tagger Hall Background Simulation Simulation A. Somov, Jefferson Lab Hall-D Collaboration Meeting, University of Regina September
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Accelerator hall of the S- DALINAC – electron energies from 2 to 130 MeV available – cw and pulsed beam operation possible – source for polarized electron.
Tagging spectrometer and photon beamline Review January 23-24, Response to Questions Bremsstrahlung Tagging Spectrometer and Photon Beam Review.
Bubble Chamber Planning Meeting 04 September
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Bubble Chamber Experimental Readiness Review September.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
PANDA electromagnetic calorimeters Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group INSTR08 28 Feb - 05 Mar 2008.
Polarized 3 He Target for 12 GeV Experiments J. P. Chen, August 15, 2012, JLab  Experiments and requirements  Target performance from previous experiments.
Steigerwald results reported in SPIN 2000 JLab measurements in June 2012 after 12 years good agreement Results depend on (energy=same, targets=same, TOF.
Experiment beam line installation (9/4/2014) SystemThus FarTo Do Vacuum~ Torr, IP’s on, Vac interlock checkNone Fast valveValve + CCG installed,
Introduction to Bubble Chamber: Ops Training September.
Bubble Chamber: Experimental Overview August 18, 2015.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
Integrated Radiation Measurement and Radiation Protection of BES Ⅲ Zhang Qingjiang, Wu protection group, accelerator center, IHEP,
22 September 2005 Haw05 1  (1405) photoproduction at SPring-8/LEPS H. Fujimura, Kyoto University Kyoto University, Japan K. Imai, M. Niiyama Research.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Photon Flux Control Liping Gan UNCW. Outline PrimEx-  experiment requirement Tagged photon Procedure to obtain the number of tagged photons Relative.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Summary of Bubble Chamber Beam Test – Sept November.
An electron/positron energy monitor based on synchrotron radiation. I.Meshkov, T. Mamedov, E. Syresin, An electron/positron energy monitor based on synchrotron.
Bubble Chamber Planning Meeting 07 August
Calibration of energies at the photon collider Valery Telnov Budker INP, Novosibirsk TILC09, Tsukuba April 18, 2009.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
E.B. Holzer BLM Meeting: Q & A March 20, Questions and Answers.
Bubble Chamber: Status and Test September 1, 2015.
SL_THOMSON C. Vaccarezza on behalf of the SL_Thomson team.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
g beam test of the Liquid Xe calorimeter for the MEG experiment
Bubble Chamber Schedule – 2017
Collimation and tagging instrumentation
F. Zocca, F. Roncarolo, B. Cheymol, A. Ravni,
IHEP group Shashlyk activity towards TDR
Electron Beamlines Safety Workshop at ELI Beamlines April 2016
Follow-up of HL-LHC Annual meeting
Polarized WACS Experiment (E ) Using Compact Photon Source (CPS)
A precision measurement of d2 on the neutron
C100 Activation Status and Projections JLab Ops Staytreat 2016
MDL0L02 Dipole and Environmental Fields
MDL0L02 Dipole Field July 6, 2016.
MDL0L02 Dipole Field Offset
CEBAF Injector Overview
Real-time orbit the LHC
Bubble Chamber Planning Meeting
Electron Beam Setup for Bubble Chamber
Bubble Chamber Summer 2015 Installation and Beam Test Schedule
Introduction to Bubble Chamber: Ops Training
Beam Energy Measurements for Mott Run II : Dry run for Bubble
Performance Degradation cERL Injector Cryomodule
Polarized Internal Gas Target in a Strong Toroidal Magnetic Field
C.Octavio Domínguez, Humberto Maury Cuna
Progress on J-PARC hadron physics in 2016
Photons centered on collimator
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Riad Suleiman February 2, 2017
Bubble Chamber Experiments at UITF
Installation and Beam Test Schedule
Maximum Credible Beam Event Paul Emma et al
Ion Source and LEBT Beam Diagnostics
Isotope Readiness Review Run Plans
Presentation transcript:

Bubble Chamber – Beam Requirements January 5, 2018

Bubble Chamber Experiment Plan to be installed on March 26, 2018 April run plan: 2 weeks of beam (2 shifts per day) Active liquid is C3F8 Beam energy: 4.5 – 5.5 MeV Beam current: 1 nA – 100 µA Prefer to run with RF at 2K but willing to try 4K Keep chamber installed at 5D line Plan to run again in August: 2 weeks of beam

Bubble Chamber location 5 MeV Dipole 5D Spectrometer Interior Page Design 2 5D Spectrometer

Schematics Power deposited in radiator (100 µA and 8.5 MeV) : 6 mm: Energy loss = 8.5 MeV, P = 850 W Pure Copper and Aluminum (high neutron threshold): 63C(g,n) threshold = 10.86 MeV 27Al(g,n) threshold = 13.06 MeV 0.001 – 100 µA Al Beam Pipe Cu Radiator/Dump 6 mm Bubble Chamber Superheated Al Photon Dump 40 cm long Cu Photon Collimator Ceramic Insulator Interior Page Design 2

Electron Beam Requirements at Radiator Beam Kinetic Energy, (MeV) 4.5–5.5 Beam Current (µA) 0.001–100 Absolute Beam Energy Uncertainty <0.1% Relative Beam Energy Uncertainty (0.1 MeV steps) <0.02% Energy Resolution (Spread), σT /T <0.06% Beam Size, σx,y (mm) 1 Polarization None Interior Page Design 2

Beam Energy Measurement 5 MeV Dipole Beam Position Monitor (BPM) Interior Page Design 2 Electron Beam Momentum

Parameter Term Before Goal Dipole – field map δB/B 0.20% 0.02% Dipole – power supply δI/I Position – surveys δθ/θ 0.01% Position – BPM calibration 0.05% Stray magnetic field Total δP/P 0.30% <0.10% For Bubble Chamber experiment: Installed new higher field dipole with better uniformity Installed new Hall probe: 0.01% accuracy, resolution to 2 ppm, and a temperature stability of 10 ppm/°C Better shielding of Earth’s and other stray magnetic fields Implemented 5 MeV dipole precision DCCT current readback Relative beam energy uncertainty <0.02% is required Interior Page Design 2

Beam Position Measurement Keep beam centered on collimator Measure beam position on radiator – use x-ray fluorescent screen Survey 5D line (radiator and collimator)

x-ray fluorescent screen was installed in front of radiator on Nov 2, 2015 This screen has a special coating that illuminates under x-rays and emits a green light

0.5 μA centered on x-ray screen Need to develop procedure to center beam on radiator using 5D line BPMs and viewers for different beam energies while accounting for earth’s magnetic field

Beam Current Measurement Approved to run 10 μA CW and total energy of 10 MeV – needs approval to run at 100 μA Calibrate BCM and measure nA beam currents Re-isolate radiator to measure beam current Stop beam when chamber is unstable while quenching a bubble