ECAT Field Changes Questionnaire April 2014

Slides:



Advertisements
Similar presentations
ECATS RCCA CAMP PROCESS ENHANCEMENTS
Advertisements

Idaho State Historical Society Pre-Proposal Conference State of Idaho RFP02491 RFP issued (October 23, 2012) Pre-Proposal Conference (October 30, 2012)
© 2010 MediaMind Technologies Inc. | All rights reserved Shelley Hen| Solution Specialist January Buying Module.
This project has been funded with support from the European Commission. This publication (communication) reflects the views only of the author and the.
My rights, my voice project Package 2. Package 2 Development of training programme  Aim: To develop a training programme on the UNCRPD designed for people.
Pre-registration, data-sharing and SIEFs Geert Dancet REACH Workshop – Brussels 18/09/2008.
ROAD ACCIDENT FUND HEAD OFFICE RAF/2012/00002 DATE: 25 JANUARY 2012 ROAD ACCIDENT FUND - MENLYN.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
FAO/WHO Codex Training Package Module 2.6 FAO/WHO CODEX TRAINING PACKAGE SECTION TWO – UNDERSTANDING THE ORGANIZATION OF CODEX 2.6 How does Codex elaborate.
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
Summary of instrument review National Research Coordinators Meeting Windsor, June 2008.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
1 TOWER CONSTRUCTION NOTIFICATION SYSTEM ENHANCEMENTS March 30, :00 PM Room 6-B516 of the Portals II Building 445 Twelfth Street, SW Washington,
Data Management Seminar, 8-11th July 2008, Hamburg 1 ICCS 2009 – On-line Data Collection in the Main Survey.
Gas Forum Proposed Process for UNC Modification Panel & Committee Elections.
1 CA203 Presentation Application Reviewing and Sharing a Presentation Lecture # 11.
DRAFT - Privileged and Confidential - For Internal Use Only and Not for Distribution 1 Intercompany Billing Scenario (ID.07)
Session (edit) PRESENTATION TITLE (edit) Name (edit) Organisation (edit) your organisation’s logo.
September 12-14, 2006OECD-Eurostat Expert Meeting1 OECD-Eurostat Expert Meeting on Trade in Services Statistics Foreign Affiliates Statistics in Eurostat.
Copyright© JSE Limited JSE – Africa’s premier exchange Derivatives API Workshop ITD 09 February 2009.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
Component D: Activity D.3: Surveys Department EU Twinning Project.
HAC/TAC Honors and Awards Liaison Report Basil Hassan Technical Activities Liaison July 30, 2015 (to HAC) September 1, 2015 (to TAC)
Administrators and System Administrators
Modify Existing User Accounts
Data Entry Format 2017.
Talentlink Configuration exercise
Modify Existing User Accounts
CS3015 Beacon Module 4 Messenger & Setting Preferences
GROUP BOOKINGS.
Code Governance Review UNC Modification Proposals
Fix Windows Live Mail Error ID 0X
OECD-Eurostat Expert Meeting on Trade in Services Statistics
T_C_N_L_G_ E D I D I E O Y O H I E B J I R E A A W.
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
PREPARATION OF DOCUMENTATION FOR CONSTITUENT BODIES MEETINGS
Global iShare Database AT ACH Manual for Sales Force
Boeing Supply Chain Platform (BSCP) Detailed Training
Online Training Course
Advanced Invitations.
AOB 1. Finland: question on Printed Paper Deinking test/cover
USOAP Continuous Monitoring Approach (CMA) Workshop
Cayuse 424 Proposal Creation.
Visual Guide to Governance & Strategy Motions Process
Ocean Transportation Intermediary License Renewal System February 2017
SCC P2P – Collaboration Made Easy Contract Management training
This presentation has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational purposes.
First 8 slides are what was presented in San Fransisco…
eSRA in Cognos – An Overview
Distributor Want aka. Dis-WAnt
General ad hoc- LB115- Comment Resolutions – Jan 08
CB forum point 3d - origin
Proposal for Extensible Security
Modify Existing User Accounts
Rebecca Hailes For 15 March 2018
DSC Governance Sub Group Recommendations
TREx ESC Coordinator Training
Modify Existing User Accounts
Module 7: Data Entry (REDCap)
ECAT Import Template An Introduction
Item 5.1. Learning Mobility in Higher Education
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Education and Training Statistics Working Group, May 2011
Evaluations and Trials in Alma
IPPC Member Consultation 1 July to 1 December 2013
Situation of Annual National Accounts data and metadata in 2009
Bruce H. Leeds The Boeing Company June 5, 2008
Registration Step by step guide for suppliers
Gas Customer Forum 28 July 2008
 Customer Satisfaction Progress Report
Presentation transcript:

ECAT Field Changes Questionnaire April 2014 ECAT Field Changes – June 2014 CB Forum

Breakdown 22 CBs responded by April 2014 2 definite changes from Optional  MANDATORY 1 permanent removal from ECAT 1 discussion point and HD proposal 1 definite change to ECAT layout 6 "voting " points HD will send out new questionnaire with only these points for a final decision Deadline: 11 July ECAT Field Changes- June 2013 CB Forum

Vote Step 1: Applicant Company 2 changes optional  mandatory ; 2 discussion points ? Company Name Company Country ? ECAT Field Changes- June 2013 CB Forum

Helpdesk will request IT Team to change text: Vote Step 2: Application Details Second language : voted to change mandatory  optional - Not possible - For external Public ECAT For internal ECAT use ? Helpdesk will request IT Team to change text: "First language"  "Internal language" "Second language"   "External public ECAT language" "Third language"  "Second external public ECAT language" Field status mandatory mandatory optional ECAT Field Changes- June 2013 CB Forum

Step 3: Products/Services 3 discussion points Vote Step 3: Products/Services 3 discussion points ? ECAT Field Changes- June 2013 CB Forum

Step 3: Products/Services Permenantly remove Trade Fair Via the "Trade Fair" field: The licence holder can indicate any trade fairs that they plan to participate in. Step 3: Products/Services Permenantly remove Trade Fair ECAT Field Changes- June 2013 CB Forum

- Similar to trade fair fields - Vote Via the "Tour operator" field (service specific): The licence holder may indicate any tourism fairs that they planned to participate in. - Similar to trade fair fields - Step 3: Products/Services Permenantly remove: tour operator, tourism fair, service agency? ? ECAT Field Changes- June 2013 CB Forum

Merge «PRODUCT» and «EXTENSIONS» Tab Permenantly remove "It makes sense to have all products (both original and added later) in one place" Merge «PRODUCT» and «EXTENSIONS» Tab Permenantly remove "Extensions are also products, so there is no reason to seperate them" Will change to: Products & extensions will be listed on one tab Current List of products & extensions are separated into two tabs ECAT Field Changes- June 2013 CB Forum

Next Steps HD sends out questionnaire to CB with 6 points Deadline: 11 July HD sends proposal to IT Team for them to integrate changes HD publishes ECAT_Admin User Manuals (considering conclusions) once IT Team is finished (end of summer?) ECAT Field Changes- June 2013 CB Forum