Post-PCB Submission Progress Briefing

Slides:



Advertisements
Similar presentations
Icahn Conversion to T. Rowe Price ITS ABOUT BEING THERE. DaVita Inc. Conversion to T. Rowe Price.
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
Design Review Team Digital Burnout Senior Design Fall 2011 Analog Gauge w/ Digital Display.
Globex Proprietary Competition Sensitive Ubiquitous - MP3 Player Ian BrattJohn Pratt Eric LeeWei-Shin Wang David Lindstone ECEN 4573 Capstone Lab Spring.
CSE 115 Week 14 April , Announcements April 14 – Exam 10 April 14 – Exam 10 April 18 – Last day to turn in Lab 8 for any credit April 18.
ECE 477 Design Review Team 01  Fall 2012 Brennan Tran Jonah Ea Ben Pluckebaum Kevin Meyer.
Mind Board Company Profile Company Profile. Meets the challenge of Meets the challenge of creating complex designs PCB DESIGN CENTER.
ECE 477 FINAL PRESENTATION TEAM 7  SPRING 2013 COST ROBOT ERIC OSBORNE, BRYAN DALLAS, ANDREW LOVELESS, CAROLINE TRIPPEL.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Navigation Icahn Conversion to T. Rowe Price IT’S ABOUT BEING THERE. Icahn Conversion to T. Rowe Price.
Daryl SielaffBen McQuiston Will McKennaDavid Hartman Functional Blocks and FMECA Chart.
Project Title (as descriptive as possible) Group Members CPE495 Group ??? Computer Engineering Design I Electrical and Computer Engineering The University.
Massachusetts All-Payer Claims Database: Technical Assistance Group (TAG) August 11, 2015.
ECE 477 Design Review Team 4  Fall 2006 Daryl Dave Will Ben.
ECE 477 Final Presentation Team 14  Spring 2010.
[ Rhythm Reloaded ] Team 6 2nd Progress Presentation.
HMI System for Solar Powered Race Car Jevon Raghubir Mohit Mendiratta Eugene Gordon April 25, 2011 ECE 4007L01 - Dr. Whit Smith.
ECE 477 Final Presentation Team 01  Spring 2014 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
Focus Reviewing Sessions 1 and 2 Learning Target: I understand key concepts presented in Sessions 1 and 2. Success Criteria: I can explain the attributes.
ECE477 Midterm Design Review: Team #
3A.List and describe the events that take place during the boot process. POWER SUPPLY THE POWER SUPPLY SENDS A SIGNAL TO THE COMPENENTS IN THE SYSTEM UNIT.
CTIIP Coordination Co-clinical/animal models July 29, 2015.
CTIIP Coordination Co-clinical/animal models June 24, 2015.
Grant Writing Workshop Crandall ISD Education Foundation.
CS-EE 480 Fall November 2004 Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya Campagna Mason Tabata Weston Kurisu Advisor Dr.
ECE 477 Final Presentation Team 13  Spring 2012 Martin Pendergast, Stephen Edwards, Nick Kwolek, David Duelmler.
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
(Genetic Algorithm Interface Architecture) Final Presentation CS 425 Created By: Chuck Hall Simone Connors Héctor Aybar Mike Grim.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
PCB Design Recreate Logic Root for our personalized needs Incorporate all components onto one PCB.
HMI System for Solar Powered Race Car Eugene Gordon Mohit Mendiratta Jevon Raghubir March 14, 2011 ECE 4007L01 - Dr. Whit Smith.
CS 490 Software Testing Fall 2009 Implement Unit Test Framework for Application running on a Pocket PC 2003 device 10/16/091 Framework for Unit-testing.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
CS-EE 480 Spring January 2005 Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya Campagna Mason Tabata Weston Kurisu Advisor.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
Programming 2 Intro to Java Machine code Assembly languages Fortran Basic Pascal Scheme CC++ Java LISP Smalltalk Smalltalk-80.
全面推开营业税改征 增值税试点政策培训. 什么是营改增? “营改增”中的“营”指的是营业税,“ 增”指的是增值税。对大多数企业来说,增 值税所带来的税负远低于营业税。 减税本身就是积极的财政政策。营改增所 实现的减税,不仅规模大、范围广,它本质 上是一种“结构性减税”,从而构成“结构 性改革”攻坚战中的实招。
WEB 237 Week 5 Learning Team Finalized Paper Only Submit the eCommerce analysis paper and prototype Check this A+ tutorial guideline at
ECE477 Midterm Design Review: Team 1
Team 9 - Scribacious Rabble
NCQA’s Approach to the New Quality Measurement Landscape
1. Mdm Norhidayatul Hikmee bt Mahzan 2. Ms Nur Syahirah bt Kamarozaman
Implementing VHDL Modules onto Atlys Demo Board
Online Economic Development Workshops November 14, 2006 Tips for Proposal Writing To participate online, and to view archived sessions, PowerPoint presentations,
Universal Remote Control
ECE 477 Final Presentation Team 8 Spring 2013
ECE 477 Design Review Team 21 - Spring 2013
STUDENT TRACKER FOR HIGH SCHOOLS
STUDENT TRACKER FOR HIGH SCHOOLS
School choice: How it works
Challenges Implementing Complex Systems with FPGA Components
Process, timeline and overview
Combine to make Contract Plan Sheet files
CSE477 VLSI Digital Circuits Fall 2002 Lecture 14: Midterm Review
ECE 477 Design Review Group 6  Fall 2005
Planning of MISSOC activities for the coming months
ME 280 Lab Final Project Begins November 3rd for sections 3, 4 and 5, and November 7th for sections 1 and 2 Due December 1st for sections 3, 4 and 5 and.
Post-PCB Submission Progress Briefing
ECE 477 Final Presentation Team 3 – Fall 2008
ECE 477 Final Presentation Team 10  Spring 2008
ECE 477 Design Review Team ??  Fall 2012
ME 280 Lab Final Project Begins November 5th for sections 4 and 6, and November 9th for sections 1, 2 and 3 Due December 2nd for sections 1, 2 and 3 and.
ME 280 Lab Final Project Begins November 4th for sections 3, 4 and 5, and November 8th for sections 1 and 2 Due December 2nd for sections 3, 4 and 5 and.
SLMS PTG Technology HAC and Schoology
Wireless Electrocardiogram System Senior Project
The Problem Large video files look nicer but require more space to store and send over networks Smaller files look worse but require less space The tricky.
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
Project Grey Wolf Digital CMOS “Memory” Game
Presentation transcript:

Post-PCB Submission Progress Briefing Daryl Sielaff Ben McQuiston Will McKenna David Hartman

Major Modules PCB Submitted 10/24 Boot up Software / Memory Mapping LCD Initialization / Menu logic USB controller code Note Finding Software IMS –> MIDI converter Playing MIDI files

Timeline October 19: All Parts in Hand for PCB Matching October 20: Final PCB Turn-in November 1 3: All Software Prototyped November 8 10: Get DSMRP Responsive / PCB Populated November 21: Individual PSSCs Working December 6: PSSCs Successfully Integrated December 11: All Team HWs Completed.