Understand for Energy Experts

Slides:



Advertisements
Similar presentations
Energy Savings from Intelligent Metering and Behavioural Change Intelligent Metering EIE/04/107/SO January December 2006.
Advertisements

The magic of metering Save energy, save money and save the environment.
What is e-BRIDGE Accounts? Why e-BRIDGE Accounts? How it works Tabular & Graphical Reports Benefits Content.
DOE O 430.2B Metering Requirements and Status
Application samples All rights reserved, property and © CAD Computer GmbH & Co. KG 2009.
Webinar May 19, What? Why? How? What is a utility bill clean-up? Why is it important? How can it help you? What’s next?
Daniel O Connell Group Environmental Manager. 10% Energy Reduction Programme Why ? Commenced in UK Properties 2004 Cost Of New Contracts +40% avg. Increase.
Scott Starks, PhD, PE Department of Electrical & Computer Engineering UTEP.
Standardization in the Green Buildings field Overall energy performance of buildings Dick (H.A.L.) van Dijk, Senior Scientist at Netherlands Organisation.
EXAMPLE 5 Standardized Test Practice How would the graph of the function y = x be affected if the function were changed to y = x 2 + 2? A The graph.
School Business Support Branch Update. SBSB Update 1 Operational Review Refresh:  Nearly half of all school boards have had a change in Senior Business.
1 National Energy Use Database Glen Ewaschuk Office of Energy Efficiency June 4 th, 2008.
Leaders in Sustainable Energy Stewart Conway & Prakash Patel.
Wireless Infrastructure: Networks and Issues (2) H. Scott Matthews February 26, 2003.
EPC: baseline adaption. Berliner Energieagentur GmbH EPC: baseline adaption Yearly accounting of energy savings - overview corrected energy costs costs.
Thomas Watson, Jr. Former chairman of IBM
ICT Electricity Use - Mapping it - Reducing it Chris Cartledge Independent consultant
Study Hall: Sit in assigned seats, working on something quietly.
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2A: KEEPS.
Manfred Kochsiek Wilfried Schulz Physikalisch-Technische Bundesanstalt Braunschweig und Berlin Modernisation of Legal Metrology in Germany.
Introduction.
Hardware.  Learn what hardware is  Learn different input and output devices  Learn what the CPU is.
DG Environment Green Public Procurement in UK Green public procurement (GPP) - Lead the change National Conference Barbara Morton 08 April 2010 Vilnius,
IMCJAX Blanding Blvd. Suite-222 Orange Park, Fl (904) IMC Who is IMC? IS Asset Protection by implementing:Our business IS Asset.
-Electric Potential Energy and Electric Potential due to Point Charges AP Physics C Mrs. Coyle.
Challenges for district heating methodologies Worldbank Workshop on CDM Methodologies 5 December 2005 Lambert Schneider.
What is Feedback? Biology Climate science Control theory Mechanical engineering Electronic engineering Software engineering and computing systems Social.
Telecommunications Technology Concepts of Technology.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Developing Cooler Alternatives Appleton Career Academy Acheh-leke N. Fonkem December
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
DMS Energy Initiatives The Department of Revenue Complex at CCOC.
Rudan ltd. For efficient energy management. Our Vision With efficient management and application of new technologies, to become a leading company in the.
Energy Conservation in Computer Intensive Learning Environments.
Department of Industrial Engineering Sharif University of Technology Session# 10.
The magic of metering Save energy, save money and save the environment.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
Electrics. Solar Energy Solar water heater Efficient way to heat water at no cost all year long. Work by running copper pipes through a solar panel on.
Делала Ф. Настя 6б класс  This is my dream house it has such rooms  A Bedroom  A kitchen  A living room  A dining room.
EIGHT YEARS OF ENERGY EFFICENCY IN CROATIA MINISTRY OF ECONOMY MINISTRY OF CONSTRUCTION AND PHYSICAL PLANNING ENVIRONMENTAL PROTECTION AND ENERGY EFFICIENCY.
Chapter 3.  Help you understand what hardware is required to allow networks to work including: ◦ Repeaters ◦ Hub ◦ Switch ◦ Bridge ◦ Gateway (not needed.
PRELIMINARY DRAFT EXCERPT RECOMMENDATIONS ON MEASUREMENT AND VERIFICATION METHODS IN THE FRAMEWORK OF DIRECTIVE 2006/32/EC ON ENERGY END-USE EFFICIENCY.
Using Electrical Energy Where is the most electrical energy used?
Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 12: Assuming Management of an.
Involving Pupils & Whole School in Energy Management Max Bishop Schools Energy Officer.
Electrical Engineering
Computer Generations First Generation ( )
Saving Money and The Environment
Graduate Software Engineer BBC
Power Control for Data Center
Brainstorm with your team about anything/everything that is computer hardware. Put one thing on each sticky note.
Electricity and magnetism Chapter Six: Current and Resistance
Principles of Effective Documentation
Name:_________________
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
COACH Our Impact on Energy
LIFE WITHOUT ELECTRICITY
What is a Zero Energy House?
Understand EDI-Net Dashboard
Two Way Tables Teacher Twins©2014.
Thomas Watson, Jr. Former chairman of IBM
Culture statistics Pocketbook Agenda point 10.2
Baseline (Aiming for 4): Identify ‘wasted’
Chapter 8 – Energy balances
Presented By : Virtual Office CanberraVirtual Office Canberra.
Understand Key Features
How electronic systems work using the Systems approach.
Extendible Hashing Example
The cross-media user experience
Principles of Information Technology
Presentation transcript:

Understand for Energy Experts Georg Vogt, Senior Research Consultant Content by

What is Intelligent Metering? Radio Antenna Meters Data Bird Local Logger Many complex graphical formats No means to share with staff or students Often no way too quickly see how buildings are perfomring as a group Central Receiver / Data Logger Computer Modem

EDI-Net Sytem – Building Blocks Building A Building B Local system meters Step / Action H W E Import EDI-Net devices Data synchronisation

EDI-Net Sytem – Building Blocks Building A Building B Local system meters Step / Action H W E Import EDI-Net devices Grouping of meters in a building Baseline for model Climate correction virtual meters HEAT: building A HEAT: building B Data WATER: building A WATER: B ELECTRICITY: A ELEC: B

EDI-Net Sytem – Building Blocks Building A Building B Local system meters Step / Action H W E Import EDI-Net devices virtual meters HEAT: building A HEAT: building B Data WATER: building A WATER: B ELECTRICITY: A ELEC: B Building A Building B C D Grouping of all virtual meters in one building buildings Reports

EDI-Net Sytem – Building Blocks Building A Building B Local system meters Step / Action H W E Import EDI-Net devices virtual meters HEAT: building A HEAT: building B Data WATER: building A WATER: B ELECTRICITY: A ELEC: B Building A Building B C D buildings league tables Department X Collecting of all competitors (buildings) Publication of results Reports Department Y Building Category Schools (A-D,...)

EDI-Net Sytem – Building Blocks Building A Building B Local system meters Step / Action H W E Import EDI-Net devices Data synchronisation Grouping of meters in a building Baseline for model Climate correction virtual meters HEAT: building A HEAT: building B Data WATER: building A WATER: B ELECTRICITY: A ELEC: B Building A Building B C D Grouping of all virtual meters in one building buildings league tables Department X Collecting of all competitors (buildings) Publication of results Reports Department Y Building Category Schools (A-D,...) In principle: Any device can be part of as many virtual meters and buildings as you wish. Same applies to buildings being part of as many leage tables as you wish.

EDI-Net Sytem – Extended Use Case Virtual Meters Building A Building B Local system Step / Action meters H W E Import EDI-Net devices Data synchronisation Grouping of ACROSS buildings to compare consumption Where applicable, devices within buildings might be split up to different VM to analyse across dimensions independent of the building envelope virtual meters for departments HEAT: Department X HEAT: Department Y Data virtual meters for use type HEAT: Class rooms HEAT: Offices