HP-II Workshop on Real-time Hydrological Information Systems

Slides:



Advertisements
Similar presentations
Joint WTO/WB Regional Workshop on Procurement Reform and Transparency Session 9: Technical Cooperation and Capacity Building Capacity Building in Government.
Advertisements

Quality assurance Kari Kuulasmaa 1 st EHES Training Seminar, February 2010, Rome.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
HIS Pre-bid and Bid Evaluation
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Schneider Linear hydroEngine ™ (SLH) Timing Belt Powertrain PI: Abe Schneider.
TIA Solid Waste Consultants, Inc.1 Presented by Miriam Zimms, Senior Consultant TIA Solid Waste Consultants, Inc. Tampa, Florida Pollution Prevention Conference.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
A Model for EAP Training Development Zhiyun Zhang IDE 632 — Instructional Design & Development II Instructor : Dr. Gerald S. Edmonds.
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
Workshop Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 11: Managing HIS During Warranty Period.
Workshop Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Operations & Maintenance and Training.
Workshop Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Training, Operations.
Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrological Technology Module 1: Essential Elements of a Hydrological.
WORKSHOP Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 9: Equipment Delivery.
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
INTRODUCTION Mark Heggli, Meteorologist/Hydrologist Expert Real-time Hydrology Information Systems Innovative Hydrology, Inc. Consultant to the World Bank.
Primer Briefing “Brand Name or Equal” Purchase Descriptions Ask a Professor - # Date:
Unit II Module 1 - RCM Process Overview
MGT 575 Summer 2008 Purchasing. MGT 575 Summer 2008 Steps in the Purchasing Process Accurate description of desired commodity or service Selection of.
Manufacturing Plant maintenance Materials management Quality management.
Sense of Initiative and Entrepreneurship This project has been funded with support from the European Commission. Module Information Sense of Initiative.
Solar PV Tender Overview Ministry of Livestock, Fisheries and Rural Development Department of Rural Development Place - Sule Shangri-La Hotel Date- 4 -
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
Battery Management Programmes keeping your vehicles and Customers on the move.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
World Bank Procurement Procedures Module - Technical Specifications for RTDAS Anish ….. Hydro-Informatics Expert The World Bank.
Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 12: Assuming Management of an.
Mark Heggli, Meteorologist/Hydrologist Expert Real-time Hydrology Information Systems Innovative Hydrology, Inc. Consultant to the World Bank HP-II Workshop.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 2 Produce bales of waste paper using.
Planning Engagement Kickoff
Arkom Engineering Consultants
Systematic Project Management is our answer to the challenges in today’s project business We have the biggest portion of our business volume coming from.
Project Project Objective Component 1 Component 2 Component n …
Trilateral Research EUROPEAN COMMISSION
Data Management Solutions for a Modernized HIS
CERN-ITER Workshop CERN Procurement Anders Unnervik 16 Jan 2017
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
2016 Procurement Framework Contract Management
TEXTBOOK QUALITY STANDARDS
HP-II Workshop on Real-time Hydrological Information Systems
MODULE 2 – Project Introduction
Communication and Consultation with Interested Parties by the RB
Request for Proposal and Selection Procedures
Copyright © Dale Carnegie & Associates, Inc.
Steps during and after a Pre-commercial Procurement
Steps during and after a Pre-commercial Procurement
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Standards Education Committee
Migration - The MED-HIMS Project
The System Selection Process Part II:
GPP Training Toolkit An Introduction European Commission
LARGEST PAINT COMPANY IN INDIA
IAEA Technical Support & Capacity Building Programme M. El-Shanawany
EGEA WG10 3rd meeting – 10/09/2013.
Steps during and after a Pre-commercial Procurement
Industry Engagement Program Medical Diagnostic Imaging (MDI) Equipment
Specifications What should it cover Goods Services Warranty
Steps during and after a Pre-commercial Procurement
Automation Connections ISA EXPO 2006
ALBANIA ROAD MAINTENANCE PROJECT TRAINING WORKSHOP.
Workshop: Equipment June 29, 2006.
Introduction: Real-time Hydrology Information System
Introduction: Real-time Hydrology Information System
The System Selection Process Part II:
Presentation transcript:

HP-II Workshop on Real-time Hydrological Information Systems INTRODUCTION Mark Heggli, Meteorologist/Hydrologist Expert Real-time Hydrology Information Systems Innovative Hydrology, Inc. Consultant to the World Bank

Examples that refer to products are intended for illustrative purposes only, and do not imply an endorsement or recommendation of any particular product

Workshop Goal and Objectives GOAL: Develop Expertise with the Technical Aspects of Acquiring and Managing a Hydrological Information System Objectives Understand the Design of a Hydrological Information System Familiarization with Instrumentation, Data Transmission and Data Management Solutions oh HIS Review Keys to Specifying your Hydrological Information System Understand the pre-bid and Bid Evaluation Phase Equipment Delivery and Acceptance What is involved in Commissioning your Hydrological Information System How to Manage your HIS during the Warranty Period How to Manage and Maintain your HIS after Warranty Period

HIS Process Design Tender Equipment Delivery Equipment Inspection Tender Preparation Pre-bid meetings Bid Evaluation Bid Award Equipment Delivery Equipment Inspection Commissioning Warranty Operation, Maintenance and Training

Workshop Modules I Introduction 1 Topic I Introduction 1 Essential Elements of a Hydrological Information System 2 Current Real-time HIS Solutions 3 Site Selection & Security 4 Training and Operation & Maintenance 5 Specifications 6 Pre-bid, Bid Evaluation, Inspection and Commissioning 7 Managing Your HIS System –Warranty Period & Beyond