NIST Framework and Roadmap for 5

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1542r0 Submission Vertical Applications Technical Advisory Group Smart Grid Task Group Liaison Report Date: Slide.
Advertisements

1 Accelerating Standards for the Smart Grid David Wollman National Institute of Standards and Technology
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
SMART GRID INTEROPERABILITY PANEL TRANSMISSION AND DISTRIBUTION DEWG F2F MEETING December 5, 2011.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Summary of SGIP PAP2 Activities since April 2012 Mingxi Fan, Alex Gogic, Jing Sun TR-45.5 Liaison to SGIP PAP June 11 th,
SMART GRID INTEROPERABILITY PANEL PRIORITY ACTION PLAN 2 WIRELESS COMMUNICATIONS DEC 6, :00 AM MOUNTAIN FACE-TO-FACE PHOENIX, AZ ROOM 162 WEBINAR.
Doc.: IEEE /1112r0 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 10 August 2011 Discussions during.
Doc.: IEEE /0943r0 Submission July Vertical Applications Technical Advisory Group Liaison Report Date: Slide 1 Author:
Doc.: IEEE /0457r0 Submission March Vertical Applications Technical Advisory Group Smart Grid Task Group Liaison Report Date:
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Doc.: IEEE r Submission April 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Summary of SGIP PAP Activities since October 2011 Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP April 16 th, 2012.
Summary of SGIP PAP Activities since October 2011 Mingxi Fan TR-45.5 Liaison to SGIP PAP December 5 th, 2011 ©2011.
Doc.: IEEE Submission March 2007 Michael Lynch, Nortel 22 March Agenda Opening comments and attendance Schedule of meetings/deadlines.
Doc.: IEEE /0468r0 Submission March Vertical Applications Technical Advisory Group Liaison Report Date: Slide 1 Author:
Summary of SGIP PAP2 Activities Update as of August 2012 Alex Gogic, Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
ISO/IEC JTC 1 SWG Smart Grid
IEEE Standards Association and Smart Grid
Smart Grid cyber security within IEC TC57 WG15
Publishing Services at the IEEE-SA
Smart Grid ad hoc – August 2011
Summary of issues and results from GSC-12 IPR WG
Margaret Goodrich June 18, 2010
2018/7/ Smart Grid Activity Will be formed as Executive Committee Study Group Depending on how PAR is developed: Option 1: Form Technical Advisory.
2018/7/ /7/29 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4i May 2011 Closing report Date.
IEEE 802 Smart Grid ECSG September 2012 meeting
Kazunori MATSUO, TTC Cloud Computing Advisory Group
Vertical Applications TAG
22 March Agenda Opening comments and attendance
ETSI Standardization Activities on M2M communications
Smart Grid Interoperability Standards
HIS Smart Grid – Summary (1)
Vertical Applications TAG
Frances Cleveland Convenor WG15
Glenn Parsons, GTSC-9 Chair, ISACC
Vertical Applications TAG Closing Report
Vertical Applications TAG
Standards for Shared ICT
TIA Liaison Report to IEEE
PAD SG Closing Report Date: Authors: November 2012
Outline of presentation
Vertical Applications TAG
Smart Grid cyber security within IEC TC57 WG15
nd Vice Chair’s Report May 2013
Summary of GSC-16 IPR WG Meeting
Smart Grid ad hoc Closing Report – May 2011
Smart Grids activities in ETSI
Security and Lawful Intercept
Project Planning Committee Closing Report - Session #82
Project Planning Committee Closing Report - Session #82
nd Vice Chair’s Report – May 2012
nd Vice Chair’s Report – July 2012
Vertical Applications TAG
Smart Grid Closing Report – November 2010
nd Vice Chair’s Report – Jan 2013
nd Vice Chair’s Report July 2013
nd Vice Chair’s Report – March 2013
IEEE 802 2nd Vice Chair last name at ieee dot org
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
Session # GRIDMAN SG Opening Report
Smart Grid Update – January 2011
Smart Grid Closing Report – November 2010
nd Vice Chair’s Report – Jan 2013
Glenn Parsons, GTSC-9 Chair, ISACC
Telecommunications Standards for Smart Grids
NIST Framework and Roadmap for 5
Presentation transcript:

NIST Framework and Roadmap for 5 12/4/2018 IEEE 802.24 Smart Grid TAG Discussion on NIST Framework and Roadmap for 5 Smart Grid Interoperability Standards, Release 3.0

Updated Framework NIST announcement April 16th: 12/4/2018 Updated Framework NIST announcement April 16th: The Draft NIST Framework 3.0 Now Available for Public Comment URL http://www.nist.gov/smartgrid/upload/Draft- NIST-SG-Framework-3.pdf

Catalog of Standards Table 4-1 “Identified Standards” (p69) Includes 74 standards from various sources IEEE 802 is (still) not included

SGIP Process IEEE 802 input to SGIP Spreadsheets from 802 WG provided over past 3-4 years. SIF documents provided by 802.24 160 standards are on a list of “CoS Standards Review Pending” Including IEEE 802

Next Steps Does this Framework matter anymore? 802.24 consensus: No The SGIP process for maintaining the CoS is apparently not working Is it worth our effort to comment or respond? 802.24 consensus: No, but see next slide

Conclusions and Actions Jay: Work with TIA TR-51 (Jeff Hanna), ETSI , to develop an alternate CoS Identify and IEEE 802 liaison to ETSI Check with Larry Taylor? Include other SDO’s standards. Include Bill Ash as SA representative Ben will develop contacts with TIA and ETSI. Limit our CoS to data link standards that are used in grid applications. Drafting of response to NIST: Matt G.