PS Machine Changes during the 2009 Shutdown

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
M. Attal, 10 th Technical Advisory Committee Meeting, May 10-11, 2010, Allan, Jordan Synchrotron-light for Experimental Science and Applications in the.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
PS and East Area re-commissioning with beam from the CCC after a 17 month shut-down R. Steerenberg with help of many colleagues from different groups PS.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
MG - APC meeting 29/02/20081 MTE commissioning strategy and requirements M. Giovannozzi What is needed to implement MTE ScheduleCommissioning Acknowledgements:
2/June/2009LHCb Upgrade1 Single ended ADC Differential ADC –Convert single ended signal to differential (use AD8138 amp) –ASIC differential output ADC.
Controls Issues Through the Backbone R. Steerenberg with help of many colleagues ATC – ABOC Days 23 January 2007 ATC – ABOC Days 23 January 2007.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
18/March/2008OP-days S.Mataguez / O.Hans1 Hardware Problems in the PS complex LINAC 2 BOOSTER PS AD Thanks to all that helped and provided information,
Readiness for RF capture Cavities – all 16 cavities commissioned with RF feedback loops closed klystron polar loop still to commission on 2 cavities 2.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
PS Orbit Second year of TMS Operation Stéphane Bart Pedersen BE-BI-SW July BE-BI-SW July 2013.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Preparation Phase of the FAIR Project
Results of the 2007 BLM hardware tests in LSS5
SPS Applications Software issues - startup in 2006 and legacy problems
Summaries and conclusions of the MTE Workshop
ABT-EC EYETS Activities 2nd reports
Brief Status SPS Prototype PSB Prototype Installed in LS1
Jorge Sánchez-Quesada BE-RF-FB
ELENA installation and commissioning status
LAPP BPM Read-out Electronics
LIU Wire Scanner Milestones June 2017
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Evolution and future of the Access safety and control systems
Injectors BLM system: PS Ring installation at EYETS
Instrumentation for SPS 2006 restart
Status of the BI Work Package in the LIU-PSB frame
Installations, modifications, consolidation in 2005:
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
Digitizers in CCR for transverse wide-band pick-ups
SPS East Extraction bump inhibit during COLDEX operation
YETS PS + PS SWY + TT2 Facility Coordinator:
James Ridewood BE-OP-SPS
Disabling Rules.
Real-time orbit the LHC
Yannick Dietrich François Bouvet SOLEIL
Interlocking of CNGS (and other high intensity beams) at the SPS
Status and experience of Liberas at Soleil
Cryomodule Assembly Plan
Experimental Areas – LS2 planning
Preliminary analysis of PS septum 31 failure August 8th, 2008
Operational Experience with LCLS RF systems
ABP/RTL Main RTL Activities for 2007/8:-
ELENA / AD Pick-ups and Schottky
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
SPS Injection BIS - Draft requirements
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

PS Machine Changes during the 2009 Shutdown R. Steerenberg With thanks to Simon Mataguez, who carefully maintains the shutdown logbook. Shutdown Lecture 12 March 2009

Main magnet renovation The first phase of the Main Magnet Unit renovation finished last shutdown. Now we have 51 renovated magnets in the machine The main magnets that were moved out and in the machine and have been renovated last shut down are the following R-type: 26, 70, 72 S-type: 99 T-type: 23, 65, 69 U-type: 58, 68 4 renovated spares available We will do a beam based realignment. MMU25 8-loop was repaired without moving the magnet R. Steerenberg Shutdown Lecture - 12 March 2009

F16.QFO105 and vacuum chamber The vacuum chamber in the QFO105 was changed The QFO105 spare magnet is now installed R. Steerenberg Shutdown Lecture - 12 March 2009

Building 365 re-cabling work The patch panels in building 365 were removed and new cables go now directly from the power converter to the magnets This means that also all the interlocks have been re-cabled The elements concerned are: QSE, XSE, BSW23, BSW57 BSW31 QKE16, QKE16-25, QKE16-73 ODE Triplets Doublets R. Steerenberg Shutdown Lecture - 12 March 2009

Shutdown Lecture - 12 March 2009 New power converters New power converters, replacing the old TEKELEC’s, were installed for the following magnets/circuits in building 365: ODE QSE, XSE, BSW23 The Power converter for the BSW57, which was operated at the limit of the rms current of 200A was upgraded to 400A R. Steerenberg Shutdown Lecture - 12 March 2009

Shutdown Lecture - 12 March 2009 Doublet circuits The doublet circuits have been re-cabled in the ring to allow a different balancing Configuration 2009: A: 19, 27 and 87, 95 B: 29, 37 and 61, 69 Triplets Doublets A B Configuration 2008 Triplets Doublets A B Configuration 2009 R. Steerenberg Shutdown Lecture - 12 March 2009

Shutdown Lecture - 12 March 2009 Fast Wire Scanners Fast wire scanners: New electronics, FESA class and application for the PS fast wire scanners. See presentations of Ana and Elliot Special MTE island Peak fit is under development by Jean-francois Comblin No analogue signal on OASIS for the moment FWS H54, H64, V65 and V85 are available and calibrated The installation of the FWS in 75 for MTE was cancelled saturated saturated R. Steerenberg Shutdown Lecture - 12 March 2009

Shutdown Lecture - 12 March 2009 SEM-grids upgrade In/out movement was renovated and is now controlled by PLC from building 365. (CFP-365-GRID) This renovation means replacement of the GM class by a FESA class and the use of the new JAVA application made by Jean-Francois Comblin The equipments concerned are: PR.MSF42,48,52,54, H et V, et du ralentisseur PR.RAL 12 The SEM-grids and SEM-fils in the TT2 line are prepared, but not yet implemented on OP request. The old system in combination with the old application provides ABS and the new does not R. Steerenberg Shutdown Lecture - 12 March 2009

Shutdown Lecture - 12 March 2009 BBQ See also presentation of Marek Gasior The new system was adapted to have better performing means of exciting the beam Chirp now adjustable in frequency range and amplitude One turn kick is re-introduced There are now two systems installed, but only one front end Pickups in SS69 and SS72 Marek can connect either of the two systems Advantage in case of break down Advantage as new development can be tested without compromising the operational system R. Steerenberg Shutdown Lecture - 12 March 2009

Shutdown Lecture - 12 March 2009 RF Radial loop The radial loop uses 3 CODD style pick ups in SS22, 51 and 96 There has always been a difference between the CODD MRP and the RF MRP due to the fact that the position of the pickups was not optimum This shut down a 4th pickup was added with the aim to better center the beam in the machine and to reduce the difference between CODD MRP and RF MRP This pickup, which is situated in SS76, will not be active immediately, but can be enabled at will. MD’s will take place before activating it R. Steerenberg Shutdown Lecture - 12 March 2009

Shutdown Lecture - 12 March 2009 Vacuum chamber SS01 The SS vacuum chamber is now made of 2 parts in order to avoid having to open the MTE sextupoles every year R. Steerenberg Shutdown Lecture - 12 March 2009

Shutdown Lecture - 12 March 2009 Other: Main power supply with FGC control See presentation Jean-Paul Burnet, Quentin King and Pierre Freyermuth New simulated B-train hardware The power converters of SMH16 and SMH26 were moved from building 367 to building 359 As a consequence the cabling was redone Vacuum control was renovated Naming of equipment was reviewed and is different Control now via PVSS (linux version) Pressure reading should remain available in WS Two additional OTR screens are installed in the TT2 line F16.MTV229 and F16.MTV241 CODD pickup gains have been redistributed and recalibrated Gain control will become apart to have compatibility between CODD and new orbit measurement system TT2 (SPS) pickups will be on samplers R. Steerenberg Shutdown Lecture - 12 March 2009

Shutdown Lecture - 12 March 2009 Potential issues: Main magnet 63 make a sighing noise, which is for the moment not understood. It is no obstacle in the vacuum chamber, that was checked QSK57 will not be available as there seems to be an interruption in the 400 meter cable. ....... This list is surely not exhaustive, any additional information is welcome and will be added. R. Steerenberg Shutdown Lecture - 12 March 2009