WIC Meeting, Moscow, 27-30 Jun 2006 WSO/UV A proposal for a Science Management Plan Draft I. Pagano.

Slides:



Advertisements
Similar presentations
ESWW4, 5-9 th November 2007 Draft Proposal: Space Weather as part of an Optional Space Situational Awareness Programme A.Glover, E. Daly, R. Marsden, A.
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Polarisation as a tool to study the solar system and beyond COST Action MP 1104.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Standards Definition of standards Types of standards Purposes of standards Characteristics of standards How to write a standard Alexandria University Faculty.
Configuration Management
Ensuring that building products meet code requirements ICC Evaluation Service, Inc. The ICC-ES Evaluation Committee conducts open public hearings on proposed.
Donald T. Simeon Caribbean Health Research Council
Project FP7-PEOPLE-IRSES: ASK no
Peter Griffith and Megan McGroddy 4 th NACP All Investigators Meeting February 3, 2013 Expectations and Opportunities for NACP Investigators to Share and.
Status of implementation of the Ronald Vargas and Ines Beernaerts Food and Agriculture Organization of the United Nations Samarkand, Uzbekistan - 10 September.
IPCC Products, Procedures and Processes Amsterdam, 14 May 2010 Dr. Renate Christ, Secretary of the IPCC.
ACCOUNTING INFORMATION SYSTEMS
10 th COP / 26 th MOP; Paris, France; November, th ORM Meeting Report & Recommendations Report from the 9 th Meeting of the Ozone Research.
Welcome Welcome and thank you for agreeing to become an External Examiner for Goldsmiths, University of London. Our External Examiners play an important.
0 THE NETWORK OF ULTRAVIOLET ASTROPHYSICS Inform for the MTR Review to be held in Corfu (September 2007, 10-11) Prepared by: Prof. Ana Inés Gómez de Castro.
Virtual Workbenches Richard Anthony Dept. Computer Science University of Greenwich Distributed Systems Operating Systems Networking.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Purpose of the Standards
DATA PRESERVATION IN ALICE FEDERICO CARMINATI. MOTIVATION ALICE is a 150 M CHF investment by a large scientific community The ALICE data is unique and.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
APPRAISAL OF THE HEADTEACHER GOVERNORS’ BRIEFING
Andrea Santangelo, Kepler Center-Tü Toulouse, February 2, 2012 “The Organization of the EUSO- Balloon mission” Andrea Santangelo * Kepler Center for Astro.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
Coordinated by: CARBOOCEAN Integrated ProjectContract No (GOCE) Global Change and Ecosystems Summary on consolidated report for year 1.
1 Framework Programme 7 Guide for Applicants
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Developing a result-oriented Operational Plan Training
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
Roles and Responsibilities Of the library trustee NJLTA New Jersey Library Association.
March 2015 Inter-American Network for the Prevention of Violence and Crime.
Harvey Tananbaum Director Chandra X-ray Center Harvard-Smithsonian Center for Astrophysics 13th HEAD Meeting April 8, 2013 Building International Space.
Second expert group meeting on Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Cohesion Policy
NA-MIC National Alliance for Medical Image Computing Publications Guidelines Eric Grimson.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Policy Influencing strategies & Tactics. What is Public policy? Public policy: It is a guideline to the actions of the governments in addressing societal.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Introduction to the 10th Harmonisation conference Helge Rørdam Olesen National Environmental Research Institute (NERI) Denmark Chairman of the initiative.
World Space Observatory/ UV: Status report ( materials for the presentation of Mr. Yu.Nosenko ) Mr. Yu.Nosenko ) WSO/UV is an international space observatory.
CE 401 Climate Change Science and Engineering TuTh 9:10 – 10:25 George Mount and Brian Lamb CEE Laboratory for Atmospheric Research 11 January 2011.
RECOMMENDATIONS FOR THE INSTITUTIONALIZATION OF THE ACTIVITIES OF THE REMJA WORKING GROUP ON MUTUAL LEGAL ASSISTANCE IN CRIMINAL MATTERS AND EXTRADITION.
© 2007 The McGraw-Hill Companies, Inc. All rights reserved. Serving as Designated Leader © 2007 The McGraw-Hill Companies, Inc. All rights reserved. C.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
Oct.10, 2007EAMA7 The next-generation Infrared astronomy mission SPICA Outline of SPICA Scientific Research Concept (SciReC) SPICA 研究コンセプト概要 17 th May.
APPRAISAL OF THE HEADTEACHER GOVERNORS’ BRIEFING.
SoberIT Software Business and Engineering Institute HELSINKI UNIVERSITY OF TECHNOLOGY © Tomi Männistö, Varvana Myllärniemi, 2008 T Software Architectures.
A GEO Label: Status, Issues, Next Steps Hans-Peter Plag IEEE University of Nevada, Reno, Nevada, USA;
EFFECTIVE COMMUNICATION EFFECTIVE COMMUNICATION [UWB 10202] Meeting Mdm Siti Aisyah binti Akiah.
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
DEVELOPMENT OF A WHITE PAPER ON CORRECTIONAL SERVICES Ministry of Correctional Services.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
1 st EGI CMMST VT meeting 19 February 2013 A. Laganà (UNIPG, Italy)
Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Structured Dialogue Brussels, 19 September
Advisory Forum, September 2005 Producing guidelines Johan Giesecke.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
Creation of the Archiving Component of a Memorandum of Understanding (MOU) Template for International Missions IPDA MOU project members.
1 Working with Project Stakeholders in a Statewide Project PMI-SVC PMO Forum Monthly Meeting Dan Conway, PMP October 22, 2008.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Stages of Research and Development
WP3 - Evaluation and proposal selection
Annex III to BS/SC/PDF/A(2003)1
Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.
Updating the Regulation for the JINR Programme Advisory Committees
WP1 - Consortium coordination and management
GEOSS Data Sharing Principles
Report from the 9th Meeting of the Ozone Research Managers of the Parties to the Vienna Convention for the Protection of the Ozone Layer Michael J. Kurylo.
Participation Feedback
Adult Education Survey Anonymisation Point 6
Presentation transcript:

WIC Meeting, Moscow, Jun 2006 WSO/UV A proposal for a Science Management Plan Draft I. Pagano

WIC Meeting, Moscow, Jun 2006I. Pagano Summary Draft of the SMP as elaborated by Willem Wamsteker (as it is in the Spain proposal for ESA NLP support) Hot topics and criticisms Policy of other projects The New Proposal

WIC Meeting, Moscow, Jun 2006I. Pagano From: Proposal to the Annual Call for Support to Nationally Led Projects submitted by SPC Spanish delegation IV.Program and National time distribution The WSO/UV is a fully open project following the recipes laid out in UN A/AC.105/723 Section IV. The scientific community of each country agreeing to participate (minimally the implementation of local Science Operations Centre) has essentially unrestricted access to the data obtained with WSO/UV. The decisions on Scientific and technical matters have been and will be continued to be addressed by the WIC (Section I.5.)

WIC Meeting, Moscow, Jun 2006I. Pagano....continue Past deliberations in the WIC have led to some details of the science management plan as given below The project observing time is distributed as given below for the baseline 5 year mission (2 months of in-orbit testing and verification at L2 not included): Total Observing time 5 years 1.6 x 10 8 sec. Core Programme (see sections I.2.1 – 3)6.4 x 10 7 sec. (744 days) Calibration & Engineering 1.0 x 10 7 sec. (116 days) National Time (Participating Countries)4.3 x 10 7 sec. (500 days) Open Observing time4.3 x 10 7 sec. (500 days) 39% 27.5%

WIC Meeting, Moscow, Jun 2006I. Pagano … continue The Open Observing Time is allocated by an International panel of scientific experts. The National Time (Participating Countries) is allocated by a national panel for each of the countries involved in the implementation process of WSO/UV. These contributions are either in Hardware, Launch or contributions to the Mission Operations. The respective shares in the total WSO/UV Project costs have been established and agreed between parties in the deliberations in the WIC Meeting (document on WSO web site WSO-VIL-PRG-SUM- 0001).WSO-VIL-PRG-SUM The calibration and engineering time will of course be distributed according to the needs of the instruments in close cooperation with the groups building the instruments. This program part will be designed to make the data available in reduced form as soon as possible. The Core Programme will be designed by a Core Programme Team, composed of members of the NWWG. This programme will be submitted to the WIC for final approval. For all data an archival structure will be set up in close coordination with the Virtual Observatory Requirements.

WIC Meeting, Moscow, Jun 2006I. Pagano From: Proposal to the Annual Call for Support to Nationally Led Projects submitted by SPC Spanish delegation IV.Program and National time distribution The WSO/UV is a fully open project following the recipes laid out in UN A/AC.105/723 Section IV. The scientific community of each country agreeing to participate (minimally the implementation of local Science Operations Centre) has essentially unrestricted access to the data obtained with WSO/UV. The decisions on Scientific and technical matters have been and will be continued to be addressed by the WIC (Section I.5.) True: no restrictions to be part of the collaboration BUT After the partners are all identified the WSO/UV project will be aRussian – XX – YY – ZZ (et al) project Some COMMENTS before to go on

WIC Meeting, Moscow, Jun 2006I. Pagano From: Proposal to the Annual Call for Support to Nationally Led Projects submitted by SPC Spanish delegation IV.Program and National time distribution The WSO/UV is a fully open project following the recipes laid out in UN A/AC.105/723 Section IV. The scientific community of each country agreeing to participate (minimally the implementation of local Science Operations Centre) has essentially unrestricted access to the data obtained with WSO/UV. The decisions on Scientific and technical matters have been and will be continued to be addressed by the WIC (Section I.5.) What does it means? How to conceal this with a Core Program and National Time?

WIC Meeting, Moscow, Jun 2006I. Pagano It is time to leave the concept of open project ? Lets go on and see what happened with ESA.

WIC Meeting, Moscow, Jun 2006I. Pagano From AWG response (ASTRO(2006)3) Given the small fraction (anticipated 4% as presented to the AWG) of the observing time available to the ESA community and the lack of a firm plan of a public data archive, the return to the ESA member state scientists is limited. Moreover, the proposal lacked a well developed science management plan approved by all participating agencies. Question: Why 4% only? Where they take this number? It seems about the fractional cost according to the funds requested to ESA.

WIC Meeting, Moscow, Jun 2006I. Pagano From Ana Ines Gomez de Castro (26 Jun 2006) Subject: Re: Science Management Plan Date: Thu, 26 Jan :37: (CET) From: Ana Ines Gomez de Castro To: Norbert Kappelmann CC: Isabella Pagano, Ana Ines Gomez de Castro, Martin Barstow Concerning the science management plan, I stated during the presentation, but it is not written in the application, a "modified" version on Willems original proposal (27% of observing time open to the whole world-wide astronomical community without having to contribute to the project was not realistic). I stated that 40% of the time will go to the core program (as stated in Willem's application) 5-7% of the time gone into calibration etc,,, 5% of the time to developing countries within the WSO-UN spirit 40% guaranteed time to the project partners splitted into fractions proportional to the funding they provide

WIC Meeting, Moscow, Jun 2006I. Pagano Hot topics (from free discussion between colleagues) It is politically important to have a good fraction of Open Time for the international community. It is relevant also for the image of the project in the international contest. From an anonymous referee comment to a paper presenting the WSO Science: –I suggest to add a remark (marginally pointed out in the Introduction) that WSO is intended for world wide use including especially the developing countries (in spite of the fact that the 17 participating countries there is a scarse participation of developing countries). At any rate this point seems to me in contrast with the constitution of a WSO's "core programme".

WIC Meeting, Moscow, Jun 2006I. Pagano From AWG response (ASTRO(2006)3) The AWG recognizes that a follow-up to present/past UV missions is desirable, in particular to study plasmas over a large temperature range and to study the most abundant molecules. The science case of WSO/UV focuses on: –aspects of the reionization of the universe, –early evolution of sun-like stars and –atmospheres of extra solar planets. The AWG finds the science case, as presented, not sufficiently compelling: –The topics are limited and do not represent substantial advances with respect to current knowledge. –The science case is not supported by quantitative assessment of requirements versus mission performance.

WIC Meeting, Moscow, Jun 2006I. Pagano Hot topics It is a fashion in space science (which becomes a standard) to loudly announce one-two major goals of the mission. In fact, this is somewhat easy for dedicated missions like GALEX but rather difficult for such "all purpose" mission like WSO/UV. WSO/UV being properly figured is able to do many things at the edge of modern science. (from my dear friend Boris Shustov) My opinion is that we need to have a Core Program - not strictly confined to few items – reflecting the topical interests of our communities at the edge of modern science.

WIC Meeting, Moscow, Jun 2006I. Pagano A personal view Up to date we – the WIC – have done a good job to look for support from our agencies. The project is now in a more mature phase. Major partners are identified. It is time now to involve ask scientists of countries in which support has been allocated to be very active: –Es. In Italy, contemporary to the Phase A/B1 study of the FCU, the Italian community has to release a document with the main national science goals. The Science Committee (=WIC?) has to take into account the national science documents to: –select the core program –allow the set-up of collaborations between the partners and –identify PIs for each science item in the core program.

WIC Meeting, Moscow, Jun 2006I. Pagano Roadmap for us Decide the time sharing policy (in my opinion the Willem proposal is not bad, but we can do some refining) Decide rules about how to select the science program and who will do this: –Science Committee –TAC Decide the policy after the extension period (5 years + 5 years)

WIC Meeting, Moscow, Jun 2006I. Pagano Lets give a look to the case of other project SMPs es: Beppo-SAX INTEGRAL

WIC Meeting, Moscow, Jun 2006I. Pagano From Beppo-SAX SMP (Italian National project with a collaboration with the Neatherlands) The observing program will be held flexible in order to accommodate those TOO for follow-up observations with the NFI. Furthermore the operation capability of BeppoSAX will allow to acquire the target within a few hours of its discovery. The observations will be organized on the basis of a "Core Program", devoted to systematic studies with particular regard to scientific objectives that exploit SAX capabilities, and a "Guest Observer" program. The time reserved to the Core Program is 80% the first year of the mission, decreasing in the following years. Participation in the Core Program is open to members of the national communities participating in the mission and will be regulated, along with applications for Guest Observer time, by the selection of proposals. This policy will allow the achievement of complex and systematic programs, leaving however ample time for smaller projects.

WIC Meeting, Moscow, Jun 2006I. Pagano From Integral SMP: time policy

WIC Meeting, Moscow, Jun 2006I. Pagano From Integral SMP: guaranteed time

WIC Meeting, Moscow, Jun 2006I. Pagano From Integral SMP the Science Team The INTEGRAL Science Working Team (ISWT) will monitor and advise on all aspects of INTEGRAL which affect its scientific performance. The external members of the ISWT will be: –the Principal Investigators (PIs) whose instruments have been selected for flight –the Principal Investigator who will lead the international collaboration to establish and operate the ISDC, –Mission Scientists – being independent of the PI teams – who provide scientific input to the programme and advise on science operations and development of instruments and ISDC. –In case a PROTON launcher will be used, Russia will be invited to nominate one scientist formally acting as a representative for Russia providing the PROTON launcher. –In case NASA provided ground station(s) will be used, USA will be invited to nominate one scientist formally acting as a representative for USA providing the ground station(s).

WIC Meeting, Moscow, Jun 2006I. Pagano The WSO/UV Science Committee Is it the WIC? See WIC definition and duties in the attachment to the 1 st WIC meeting minute: WSO/UV Distributed Multi-National Phase A study (V 1.0) (Sep 2001, author WW)WSO/UV Distributed Multi-National Phase A study (V 1.0) Is the WIC a Steering Committee? WIC Science Committee –Project PI, –Instruments PIs –National Representatives –Mission Scientists

WIC Meeting, Moscow, Jun 2006I. Pagano Personal view & proposal A time sharing policy document must be accompanied by the definition of the actors (Science Committee, Time Allocation Committee) according to the standards and approved by the funding agencies. The WIC has the duty –to produce the Phase A integrated study (as in the WSO/UV Distributed Multi-National Phase A study (V 1.0) ) WSO/UV Distributed Multi-National Phase A study (V 1.0) –To maintain the official documentation! may be this is a dream, and we are wise to be more realistic just accepting the collection of the national results!