Blanco Optics Report September 2009 R.Tighe Sept 07,2009 Sept 07, 2009

Slides:



Advertisements
Similar presentations
TMT.OPT.PRE DRF011 Thirty Meter Telescope Secondary and Tertiary Mirror Systems International Symposium on Photoelectronic Detection and Imaging.
Advertisements

MCAO Laser Launch Telescope and Periscope Celine d’Orgeville and Jim Catone.
Lab 1 Paraxial Optics Lab in 106A. Look at paraxial optics rules Use a bi-convex singlet at 1:1 conjugates Do it double pass so can see image Lateral.
Edge Sensors for the Schwarzschild-Couder Telescopes David Hanna McGill University UCLA AGIS Meeting June 26-27, 2008.
SAM LGS-v1, Optics, The Laser Box position on SOAR IR Nasmyth Optical Nasmyth At 67.5Deg from IR Nasmyth Note: Laser umbilical cord of 7m has been.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
Mirror Results Presentation AKA Let’s PartY, PartX.
LGS WFS Design Status & Issues Dekany, Delacroix, & Velur Caltech Optical Observatories.
Keck Next Generation Adaptive Optics Team Meeting 6 1 Optical Relay and Field Rotation (WBS , ) Brian Bauman April 26, 2007.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
Large ‘very’ thin mirror making Why you should use thick glass!
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
September 28, 2007LGS for SAM – PDR – Optics1 LGS for SAM Optical Alignment R.Tighe, A.Tokovinin. LGS for SAM Design Review September 2007, La Serena.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
NST PRIMARY MIRROR CELL: ANALYSIS AND SOLUTIONS BBSO, 02/11/2004 Leonid Didkovsky.
Chinese SONG progress and its design introduction Guomin Wang Nanjing Institute of Astronomical Optics & Technology Nanjing.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
Chromatic Aberration and What It Could Mean To You. Often we want to image (and measure) the location of different color proteins inside cells. XY registration.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH September 19th 2008 VST Meeting1.
Lyot Stop Focal Plane Mask OAP3 Out of plane spherical mirror.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Page 1 Adaptive Optics in the VLT and ELT era François Wildi Observatoire de Genève Credit for most slides : Claire Max (UC Santa Cruz) Optics for AO.
K-D-PR Fabrication and testing of KGMT FSM prototype Oct Ho-Soon Yang, Hak-Yong Kihm, Il-Kwon Moon, Jae-Bong Song, Yun-Woo Lee Korea.
12/12/2014L. Proserpio – AXRO meeting, Prague  Definition of terms  Description of the problem wrt the x-ray thin mirrors technologies.
Zero field The 25 ‑ m f /0.7 primary mirror for the Giant Magellan Telescope (GMT) is made of seven 8.4 ‑ m segments in a close packed array. Each of the.
Absolute Calibration of Null Correctors Using Dual-Computer- Generated Holograms (CGHs) Proteep Mallik, Jim Burge, Rene Zehnder, College of Optical Sciences,
The Adaptive Mirror for the E-ELT
IRAM 08/02/12 – Run 3 Cryostat New Pulse-Tube (helium-free). Laboratory performances : Cooling-down time  30-48h Number of cooling cycles so far12 Base.
M1M3 Cell and Support System. M1M3 on Telescope 2 Location of the M1M3 Cell and Mirror on the Telescope.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
Solar orbiter_______________________________________________.
NST PRIMARY MIRROR CELL: ANALYSIS AND SOLUTIONS BBSO, 02/05/2004.
Erbium Microchip Laser Development 1.Erbium:Yb:Glass and Er:Yb:LiNbO3 Status. 2.Problems with 980 nm Laser Pump. 3.Development Plans.
J. H. Burgea,b, W. Davisona, H. M. Martina, C. Zhaob
Lecture 25-1 Locating Images Real images form on the side of a mirror where the objects are, and virtual images form on the opposite side. only using the.
SLAC Collaboration Meeting Image Quality Workshop: State of the Blanco Tim Abbott (owing much to Roberto Tighe) CTIO 2 Dec 2009 Tim Abbott, SLAC Collaboration.
Tip/tilt options Trade Study Report on Stand-alone T/T vs. DM on T/T Stage (WBS ) Brian Bauman December 12, 2006.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
JLG E450AJ boomlift - Electric, 45ft (13.7 m) platform vertical height, AJ= basket jib capabilities. - horizontal span = 7m ton weight, for handling.
Blanco & ETS ACTR, 15 March Blanco Glycol cooling system upgrade – Enrique Figueroa report – ACTR DocDB #266 – “A quotation for a 40ton unit has.
Commissioning Alistair Walker NOAO/CTIO 9/30/ DES Collaboration Meeting October
1 GREAT spectrograph and plugplate discussion Ian Parry Institute of Astronomy Cambridge University UK.
Updates on projects 472, 470, 443, 462, 442, 471, 480, 483, 484 Tim Abbott Changes since 9 July are in blue.
July © Chuck DiMarzio, Northeastern University ECEG105/ECEU646 Optics for Engineers Course Notes Part 4: Apertures, Aberrations Prof.
The Blanco Environmental Control System Alistair R. Walker November
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
Lab 2 Alignment.
25 Optical Instruments Digital Camera with Zoom Lens.
1.
Lab 1 Paraxial Optics Lab in 106A.
Blanco F/8 Status AURA Observatory Council, Tucson, 3/2013.
Blanco Environmental Control System
Locking mechanics.
l 66TH MEETING OF THE ESRF l May 2014 l Author
Alistair Walker Version 3 December
Non-linear Beam Dynamics Studies for JLEIC Electron Collider Ring
Metamaterials for Curved Lenses Geometric optic analysis of lenses composed of continuous negative index media. UCSD.
Accelerator Physics and Engineering Update Jan 6, 2010
Coma-corrected Cross-Dragone Design
Preliminary Design Review
Metrology Improves Pointing at 12m ALMA Telescopes
Radial defining system for the Blanco primary mirror
Brooke Young, Makenna Cooper, Javier Aranguren
Advanced Virgo Finesse Input File
Accelerator Physics and Engineering Update Jan 6, 2010
ITM03; LHO ITMx Post O2 inspection LIGO-T v1
16 Mathematics of Normal Distributions
Status of IR / Nonlinear Dynamics Studies
Presentation transcript:

Blanco Optics Report September 2009 R.Tighe Sept 07,2009 Sept 07, 2009 CTIO/Optics Sept 07,2009

PF IQ 130809 PF Baseline Correction (basepf.par): *bo 0 *b2 369 76 Before shutdown (061106) After shutdown (080709) Az N 38° 7.5° Coma was corrected by translation of PF pedestal: N=0.22mm; W=0.4mm All sky average   foc spher coma ang astig tref. quad Total d80 nm 3243 -1776 316 27 283 77 132 16 85 21 d80 Arcsec (0.41 mm) <=== 2.72 -0.20 0.04 0.09 0.05 0.23 Target:Amplitude in nm (0.1Arcsec d80) 119 909 714 303 256 238 Sept 07, 2009 CTIO/Optics Sept 07,2009

Coma (130809):   PF Coma LUT Aug2009 Mag. Target 714nm Az OPD Mag. nm Ang Deg Zd 15 30 45 60 310 334 729 745 980 172 138 170 159 164 501 580 582 698 123 174 178 206 855 581 590 90 132 223 209 292 321 422 433 82 248 249 221 120 401 418 560 244 121 276 258 150 50 397 505 819 254 204 294 270 180 144 432 426 43 58 356 13 210 188 407 307 504 107 359 22 125 240 217 250 554 1365 106 212 136 117 260 419 754 167 91 135 300 198 604 1020 1633 145 115 131 330 96 405 1100 1526 158 160 360   PF Coma LUT Aug2009 Az PFC corr. trans. mm Ang Deg Zd 15 30 45 60 0.26 0.28 0.61 0.62 0.82 172 138 170 159 164 0.42 0.48 0.49 0.58 123 174 178 206 0.71 90 132 223 209 0.24 0.27 0.35 0.36 82 248 249 221 120 0.33 0.47 244 121 276 258 150 0.04 0.68 254 204 294 270 180 0.12 0.14 43 58 356 13 210 0.16 0.34 107 359 22 125 240 0.18 0.21 0.46 1.14 106 212 136 117 0.22 0.63 167 91 135 300 0.17 0.50 0.85 1.36 145 115 131 330 0.08 0.92 1.27 144 158 160 360 Comment: This is, to first approximation, the coma LUT for Decam. Sept 07, 2009 CTIO/Optics Sept 07,2009

Astigmatism (130809):   PF Astig. LUT Aug2009 Mag. Target 303nm Az OPD Mag. nm Ang Deg Zd 15 30 45 60 227 356 534 410 491 125 85 136 101 210 439 507 562 61 104 102 485 302 432 477 103 99 107 90 305 407 391 448 123 89 98 120 396 274 447 316 68 39 95 91 150 300 236 247 54 79 180 190 194 310 442 72 64 213 78 263 93 53 208 240 252 160 326 34 116 109 270 304 244 318 363 132 186 221 290 100 127 330 281 414 262 114 153 360   PF Astig. Residuals Dec2006 Mag. Target 303nm Az OPD Mag. nm Ang Deg Zd 15 30 45 60 151 440 418 475 459 308 142 171 192 99 285 508 267 669 128 180 132 160 424 - 375 29 131 161 229 90 321 109 318 566 206 218 138 106 120 359 448 274 410 294 195 112 150 347 159 421 292 152 398 24 155 581 281 140 92 210 141 181 173 63 300 240 117 451 332 257 86 191 164 270 64 113 444 163 289 246 271 427 251 58 165 315 330 203 624 552 123 360 Comment: After the radial support shutdown, the values of the Astigmatism LUT are smaller than the residual astigmatism after applying the LUT we had before shutdown. It is expected that after applying this 2009 LUT, the residual Astigmatism will be below 0.1Arcsec at all telescope positions. Sept 07, 2009 CTIO/Optics

Trefoil and Quadratic (130809):   PF Tref. LUT Aug2009 Mag. Target 256nm Az OPD Mag. nm Ang Deg Zd 15 30 45 60 129 100 79 138 291 229 276 170 182 208 167 154 260 331 188 203 183 257 110 261 381 185 233 211 196 90 118 178 179 312 192 191 189 120 125 164 163 176 187 190 150 158 279 193 200 180 132 218 278 201 197 181 146 210 145 173 234 252 198 171 240 95 226 205 209 169 270 329 202 194 300 130 304 157 206 186 165 151 330 236 207 363 223 360   PF Quad. LUT Aug2009 Mag. Target 238nm Az OPD Mag. nm Ang Deg Zd 15 30 45 60 69 48 73 46 91 116 163 188 172 152 59 68 65 63 178 89 166 52 76 49 80 182 125 156 193 90 74 130 218 145 169 160 120 67 81 50 57 165 164 159 150 56 62 61 102 148 138 180 97 123 122 110 131 210 64 51 143 86 149 240 54 129 104 127 187 270 135 42 39 299 41 101 300 75 189 70 213 121 223 330 111 103 141 225 113 204 360 Comment: The Trefoil LUT could be applied because some values are slightly above the target, but not the Quadratic LUT because the values are already smaller than the target. Sept 07, 2009 CTIO/Optics Sept 07,2009

F/8 IQ 030909 PF Baseline Correction (basepf.par): *bo 0 *b2 1680 346 Before shutdown (061106) After shutdown (030909) Results at Zenith after applying the F/8 baseline corrections: Near Zenith   foc spher coma ang astig tref. quad Total d80 nm -1790 -750 100 323 210 334 50 258 130 15 d80 Arcsec (-1.82 mm) <=== -1.50 0.08 0.01 0.07 0.02 0.05 0.12 Target:Amplitude in nm (0.1Arcsec d80) 119 909 714 303 256 238 Sept 07, 2009 CTIO/Optics Sept 07,2009

Mirror Seeing ? (or air problems?) Engineering 090709: Telescope Ha:-4:23,Dec:-14:48 i.e. to the E Engineering 130809: Telescope Ha:-4:23,Dec:-14:48 i.e. to the E Comment: In both cases the same baseline correction was applied. Also the distorted spots are mostly opposite to telescope position. Sept 07, 2009 CTIO/Optics Sept 07,2009

Comments and To Do List (in red: updating previous report) M1 displacement w/r to cell is ~ 1/4 the max. tolerance for coma (~500um); (still is, except when mirror jumps due to air dropping off). To Do short term: Re-measure the aberration skymaps at PF (done) and F/8 (pending). Baseline corrections and LUTs for PF (done) and F/8 (baseline done). Check the counterweights behavior (how close to cell?); (pending but Andres says they should be far away). Implement axial Hard-points Load cells monitoring/logging facility. Implement TCS control to ensure actuator pressure adjusts to telescope slewing fast enough. To Do long term: Re-measure the PFC unit w/r to M1 using the laser projector and Mitutoyos (tbdone as a cross-check, but the real data should be the coma LUT). Finish upgrading the Coating chamber and produce a reliable Al coating recipe before next shutdown (tbdone). Design/Install the new Air Plenum system next shutdown. Sept 07, 2009 CTIO/Optics Sept 07,2009