Luca Giacomello, HGI Chairman

Slides:



Advertisements
Similar presentations
CCPA Annual General Meeting, Rotterdam 6 December 2011 Henning Scholz, Museum für Naturkunde Berlin & CCPA Secretary Proposal for Change to the CCPA.
Advertisements

Barbara M. Altman Emmanuelle Cambois Jean-Marie Robine Extended Questions Sets: Purpose, Characteristics and Topic Areas Fifth Washington group meeting.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
Report doc.: IEEE /0547r0 “The NGMN Alliance is an industry organization of world-wide Telecom Operators, Vendors and Research Institutes (see.
Networks ∙ Services ∙ People John DYER TF-MSP Video Conference Community Procurement Support Building on the SPOT-ON Proposal Smart Procurement,
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
M2M Global Initiative OneM2M April 24, 2012
Authors list to be completed.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
March 2015 Inter-American Network for the Prevention of Violence and Crime.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
HGI activities transfer to oneM2M Group Name: MAS Source: Patricia MARTIGNE (Orange), Deutsche Telekom, Telecom Italia Meeting Date: Agenda.
What and Why? Next steps for oneM2M Semantics Group Name: WG5 Source: Joerg Swetina, Martin Bauer (NEC) Meeting Date: Agenda Item: WI-0005 oneM2M-MAS
1 HGI MESSAGE TO ONEM2M TECHNICAL PLENARY HANS WERNER BITZER, DEUTSCHE TELEKOM VICE CHAIR, HGI ONEM2M TP#19, SOPHIA ANTIPOLS, FRANCE.
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
10 February “FP6 Networks of excellence” Colette Renier Research DG.
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Doc.: IEEE /0045r0 Submission March 2006 Carl R. Stevenson, WK3C Wireless LLCSlide 1 IEEE WG Closing Report – March 2006 IEEE P Wireless.
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
ETSI TC Cable in a nutshell
Overview of oneM2M Home Appliances Information Model
SIMalliance Members & Strategic Partners
SIMalliance Members & Strategic Partners
Priorities of TTA Jaemoon Park President TTA Document No:
Consolidated M2M standards boost the industry
Process for SW Development
ATIS Open Source IoT (OS-IoT)
CH6 Deploying in the Field
ETSI - HGI – PUBLICLY AVAILABLE SPECIFICATION (PAS)
Possible options of using DDS in oneM2M
EMR Consultation, HRH Observatory, Tunis, September 2010
SIMalliance Members & Strategic Partners
ISACC Activities Since GSC-16
Digital Repository Audit and Certification BOF
Panel: Needs and Plans for OpenWrt
OmniRAN Introduction and Way Forward
Session II: System authority for ERTMS 4RP Trackside approval
ETSI Standardization Activities on M2M communications
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee
Glenn Parsons, GTSC-9 Chair, ISACC
ETSI Standardization Activities on M2M Communications
JRC’s Follow-up work to improve GES assessment
An Introduction to Software Engineering
CEPMC Executive Board and General Assembly EC standardisation package
Liaison report from the Wi-Fi Alliance to WG
Statistics Governance and Quality Assurance: the Experience of FAO
IEEE WG Closing Report – March 2006
S-101 Validation Checks Danish Geodata Agency 09 December 2018.
HGI (Home Gateway Initiative) Progress report
ETSI Standardization Activities on M2M Communications
Current standardization activities – oneM2m
GISFI #5 Meeting Report: SIG (Special Interest Group)
ISACC Activities Since GSC-16
IMT-Advanced Overview - March 2007
Converged Network Management
NFV Deployments and Challenges Panel
Roger Marks (Huawei) capable 9 January 2019
SMART HOME Expectation IN STANDARDS
Overview Headlines SIP Summary of progress High level plan
IMT-Advanced Overview - March 2007
3GPP LAA Liaison Approval Process
ETSI Contribution to 3rd Meeting of EC Expert Group on RRS
Item 2.2 of the agenda IT Working Group meeting 2016
Glenn Parsons, GTSC-9 Chair, ISACC
Recent Standardization Activities on Cloud Computing
“Methodology for RESTful APIs specifications and testing”
“Methodology for RESTful APIs specifications and testing”
Presentation transcript:

Luca Giacomello, HGI Chairman www.homegateway.org HGi Symposium in Venice march 8&9 , 2016 Introduction to hgi downstreaming Luca Giacomello, HGI Chairman www.homegateway.org

Shutting down HGI… HGI was never intended to last for ever Initial duration indicated in the Statutes: 2 years As we did like it  this was replaced by an assumed renewal every 2 years, unless there was a vote to sunset The Board kept the responsibility to monitor the technical and financial health of the organisation throughput the years. In particular: A major strategic review in 2014 led to increased emphasis on the Smart Home, and the creation of the Services and Business Insight Group (SBI) HGI operator founder members, and the full Board, have monitored major trends and recent changes in the SDO landscape and way of working, fragmentation of markets, major differences in markets between countries, etc. A real need for consolidation in the SDOs’ and interest groups’ participations arose

Shutting down HGI…(2) A range of options was intensely debated e.g. a merger, significant slimming down, and controlled closure .... It was agreed by the Board and approved by HGI members to : Complete the ongoing important topics Archive both these, and many previous HGI specifications, so they remain available to operators and vendors alike for several years where appropriate, disseminate/ promote some topics into other organizations (first thought: progressing the smart home related work in oneM2M)

Some already ongoing actions Downstream to OneM2M of the whole set of activities related to smart home and in particular: Home gateway Smart Home architecture Smart Home Device template (SDT, open source activity) Publication as ETSI documents of some of the HGI deliverables finalized in the last period (details will follow): Home Gateway Smart Home architecture Wireless Home Area Networks requirements Open Platform 2.0

Open discussion on future actions Main topics: Again, smart home Wi-Fi requirements Hardware virtualization/modularity as general topic OSGi specific requirements for Open Platform Hybrid access use cases and business requirements SBI-like (unique WG dealing with business insights) continuation Did I forget something? 

Some (almost personal) views…reactions? On Smart home OneM2M could increase its role as aggregator for harmonizing different approaches (already collecting OIC, Allseen, HGI SDT etc.); maybe leveraging on an operators’ internal group? Wi-Fi requirements: operators’ group and single HGI contributors could push for testable requirements on channel selection, repeaters, NFC use, hotspot to complement Wi-Fi certification, according to HGI views on the topics Open Platform will hopefully become an ETSI spec; how OSGi could manage that is to be discussed (we have different IPR policies) Could ETSI take over the maintenance of the test specifications produced by HGI on OP 2.0, soon public? If not the test activities? Or prpl? Hybrid access doc can become a contribution to BBF further developments on that area SBI could converge to BBF project according to the proposal received Hardware virtualization can be a topic for future developments by prpl, possibly also involving other silicon vendors Prpl carrier grade OpenWrt : a good occasion to aggregate a critical mass for getting tangible results and exploit them in future HGs software deployment