SBS Front Tracker GEM short update on inefficient sectors

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
1 HBD HV Status Update Jason for the HBD crew Jan 30, 2007.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
Front GEM Chambers Design concepts –Foils –Mechanics Electronics and DAQ Performance Current activity and plan Evaristo Cisbani / INFN-Rome Sanità group.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Update on GEM-based Calorimetry for the Linear Collider A.White 1/11/03 (for J.Yu, J.Li, M.Sosebee, S.Habib, V.Kaushik)
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
MPD HW & firmware status UVa Back Tracker parts status SBS JLAB 1 16 December 2015 Paolo Musico and Evaristo Cisbani GEM Readout Update.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
System Test Assembly 20th Oct 2009 M. Kurosawa. Current Status Performed system test with new FEM and software. Visit VICRISE on 13th Oct. 2-L and 8-R.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Profiler Mechanics Update
Electronics for GEM R&D at the University of Virginia
University of Wisconsin
CLAS12 DAQ & Trigger Status
LKr status R. Fantechi.
T1 Electronic status Conclusions Electronics Cards:
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Status of the Front Tracker GEM
TPC Paul Colas Technical meeting, Lyon.
ATLAS Muon Spectrometer and
Pierluigi Paolucci - I.N.F.N. Naples
UK CMS Oversight Committee Mtg
RPC Readiness for installation
CAN branch PSU – Update meeting
(On Behalf of CMS Muon Group)
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

SBS Front Tracker GEM short update on inefficient sectors 29/May/2017 E. Cisbani 12/4/2018 FT status - Inefficient Sectors

Origin of Inefficient sector The HV distribution line is interrupted between the protective resistor and the border of the GEM frame – the sector does not get HV. Cut is likely due to eccessive soldering of the protective resistor which extends beyond the expected pads (see GEM radiography) combined to bending of the kapton foil due to module handling (and/or transportation): the extra soldered border acts as blade for the HV line Internal GEM Protective resistor area HV common HV path GEM Radiography Frame 12/4/2018 FT status - Inefficient Sectors

Recovering inefficient sectors – mod 9 & 14 short sector Fixed (2 foils) (1 foil) Before Xray irradiation Fixed (1 foil) After 12/4/2018 FT status - Inefficient Sectors

Conclusion (on inefficient sectors) Inefficient sectors can be recovered by soldering a thin wire jumper across the HV line cut All inefficient sectors fixed so far (5 on 2 modules) work well We expect to recover all inefficient sectors (13) We are adopting some precautions: Solder the resistor on the designed small pads (do not extend soldering on the HV path) Handle GEM foils with extra care GEM packing for transportation to be revised Work is in progress for the short sectors (9) 12/4/2018 FT status - Inefficient Sectors

FT status - Inefficient Sectors FT Status Summary GEM modules 6 modules at JLab: 3 of them need inefficient sector fixing, 1 looks completely dead – rework planned in July/2017 9 modules in Rome: 3 fully tested and fixed, 4 on queue for x-ray testing and reworking (if needed), 2 ready for HV training – 6 modules plan to be delivered at JLab within mid July (if test/rework will be fine) and then assembled into chambers second half of July. 3 modules in Catania waiting completion: 2 almost completed (missing readout window FR4 frames  ordered), 1 in the queue for assembling 3 additional modules planned (material ordered at CERN, ready in June) (2 modules rejected so far, due to problems during assembling) Chamber Carbon Frame First complete frame tested on May/15th (couple of details need minor rework); expected delivery of all frames (6 chambers) to JLab from company (RIBA composites) within mid July Electronics/DAQ Hardware: all seems to be on hands, except optical fiber transcievers and proper length (10 m?) HDMI cables Firmware: SSP-MPD integration largely completed; work in progress in bug fixing and performances improvement 12/4/2018 FT status - Inefficient Sectors